• 제목/요약/키워드: Industrial Processes

검색결과 2,857건 처리시간 0.03초

반도체 제조 공정에서 발생 가능한 부산물 (Exposure Possibility to By-products during the Processes of Semiconductor Manufacture)

  • 박승현;신정아;박해동
    • 한국산업보건학회지
    • /
    • 제22권1호
    • /
    • pp.52-59
    • /
    • 2012
  • Objectives: The purpose of this study was to evaluate the exposure possibility of by-products during the semiconductor manufacturing processes. Methods: The authors investigated types of chemicals generated during semiconductor manufacturing processes by the qualitative experiment on generation of by-products at the laboratory and a literature survey. Results: By-products due to decomposition of photoresist by UV-light during the photo-lithography process, ionization of arsine during the ion implant process, and inter-reactions of chemicals used at diffusion and deposition processes can be generated in wafer fabrication line. Volatile organic compounds (VOCs) such as benzene and formaldehyde can be generated during the mold process due to decomposition of epoxy molding compound and mold cleaner in semiconductor chip assembly line. Conclusions: Various types of by-products can be generated during the semiconductor manufacturing processes. Therefore, by-products carcinogen such as benzene, formaldehyde, and arsenic as well as chemical substances used during the semiconductor manufacturing processes should be controlled carefully.

Applying CPM-GOMS to Two-handed Korean Text Entry Task on Mobile Phone

  • Back, Ji-Seung;Myung, Ro-Hae
    • 대한인간공학회지
    • /
    • 제30권2호
    • /
    • pp.303-310
    • /
    • 2011
  • In this study, we employ CPM-GOMS analysis for explaining physical and cognitive processes and for quantitatively predicting when users are typing Korean text messages on mobile phones using both hands. First, we observe the behaviors of 10 subjects, when the subjects enter keypads with both hands. Then, basing upon MHP, we categorize the behaviors into perceptual, cognitive, motor operators, and then we analyze those operators. After that, we use the critical paths to model two task sentences. Also, we used Fitts' law method which was applied many times to predict text entering time on mobile phone to compare with the results of our CPM-GOMS model. We followed Lee's (2008) method that is well suited for text entry task using both hands and calculate total task time for each task sentences. For the sake of comparison between the actual data and the results predicted from our CPM-GOMS model, we empirically tested 10 subjects and concluded that there were no significant differences between the predicted values and the actual data. With the CPM-GOMS model, we can observe the human information processes composed on the physical and cognitive processes. Also we verified that the CPM-GOMS model can be well applied to predict the users' performance when they input text messages on mobile phones using both hands by comparing the predicted total task time with the real execution time.

마찰용접을 이용한 고강도 쇼크업소버 베이스 어셈블리의 제조 기술 개발 (Development of a High Strength Manufacturing Technology for the Shock Absorber Base Assembly Using Friction Welding)

  • 정호연
    • 산업경영시스템학회지
    • /
    • 제34권1호
    • /
    • pp.90-96
    • /
    • 2011
  • The shock absorber base assembly is one of the parts in the shock absorber equipment that controls the vehicle movement. It absorbs the shock and vibration to guarantee riding stability and comfort. It demands strength, reliability and strict airtightness of the welded section because the shock absorber base assembly is a container which resists pressure and needs durability by being filled with gas and oil. However, the current engineering needs a lot of production time, has a high cost and shows a low production rate. These problem due to the eight production processes, four of which are spot welding, reinforcement welding like metal active welding (MAG), prior process of the base assembly cap and tube for precision and pressing. We will analyze the manufacturing processes of the base assembly and suggest an improved manufacturing method that uses frictional welding. The results will show that the new method of the frictional welding is better than the previous welding technique. Through the use of this concept of frictional welding, the welding conjunction will be strengthened, measurements will be more precise, and the cost and the number of processes will be reduced.

물류센터 운영 개선을 위한 Lean Six Sigma 기법 적용 (The application of Lean Six Sigma Methodology for Improving Operation in Distribution Center)

  • 박상민;이범우
    • 대한안전경영과학회지
    • /
    • 제9권3호
    • /
    • pp.95-102
    • /
    • 2007
  • Nowadays, globally high-grade companies have done their best for increasing their competitive power through a many kinds of method in incisive competition for making certain of a pacesetting position. Among the rest, Six Sigma have been the best methodology of improving process and have proven to be effective by the result of improving process in many of manufacturing business, however, it has not obtained excellent results in the transaction business. In transaction business, a $30\sim50%$ costs in total costs is generated by slow-speed working and reworking. The slow processes decrease the quality and increase the cost, which decreases customer satisfaction, and finally the income is decreased. All of them are so called wastes in processes. For this, adopting of lean six sigma methodology in process management can eliminate the wastes and reduce the variation. This study focuses on distribution with the domains like capacity, layout, amount of location, assignment of product, operation procedure and operation rule in order to improve these domains, we make a further application of eight analysis ways based on DMAIC method for improving operation of processes of distribution center as the third profit source. The goal of this study is to trace an approach that can easily adopt of Lean Six Sigma in operational management of distribution center by a kind of data, analysis method and template.

