Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • v.15 no.3
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

Literature Review of Studies on South Korean Nurses' Depressive Symptoms (국내 간호사의 우울 관련 문헌분석)

  • Park, Young Sook;Kim, Jeong-Hee
    • Korean Journal of Occupational Health Nursing
    • /
    • v.28 no.3
    • /
    • pp.125-137
    • /
    • 2019
  • Purpose: The purpose was to investigate the literature on depression among South Korean nurses in order to identify overall trends regarding depression. Methods: Forty-five papers published between 1998 and 2017 in three Korean databases-RISS4U, DBPIA, and KISS-were analyzed. Results: Depression showed significant positive associations with job stress, burnout, intent to leave, and somatic symptoms such as fatigue and trouble sleeping. Poor work environments such as staff shortage, work overload, and shift work were also positively associated with depression. Higher job satisfaction, resilience, self-efficacy, self-esteem, and social support were negatively correlated with and acted as significant buffers against depression. Conclusion: These results indicate that healthcare policymakers must pay more attention to the management and prevention of nurses' depression. In order to effectively do so, poor work conditions, which involve long working hours, high patient-to-nurse ratios, and extreme workloads, should be improved. Simultaneously, nursing managers should implement initiatives such as counseling and competency improvement programs, and stress management to reduce and prevent depression among nurses and strengthen their positive competency. Also, further research is required to clarify the prevalence of depression in South Korean nurses, with more meta-analyses also required to identify variations in depression rates owing to various factors.

Linear Programming Applications to Managerial Accounting Decision Makings (선형계획법을 이용한 관리회계적 의사결정)

  • Song, Han-Sik;Choi, Min-Cheol
    • Asia-Pacific Journal of Business
    • /
    • v.9 no.4
    • /
    • pp.99-117
    • /
    • 2018
  • This study has investigated Linear Programming (LP) applications to special decision making problems in managerial accounting with the help of spreadsheet Solver tools. It uses scenario approaches to case examples having three products and three resources in make-and-supply business operations, which is applicable to cases having more variables and constraints. Integer Programmings (IP) are applied in order to model situations when products are better valued in integer values or logical constraints are required. Three cases in one-time-only special order decisions include Goal Programming approach, Knapsack problems with 0/1 selections, and fixed-charge 0/1 integer modelling techniques for set-up operation costs. For the decisions in outsourcing problems, opportunity-costs of resources expressed by shadow-prices are considered to determine their precise contributions. It has also shown that the improvement in work-shop operation for an unprofitable product must overcome its 'reduced cost' by the sum of direct manufacturing cost savings and its shadow-price contributions. This paper has demonstrated how various real situations of special decision problem in managerial accounting can be approached without mistakes by using LP's and IP's, and how students both in accounting and management science can acquire LP skills in their education.

Exploration of Governance Improvement Measures through E-government of Korea (한국(韓國)의 전자정부(電子政府)와 거버넌스 향상 방안)

  • Kim, Sung-Won;Kim, Jong-Seong
    • Journal of Information Management
    • /
    • v.43 no.3
    • /
    • pp.117-137
    • /
    • 2012
  • This study examines the status of Korean E-government implementation and explores the ways to contribute to governance improvement by means of the e-government. As far as the level of implementation of e-government, Korea is confirmed to have achieved upper level by global standards, but it is found that continuous efforts of improvement is still required in the area of integrative management, which is considered as a final phase of e-government development. In order to evaluate how much e-government of Korea has contributed to the improvement of governance, I tried to measure the usability of e-government from the perspective of providers and that of consumers, and also, a qualitative evaluation on the provision and usage of functions related to the governance was also adopted. It is concluded that, while Korean e-government has reached a remarkable stage in the quantitative perspectives, there are still a room for improvement from the qualitative perspective, such as its role as a means of governance improvement. Also, based on the above evaluations and consequent findings, I suggest guidelines for the improvement of governance through the development of e-government.

