• Title/Summary/Keyword: Independent load operation

Search Result 58, Processing Time 0.03 seconds

The Operation Characteristics of Domestic Stirling Engine Cogeneration System (가정용 스털링엔진 열병합발전시스템 운전특성에 관한 연구)

  • Choi, Jae-Joon;Park, Byung-Sik;Jung, Dae-Heon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.309-314
    • /
    • 2009
  • The unpredicted worldwide oil price makes the energy efficiency technology be more importance than any other period. The small cogeneration system is one of the most representative technology among the energy efficiency technologies, and the Stirling engine cogeneration system has been concerned and investigated due to the preferable characteristics - low toxic emission, low noise and vibration level, and the various form of fuel. A tiny, 1kW of electrical output, gas fueled Stirling engine cogeneration system was investigated. The electrical efficiency and thermal efficiency of the system were measured. The experiment was executed at an independent Stirling engine mode, independent secondary burner mode, and the combined mode. Part load characteristics of the Stirling engine cogeneration system were investigated also. With the efficiency characteristics, the $O_2$ and NOx emission characteristics were measured.

  • PDF

Audit Method Design and Performance Evaluation for Connection Information in ATM Switch (ATM 교환기에서 연결 정보에 대한 감사 기능 제공 방안 및 성능 평가)

  • 유영일;전병실
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.40 no.11
    • /
    • pp.27-33
    • /
    • 2003
  • This paper proposes the efficient audit method for the distributed connection information in ATM switch. Based on this method, we design the periodic audit function by a system and immediate audit function by a operator's order. We evaluate the performance about the proposed Audit method. At the result of evaluation, We figure out that the load of call control processor is almost independent of a system load regardless of audit function operation. Therefore, we confirm that the proposed audit method nearly have an effect on the load of call control processor. The proposed audit method can reestablish a Mismatched connection information with a little load.

DR Resource Operation System by Load Aggregator in Smart Grid (스마트 그리드 환경 하에서 LA사업자의 DR자원 운영 시스템 설계)

  • Kim, Ji-Hui;Moon, Guk-Hyun;Kim, Min-Kyung;Kong, Sung-Bae;Cho, Hyung-Chul;Joo, Sung-Kwan;Oh, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.652-653
    • /
    • 2011
  • 수요반응(DR : Demand Response)은 스마트 그리드(Smart Grid)를 구성하는 핵심 요소 중 하나이다. 본 논문에서는 스마트 그리드 환경 하에서 ISO(Independent System Operator)의 수요자원시장에 참여함과 동시에 말단 수용가들을 대상으로 다수의 DR 프로그램을 운영하는 LA(Load Aggregator)사업자의 DR자원 운영 시스템에 대한 전반적인 개념 및 흐름에 대하여 기술하였다. 또한, 스마트 그리드 하에서 LA사업자의 DR자원 운영 시스템 설계 중 LA사업자의 DR자원 최적배분 전략에 대한 개념 및 예시를 제시하였다.

  • PDF

Dyamic Modeling and Analysis of Air Supply System for Vehicular PEM Fuel Cell (고분자 전해질형 연료전지 자동차의 급기 시스템의 동적 모델링 및 분석)

  • Jang, HyunTak
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.15 no.3
    • /
    • pp.175-186
    • /
    • 2004
  • In this paper, we developed the dynamic model of a fuel cell system suitable for controller design and system operation. The transient phenomena captured in the model include the flow characteristics and inertia dynamics of the compressor, the intake manifold filling dynamics, oxygen partial pressures and membrane humidity on the fuel cell voltage. In the simulations, we paid attention to the transient behavior of stack voltage and compressor pressure, stoichiometric ratio. Simulation results are presented to demonstrate the model capability. For load current following, stack voltage dynamic characteristics are plotted to understand the Electro-chemistry involved with the fuel cell system. Compressor pressure and stoichiometric ratio are strongly coupled, and independent parameters may interfere with each other, dynamic response, undershoot and overshoot.

A Study on the Guidelines for Demand Factor of Electrical Facilities in Subway Stations (지하철 역사전기설비의 수용률 기준설정에 관한 연구)

  • Jang, Su-Yong;Kim, Hak-Lyun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.844-849
    • /
    • 2006
  • The electric facilities for subway stations require reliable and safe electricity in spite of their load increases rapidly. Nevertheless, Korea Electrical Safety Corporation reports that the accidents of independent electric facilities increased greatly from 4,632 cases in 1998 to 6,024 in 1999 and 6,776 cases in 2000, while the ratio of the accidents related with transformers grew gradually. As it is, it is deemed very important to minimize the spreading effects of the electric system accidents and thereby, enhance reliability of the electric supply as well as its safety. According to the fact that the electric facilities for subway stations are important for the public safety and conveniences, it should be careful to set their capacity instead of simply applying the general capacity standard to them, and thereby, improve their economy as well as prevent their accidents. With such a basic conception in mind, this study is aimed at analyzing the characteristics of the electric load in the subway stations and thereupon, suggesting some guidelines for setting of the electric facility capacity for subway stations in terms of optimal operation and safety.

  • PDF

Development of Process Model for Turbine Control Valve Test in a Power Plant (발전소 터빈제어 밸브시험 계통 모델 개발)

  • Woo, Joo-Hee;Choi, In-Kyu;Park, Doo-Yong;Kim, Jong-An
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.830-837
    • /
    • 2011
  • A turbine control system which has been operated for years in a nuclear power plant was retrofitted with a newly developed digital control system. After completion of the retrofit, turbine valve tests were performed to ensure the integrity of each valve's control function. The sequence of each valve test is composed of a closing process and a reopening process. To minimize megawatt variation which normally occurs during the test sequence, we employed a kind of compensator algorithm in the new digital control system which also have been used in the old system. There were difficulties finding optimal parameter settings for our new compensator algorithm because the power plant didn't allow us to perform necessary tuning procedures while the turbine is on load operation. Therefore an alternative measure for the compensator tuning which is independent of the turbine actual operation had to be implemented. So, a process model for the test was required to overcome this situation. We analyzed the operation data of the test and implemented the process model by use of input and output variable relations. Also we verified the process model by use of another condition's operating data. The result shows that the output of model is similar to the actual operation data.