Modelling of On-Site Energy Consumption Profile in Construction Sites and a Case Study of Earth Moving

  • Yi, Kyoo-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.10-16
    • /
    • 2013
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. According to the greenhouse reduction scheme of Korean Government, construction sector targeted 7.1% reduction by 2020. Although this target is not higher than other industrial sectors, it is not easy to achieve the reduction target without radical advance in technology, which cannot be expected to happen soon, considering the conservative characteristics of construction industry. Most researches on environmental issues focus on the issues related to energy saving matters during material production stage or maintenance stage, such as heating and insulation, and few deal with the issues directly related to the energy use in the construction sites. This research regards the operation of equipment for the on-site construction processes as a system and attempts to model the energy use processes related to the activities in construction sites, and provides simulation results of earth excavation and hauling processes. The result of this research is expected to aid construction planners estimating the time-based patterns of energy use and assessing greenhouse gas emission and to help selecting more energy efficient alternatives at the planning stage.

공정평균의 변화율이 정규분포인 제조공정의 최적 목표값 (Optimum target values for manufacturing processes when drifting rate in the process mean is normally distributed)

  • 이재훈;박태호;권혁무;홍성훈;이민구
    • 품질경영학회지
    • /
    • 제38권4호
    • /
    • pp.540-548
    • /
    • 2010
  • We consider the problem of selecting the most profitable initial process mean and length of production cycle for manufacturing processes subject to a constant linear trend during the same cycle that varies after resetting the processes. Assuming that the quality characteristic of interest is normally distributed, the optimum initial process mean and the length of production cycle are jointly obtained by minimizing the expected loss per unit time. We assume that the quality loss function due to the deviation from the target value is quadratic and resetting loss is constant. We consider both cases of symmetric and asymmetric quality loss function. An illustrative example is given and sensitivity analysis performed.

제 7차 교육과정 10학년 과학 교과에 포함된 환경단원의 탐구요소 분석 (An Analysis on Inquiry Elements of Environmental Units in the 10th Grade Science Textbooks, the 7th Curriculum)

  • 오강호;고영구
    • 한국환경교육학회지:환경교육
    • /
    • 제17권1호
    • /
    • pp.77-89
    • /
    • 2004
  • This study aims to consider interrelations and reasonability to inquiry elements of environment units in 10th Science textbooks of 7th curriculum on the basis of their inquiry contexts, processes and activities. Frequency of inquiry contexts is 59.9% of the highest value in natural environment context but is 4.0% of the lowest one in techno-industrial context. Measurements, inferences, predictions, experiments, data-interpretations, correlations, conclusionreveals in inquiries are in all the textbooks, but observations and classifications, hypothesis generations, controlling variables, experimental designs and generalizations are not in some textbooks. Discussions, experiments, investigations in inquiry activities are included in all the textbooks. However, inspections are not appeared in the all the books. Based on the above results, social and techno-industrial inquiry contexts in the varied scopes are necessary in the environment curricula with a unified direction. Inquiry processes with pro-environmental behaviors as a last goal might be given into the curricula, having tasks that could be understand unified inquiries. In addition, inspections with effectiveness might be thrown into the scene of education.

  • PDF

Lot Planning & Scheduling in the Integrated Steelmaking Process

  • Park Hyungwoo;Hong Yushin
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.109-113
    • /
    • 2002
  • Steel industry is the most capital intensive and the largest energy consuming industry, which operate huge and complex facilities to supply various steel products as the primary materials to almost every manufacturing industry Major steel products are hot-rolled and cold-rolled coils, plates, and wires that are produced through molten iron making, molten steel making, casting, and rolling. Each process runs in batch between setups and the specifications or bach are different with each other High energy consuming and heavy material handling require careful synchronization or processes, as well. Considering the synchronization or processes, the lot planning and scheduling problem in the integrated steelmaking process rovers the roll grouping with given casts. the sequencing or rolls over time, and the machine assignment and time scheduling or charges and casts. The problem is investigated by dividing it into two cases whether single or parallel machines at the molten steel making and the continuous casting processes. Problem descriptions and solution approaches or each instance are introduced. To test their performance and conformity, implementation or the algorithms and numerical experiments are carried out with real world and constructed data sets.

  • PDF

제조 공정에 따른 베어링메탈의 결함발생 및 피로파괴거동 (Defect Genesis and Fatigue Failure Behaviour of Bearing Metal in Manufacturing Processes)

  • 김민건
    • 산업기술연구
    • /
    • 제31권A호
    • /
    • pp.45-51
    • /
    • 2011
  • A study has been made on defects which are formed in manufacturing processes of engine bearing and also on fatigue crack growth behavior in each step of bearing metal manufacturing. After the first step (sinter brass powder on steel plate ; Series A) many voids are made on brass surface and its size is decreased at the second step (rolling process of sintered plate ; Series B). After the third step (re-sintering step of brass powder and rolling ; Series C) the number of voids is decreased and its type shows line. The time of fatigue crack initiation and the growth rate of fatigue crack are in order of Series A, Series B, Series C. These reasons are that void fosters the crack initiation and growth, and residual stress made by rolling process affects on the crack growth rate in Series B, C. In forming and machining processes by use of final bearing metal, crack was observed at internal corner of flange and peeling off was observed at interface between steel and brass. Owing to the above crack and peeling off, it is considered that there is a possibility of fatigue fracture during the application time.

  • PDF

프로젝트관리 성숙도별 리스크관리 적용 (On the Application of Risk Management by Levels of Project Management Maturity)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제34권2호
    • /
    • pp.19-29
    • /
    • 2011
  • The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.