• Title/Summary/Keyword: Industrial facility

Search Result 1,114, Processing Time 0.027 seconds

Arc Generation Facility with Auxiliary Current Source Using LC Resonance Circuit (보조 전류원 커패시터 뱅크를 가지는 LC공진회로를 이용한 아크발생 실험장치에 관한 연구)

  • Kang, J.S.;Park, H.T.;Lee, B.W.;Seo, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 1999.11d
    • /
    • pp.1054-1056
    • /
    • 1999
  • It is necessary to install the arc generation facility to obtain the important technology for the design of breakers and switches, and the improvement of their performance and reliability. With this facility it is possible to study the characteristics of Arc in air/gas/vacuum insulation environment. The arc generation facility briefly consists of capacitor bank which can charge enormous energy, an air-core reactor, and several measurement equipments. This facility can simulates the arc phenomena in breakers and switches by means of generating high currents. In order to the protect electrode damage during the arcing time in arc extinguishing chamber, we installed auxiliary current source in addition to main capacitor bank, This auxiliary current source produces relatively small arc between electrodes before high current generation by main capacitor bank. Therefore it is possible to observe and measure the arcing phenomenon without damage of electrodes.

  • PDF

A Study for Development of Facility Management System Using GIS (GIS를 이용한 시설물관리시스템 개발에 관한 연구 - 강원대학교를 중심으로-)

  • Yang, In-Tae;Yu, Young-Geol;Chun, Ki-Sun;Park, Jai-Kook
    • Journal of Industrial Technology
    • /
    • v.23 no.A
    • /
    • pp.101-107
    • /
    • 2003
  • In university of Korea, the computerization of facility management is lower level than other management areas such as educational matters, administration, library, computing center, teaching assistance, and teaching methodology. So we need urgently the blueprint for an information-oriented and integrated facility management system. In this research, It is presented and implemented an FMS(Facility Management System) for efficient management of the ground and underground facilities on a campus. This studies is computerized the drawings, protocols, and ledgers. It is used a GIS(Geographic Information System) to get the geographical information of facilities. The data more efficiently could be search and update on this system. The decision making process understanding the present facility condition, and analyzing the condition of location could be performed easily by the GUI(Graphic User Interface) of the system.

  • PDF

Hexagonal Material Flow Pattern for Next Generation Semiconductor Fabrication (차세대 반도체 펩을 위한 육각형 물류 구조의 설계)

  • Chung, Jae-Woo;Suh, Jung-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.1
    • /
    • pp.42-51
    • /
    • 2010
  • The semiconductor industry is highly capital and technology intensive. Technology advancement on circuit design and process improvement requires chip makers continuously to invest a new fabrication facility that costs more than 3 billion US dollars. Especially major semiconductor companies recently started to discuss 450mm fabrication substituting existing 300mm fabrication of which facilities were initiated to build in 1998. If the plan is consolidated, the yield of 450mm facility would be more than doubled compared to existing 300mm facility. In steps of this important investment, facility layout has been acknowledged as one of the most important factors to be competitive in the market. This research proposes a new concept of semiconductor facility layout using hexagonal floor plan and its compatible material flow pattern. The main objective of this proposal is to improve the productivity of the unified layout that has been popularly used to build existing facilities. In this research, practical characteristics of the semiconductor fabrication are taken into account to develop a new layout alternative based on the analysis of Chung and Tanchoco (2009). The performance of the proposed layout alternative is analyzed using computer simulation and the results show that the new layout alternative outperforms the existing layout alternative, unified layout. However, a few questions on space efficiency to the new alternative were raised in communication with industry practitioners. These questions are left for a future study.

A Study on Facility Layout for Optimamization of Material Flow System (물류시스템 최적화를 위한 설비배치에 관한 연구)

  • Park, Se-Joon;Lee, Young-Hae;Hur, Sun;Lee, Moon-Hwan;Yu, Ji-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

Application of the Numerical Integration Method in a Repair Facility Using SIMAN and FORTRAN

  • Jung, Won;Rhee, Hahn-Kyou;Park, Min-Yong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.4
    • /
    • pp.463-477
    • /
    • 1995
  • This paper presents a decision model that will estimate the expected number of failed units in a repair facility in accordance with the varying demand, and determine the required number of personnel for repairing components. The demand is related to the failure process which follows a reliability growth phenomenon in service. The information in this paper is useful for selecting appropriate scheduling rules and spares stocking policies. SIMAN and FORTRAN were used for computing the time dependent performance measures in the repair facility. The numerical integration method that is presented in this paper will provide accurate performance measures with any dynamic pattern of demand, service rates, and any number of servers.

