• 제목/요약/키워드: Information Costs

검색결과 2,750건 처리시간 0.039초

Forecasting the Future of the Desktop Monitor Market

  • Young, Ross
    • 전자공학회지
    • /
    • 제28권4호
    • /
    • pp.89-96
    • /
    • 2001
  • The LCD monitor market enjoyed rapid growth in 1999 but only experienced modest growth in 2000. It is now poised for rapid growth from 2001 to 2005 as prices and costs decline. Price reductions will enable LCD monitors to move beyond limited vertical markets and extend into the broader consumer markets. This article will examine the future outlook for LCD monitors and provide a growth forecast.

  • PDF

문화유산정보 말뭉치 구축을 위한 개체명 및 이벤트 부착 도구 (Named Entity and Event Annotation Tool for Cultural Heritage Information Corpus Construction)

  • 최지예;김명근;박소영
    • 한국컴퓨터정보학회논문지
    • /
    • 제17권9호
    • /
    • pp.29-38
    • /
    • 2012
  • 본 논문에서는 문화유산정보 말뭉치 구축을 위한 개체명 및 이벤트 부착 도구를 제안한다. 제안하는 도구를 이용하여 말뭉치 구축자는 문화유산정보 관리에 유용한 시간, 장소, 인물, 사건을 중심으로 개체명과 이벤트를 부착할 수 있다. 이 때, 개체명과 이벤트 부착이 용이하도록, 제안하는 도구에서 줄번호나 어절번호와 같은 개체명이나 이벤트의 위치정보를 자동으로 부착하며, 구축된 개체명이나 이벤트 중에서 하나를 선택하면 해당 문자열을 원문에서 진한 이탤릭체로 표시하여 올바르게 부착되었는지 쉽게 확인할 수 있다. 그리고, 제안하는 도구는 말뭉치 구축자의 수작업을 줄이기 위해서 개체명 자동인식 패턴을 활용한다. 학습말뭉치가 거의 없다는 점을 고려하여 단순한 규칙 패턴을 학습한다. 또한, 오류 전파를 차단하기 위해서, 제안하는 개체명 자동인식 패턴은 개체명 부착 말뭉치에서 추가적인 분석처리 없이 바로 추출한다. 실험결과 제안하는 개체명 및 이벤트 부착 도구는 말뭉치 구축자의 수작업량을 절반이상 줄여주었다.

Designing Bigdata Platform for Multi-Source Maritime Information

  • Junsang Kim
    • 한국컴퓨터정보학회논문지
    • /
    • 제29권1호
    • /
    • pp.111-119
    • /
    • 2024
  • 본 논문에서는 해상에서 수집되는 다양한 출처의 정보들을 수집할 수 있는 빅데이터 플랫폼을 제안한다. 현재 운영되는 해양 관련 빅데이터 플랫폼들은 만들어진 데이터를 저장 및 공유하는데 초점이 맞추어져 있고 데이터 수집과 전처리는 데이터 제공자가 각자 담당한다. 지상 대비 열악한 통신망을 사용하는 해양 환경에서 데이터를 수집 및 통합하는 것은 높은 비용과 비효율성이 존재하며, 이로 인해 관련 인프라의 구현이 쉽지 않다. 특히 기상 정보, 레이더 및 센서 데이터 등 실시간 데이터 수집 및 분석이 필요한 분야의 경우 통신망 문제와 더불어 데이터 보안, 조직과 선박의 특성, 데이터 수집 비용 문제 등 지상 대비 다수의 문제를 고려해야 한다. 먼저 본 논문에서는 이 문제들을 정의하고 해결방안을 제시한다. 그리고 이를 반영한 빅데이터 플랫폼 설계를 위해 데이터 소스, 계층적 MEC, 데이터 전송 구조를 우선 제안한 후 이를 모두 통합한 전체 플랫폼 구조를 제시한다.

Bayesian Model for Cost Estimation of Construction Projects

  • Kim, Sang-Yon
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.91-99
    • /
    • 2011
  • Bayesian network is a form of probabilistic graphical model. It incorporates human reasoning to deal with sparse data availability and to determine the probabilities of uncertain cases. In this research, bayesian network is adopted to model the problem of construction project cost. General information, time, cost, and material, the four main factors dominating the characteristic of construction costs, are incorporated into the model. This research presents verify a model that were conducted to illustrate the functionality and application of a decision support system for predicting the costs. The Markov Chain Monte Carlo (MCMC) method is applied to estimate parameter distributions. Furthermore, it is shown that not all the parameters are normally distributed. In addition, cost estimates based on the Gibbs output is performed. It can enhance the decision the decision-making process.

FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출 (Identification of Claim Elements for Design Build Projects using FMEA Method)

  • 윤석민;현창택;한상원;차용운
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

시간/비용의 트레이드-오프를 고려한 2목적 스케쥴링 문제 (A Bicriterion Scheduling Problem with Time/Cost Trade -offs)

  • 정용식
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1998년도 공동추계학술대회 경제위기 극복을 위한 정보기술의 효율적 활용
    • /
    • pp.731-740
    • /
    • 1998
  • This paper discusses a brcriterion approachto sequencing with time/cost trade-offs. The first problem is to minimize the total flow time and the maximum tardiness. And second is to the maximum tardiness and resource allocation costs. This approach , which produces an efficient frontier of possible schedules, has the advantage that it does not require the sequencing criteria to be measurable in the same units as the resource allocation cost. The basic single machine model is used to treat a class of problems in which the sequencing objective is to minimize the maximum completion penalty. It is further assumed that resource allocation costs can be represented by linear time/cost function.

혼합물 생산공정의 최적 공정평균의 경제적 선정 (Economic Selection of Optimum Process Mean for a Mixture Production Process)

  • 이민구
    • 품질경영학회지
    • /
    • 제33권4호
    • /
    • pp.111-116
    • /
    • 2005
  • This paper considers the problem of optimally choosing the sub-process means of a mixture production process where two important ingredients are mixed. The quantity of each ingredient is controlled through each corresponding sub-process. The values of the sub-process mean directly affect the defective rate, production, scrap and reprocessing costs for the mixture production process. After inspecting every incoming item, each conforming item is sold in a regular market for a fixed price and any nonconforming item is scraped. A model is constructed on the basis of the selling price, production, inspection, and scrap and reprocessing costs. The goal is to determine the optimum sub-process mean values based on maximizing expected profit function relating selling price and cost components. A method of finding the optimum sub-process means is presented when the quantities of the two ingredients are assumed to be normally distributed with known variances. A numerical example is given and numerical studies are performed.

프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례 (A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management)

  • 정하성;이동화;이민구
    • 품질경영학회지
    • /
    • 제33권3호
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

A Study on the Sensorless PMSM Control using the Superposition Theory

  • Lee, Young-Jin;Yoon, Young-Jin;Kim, Young-Ho;Lee, Man-Hyung
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제4권2호
    • /
    • pp.5-12
    • /
    • 2003
  • This study presents a solution to control a PMSM without sensors. The control method is the presented superposition principle. This method of sensorless theory is very simple to compute estimated angle. Therefore, computing time to estimate angle is shorter than other sensorless methods. The use of this system yields enhanced operations, fewer system components, lower system costs, efficient energy control system designs and increased efficiencies. A practical solution is described and its results are given in this study. The performance of a sensorless architecture allows an intelligent approach to reduce the complete system costs of digital motion control applications using the cheaper electrical sensorless motors. This paper deals with an overview of solutions in the sensorless PHSM control applications, whereby the focus will be the new sensorless controller and its applications.

국제기술이전 거래에서의 계약이행과 상사분쟁 예방 (The Execution of International Technology Transfer Contracts for Avoiding the Commercial Disputes)

  • 심상렬
    • 한국중재학회지:중재연구
    • /
    • 제18권3호
    • /
    • pp.71-89
    • /
    • 2008
  • International technology transfer(ITT) or technology trade is a very comprehensive term covering various mechanisms and channels for shifting technologies across borders. Thus, it refers to numerous complex processes, ranging from innovation and international marketing of technology to its absorption and imitation. It includes technology, trade, and investment. Markets for exchanging technologies are inherently subject to failure due to appropriability problems, spillovers, asymmetric information, and market power. Thus, there is strong justification for public intervention. Technology developers are interested in reducing the costs and uncertainty of making transfers, along with protecting their rights to profit from such transfers. On the other hand, technology importers are interested in acquiring knowledge at minimal costs, asking for restricting sharply the exclusive rights of foreign firms to exploit technology. The purpose of this paper is to review the characteristics, risks, legal issues and contractual check points of ITT, focusing on the avoidance of commercial disputes during the very complex processes of ITT.

  • PDF