Characteristic of Induction Motor Drives Fed by Three Leg and Five Leg Inverters

  • Talib, Md. Hairul Nizam;Ibrahim, Zulkifilie;Rahim, Nasrudin Abd.;Hasim, Ahmad Shukri Abu
    • Journal of Power Electronics
    • /
    • v.13 no.5
    • /
    • pp.806-813
    • /
    • 2013
  • This paper aims to compare the performance of three phase induction motor drives using Five Leg Inverter (FLI) and Three Leg Inverter (TLI) configurations. An Indirect Field Oriented Control (IFOC) method using a TLI is well established and incorporated for high performance speed drives in various industries. The FLI dual motor drive system on the other hand shows good workability in the independent control of two induction motor drives simultaneously. In this experiment, the IFOC method is utilized for both drive systems, and Space Vector Pulse Width Modulation (SVPWM) is used to generate pulses for both inverters. For the FLI, the Double Zero Sequence (DZS) Injection technique is used to generate the modulation signal. The complete experiment setup is done by using a DSpace 1103 controller board. The individual motor performances are analyzed using similar schemes, equipment setups and controller parameter values. The results show similar speed performance response capability between the single motor operation using a TLI system and the two motor operation using a FLI system based on the variable speed range either in forward or reverse operation. They also show similar load rejection abilities. However, the single motor with a TLI has a better power quality aspect such as ripple current and total harmonics distortion (THD).

A Multilayer Perceptron-Based Electric Load Forecasting Scheme via Effective Recovering Missing Data (효과적인 결측치 보완을 통한 다층 퍼셉트론 기반의 전력수요 예측 기법)

  • Moon, Jihoon;Park, Sungwoo;Hwang, Eenjun
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.8 no.2
    • /
    • pp.67-78
    • /
    • 2019
  • Accurate electric load forecasting is very important in the efficient operation of the smart grid. Recently, due to the development of IT technology, many works for constructing accurate forecasting models have been developed based on big data processing using artificial intelligence techniques. These forecasting models usually utilize external factors such as temperature, humidity and historical electric load as independent variables. However, due to diverse internal and external factors, historical electrical load contains many missing data, which makes it very difficult to construct an accurate forecasting model. To solve this problem, in this paper, we propose a random forest-based missing data recovery scheme and construct an electric load forecasting model based on multilayer perceptron using the estimated values of missing data and external factors. We demonstrate the performance of our proposed scheme via various experiments.

Hybrid Energy Storage System with Emergency Power Function of Standardization Technology (비상전원 기능을 갖는 하이브리드 에너지저장시스템 표준화 기술)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.2
    • /
    • pp.187-192
    • /
    • 2019
  • Hybrid power storage system with emergency power function for demand management and power outage minimizes the investment cost in the building of buildings and factories requiring emergency power generation facilities, We propose a new business model by developing technology that can secure economical efficiency by reducing power cost at all times. Normally, system power is supplied to load through STS (Static Transfer Switch), and PCS is connected to system in parallel to perform demand management. In order to efficiently operate the electric power through demand forecasting, the EMS issues a charge / discharge command to the ESS as a PMS (Power Management System), and the PMS transmits the command to the PCS controller to operate the system. During the power outage, the STS is rapidly disengaged from the system, and the PCS becomes an independent power supply and can supply constant voltage / constant frequency power to the load side. Therefore, it is possible to secure reliability through verification of actual system linkage and independent operation performance of hybrid ESS, By enabling low-carbon green growth technology to operate in conjunction with an efficient grid, it is possible to improve irregular power quality and contribute to peak load by generating renewable energy through ESS linkage. In addition, the ESS is replacing the frequency follow-up reserve, which is currently under the charge of coal-fired power generation, and thus it is anticipated that the operation cost of the LNG generator with high fuel cost can be reduced.

A Study on the Helicopter Pilot's Workload Influences by 'Surprise and Startle Effect' in the Abnormal Situation - Comparison by Pilot Certificate (Private and Commercial) - (비정상 상황에서 '놀람과 깜짝놀람의 영향(Surprise and Startle Effect)'이 헬리콥터 조종사의 작업부하(Workload)에 미치는 영향에 관한 연구 - 자격증명(자가용 및 사업용) 조종사의 비교 -)

  • Lee, Seokjong;Lee, Kangseok;Park, Wontae
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.30 no.2
    • /
    • pp.44-54
    • /
    • 2022
  • An empirical analysis was conducted on the workload of helicopter pilots flying in high-risk flight environments such as ground obstacles and weather effects at low altitudes. To evaluate the workload, an independent sample t-test was performed using the NASA-TLX evaluation method most suitable for the aviation field, and the workload score was calculated by applying the analytical stratification method (AHP) to compare and analyze private and commercial pilots. There is a significant difference in mean between private and commercial pilots and the result of work load was obtained over 70%. This paper studied the 'surprise and startle effect' on the helicopter field for the first time. In the future, it is intended to contribute to the safe operation of helicopters by presenting a method for effective safety management by utilizing it in the field of education and training for helicopter pilots and providing basic data for preventing accidents caused by human error.