  • PDF

Optimal Room Assignment Problem for Multi-floor Facility using Binary Integer Programming (이진정수계획법을 사용한 복층숙소의 최적 방 배정문제)

  • Lee, Sang-Won;Rim, Suk-Chul
    • IE interfaces
    • /
    • v.21 no.2
    • /
    • pp.170-176
    • /
    • 2008
  • Consider a multi-floor facility with multiple rooms of unequal size on each floor. Students come from many organizations to attend the conference to be held at this facility. In assigning the rooms to the students, several constraints must be met; such as boys and girls must not be assigned to the rooms on the same floor. Given the capacity of each room and the number of students from each organization, the problem is assigning students to rooms under a set of constraints and various objectives. We present six models with different objective functions; and formulate them as binary integer programming problems. A numerical example and a case study follow to illustrate the proposed models.

Case Study of Design and Implementation for Hadoop-Based Integrated Facility Monitoring System (하둡 기반의 통합설비 모니터링시스템 설계 및 구현 사례 연구)

  • Kim, Sangrak;Jang, Gilsang;Cho, Chiwoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.1
    • /
    • pp.34-42
    • /
    • 2014
  • SCADA and DCS that have performed automatic control and monitoring activities increase the productivity of enterprise in industries. In such systems, although their performance had been improved, there are still many deficiencies in predictive maintenance which can foresee the risk of any kinds of accidents. Because the data acquisition systems of main facilities are being distributed throughout the whole plant and therefore, integration of data obtained from the systems is very difficult. Accordingly, techniques that acquire meaningful information from the gathered data through realtime analysis still need to be improved. This paper introduces a developed facility monitoring system which can predict equipment failure and diagnose facility status through big data analysis to improve equipment efficiency and prevent safety accidents.

Integration Facility Management: Interface Coordination in Process Management

  • Laksmana, Dimas Indra;Wijayaningtyas, Maranatha;Indriani, Sri;Kiswandono, Kiswandono
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.1
    • /
    • pp.319-323
    • /
    • 2022
  • The information research system continues to be developed and directed at leading research National Institute of Technology (ITN) Malang in accordance with the Research Strategic Plan of ITN Malang. One of them is a computer system in a complete integrated facility management activity, such as this research scheme. The purpose of this research is to combine and integrate people, places, product, processes and technology. All of them are integrate existing organizational factors into a more effective, simplifying of complex processes, identifying and scheduling, notes, decision makers and more. This research was conducted in stages by design with a structured model stage for 3 (three) years (focus on humans, products and processes), research on Integration Facility Management: Interface Coordination in human resources and product management have been completed on 2019 and 2020. While the focus of research this year is to obtain an integrated facility management Interface Coordination in Process Management.

An Integrated AHP-VIKOR Methodology for Facility Layout Design

  • Shokri, Hamidreza;Ashjari, Behzad;Saberi, Morteza;Yoon, Jin Hee
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.4
    • /
    • pp.389-405
    • /
    • 2013
  • A facility layout design (FLD) problem can be generally introduced as assignment of facilities (departments) to a site such that a set of criteria are satisfied or some objectives are minimized (maximized). Hence, it can be considered as a multi-criteria problem due to the presence of qualitative criteria such as maintenance or flexibility and quantitative criteria such as the total cost of handling material. The VIKOR method was developed to solve multiple criteria decision making problems with conflicting and non-commensurable (different units) criteria, assuming that compromising is acceptable for conflict resolution, the decision maker wants a solution that is the closest to the ideal, and the alternatives are evaluated according to all established criteria. This paper proposes a hierarchical analytic hierarchy process (AHP) and VIKOR approach to solve the FLD problem. A computer-aided layout-planning tool is adopted to generate the facility layout problems, as well as their quantitative data. The qualitative performance measures are weighted by AHP. VIKOR is then used to solve the FLD problem. Finally, the proposed integrated procedure is applied to three real-time examples.

Installation of Current Source Using LC Resonance Circuit for Arcing Experiments (아크계측 및 응용연구를 위한 LC공진회로 전류원 구축)

  • Kang, J.S.;Park, H.T.;Choe, W.J.;Lee, B.W.;Seo, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.2113-2115
    • /
    • 2000
  • It is necessary to install the arc generation facility in order to obtain the important technology for the design of breakers and switches, and for the improvement of their performance and reliability. With this facility, it is possible, to study the characteristics of Arc in air/gas/vacuum insulation environment. The facility briefly consists of capacitor bank which can charge enormous energy, an air-core reactor, experimental arc-chamber, and several measurement equipments. This facility can simulates the arc phenomena in breakers and switches by means of generating high currents. In order to study the arc phenomena in SF6 gas and vacuum and to test the quenching performance of the extinguishing chambers which are developing. we made experimental $SF_6$gas/vacuum chambers and measured several parameter's of chambers. And besides we visualized arc ignition and arc movement by means of high speed camera.

  • PDF