Behavior Improvement of Unethical Information-Sharing by The Ethical Program : Social Capital and Ripple Effect (윤리 프로그램을 통한 비윤리적 정보공유 행동의 개선: 사회적 자본과 잔물결 효과)

  • Jung, Byoung-Ho;Kim, Byung-Cho
    • Journal of Digital Convergence
    • /
    • v.15 no.8
    • /
    • pp.169-182
    • /
    • 2017
  • The purpose of this study is to empirically examine a behavior improvement of unethical information sharing through the ethics program in organization. An unethical behavior of information sharing on organization members is to be get to private interests through divulgence of company's confidential information. An unethical information-sharing of individual is the opportunist and selfish behavior for an expansion of social capital and shows a negative ripple effect in organization. When conducting the research methods, the analysis order performs the cluster, discriminant, t-test and multiple regressions. According to the study, There are differences the behavior of unethical information sharing between opportunist and non-opportunist. The opportunist member for unethical behavior improvement required the program operation both value and compliance oriented program. Non-opportunist member required only the value-oriented program. The upcoming research needs to explore both ethics program's frequency and action of a punished person.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

A Study on the Analysis and Improvement of STANAG 4586 / MAVLink Protocol for Interoperability Improvement of UAS (UAS 상호운용성 향상을 위한 STANAG 4586과 MAVLink 프로토콜 비교분석 및 개선방안 연구)

  • Nam, Gyeongrae;Go, Jeonghwan;Kwon, Cheolhee;Jeong, Soyoung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.6
    • /
    • pp.618-638
    • /
    • 2020
  • An unmanned aerial vehicle(UAV) refers to an aircraft that has all or part of its functions to autonomously fly by grasping the surrounding environment by remote control on the ground without a pilot on board. With the development of unmanned aerial technology, civil/military forces are developing unmanned aerial vehicles for various purposes. In order to control unmanned aerial vehicles from the ground, communication protocols between unmanned aerial vehicles and ground control equipment are required, and civil/military forces have developed and used a photocall for different purposes. In this study, the characteristics of the MAVLink protocol used in the private sector and the STANAG 4586 protocol used in the military are compared/analyzed in detail to find elements to complement each other and to draw improvement measures for protocol unification.

A Study on Improvement of Ramp Installation Standard for BF Certification (BF 인증을 위한 경사로 설치기준 개선에 대한 연구)

  • Shin, Dong Hong
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.26 no.2
    • /
    • pp.31-38
    • /
    • 2020
  • Purpose: The ramp is an important facility for the barrier free access and vertical circulation of users of various buildings, including users of walker, wheelchair users, stroller users, and baggage carriers. The installation standards for ramps in Korea have various problems during construction and BF certification. It is necessary to improve the criteria for ensuring practical mobility and safety. Method: Korean standard, International Standard(ISO 21542, 2011), German Standard(DIN 18040-1, 2010), Austrian Standard(OENORM B 1600, 2017), Swiss Standard(Norm SIA 500, 2009), Canadian Standard(Building Standards Guide, 2017), American Standard(ADA Standards, 2010) were investigated and analyzed. A comprehensive improvement of the ramp installation standards is proposed. Results: The ramp is a necessary facility for the barrier free access and vertical circulation of the disabled. It shall be installed with comprehensive consideration of the appropriate slope of the ramp, the distance of the continuous slope, the handle and upstand for pedestrian safety. In order to improve convenience, setting the proper slope and limiting the length of the slope are very important, and improvements are required to the levels presented by international and foreign standards. The unclear standards of Korean law and BF certification standards should be clearly improved so as not to be misinterpreted in construction and Barrier Free Certification. Implication: International and foreign standards should be reviewed to ensure practical mobility and safety. And comprehensive improvement measures should be presented through continuous research.

Case study on improvements in non-value-added nursing activities to increase the efficiency of nursing care (Non-Value-added Activity 개선을 통한 간호업무 효율성 향상)

  • Park, Yang-Hee;Kwon, In-Gak;Park, Kyei-Sook;Jang, Hae-Jung;Song, Mi-Ra;Kim, Hee-Jin
    • Quality Improvement in Health Care
    • /
    • v.19 no.2
    • /
    • pp.68-80
    • /
    • 2013
  • Background: This study investigates improvements in non-value-added nursing activities in clinical work, in order to improve the efficiency and quality of nursing activities. Methods: The study was performed as a quality improvement project at a tertiary general hospital. The nursing activities that needed improvements were categories into admission care, discharge care, supply management, diagnostic work-up related activities, and others. The nursing time and frequency of non-value-added activities were compared across nine nursing units before and after implementation of the quality improvement program. Post-implementation patient and nurse satisfaction were subsequently analyzed. Result: Post-implementation, the time spent on non-value-added nursing activities was reduced and patients and nurses were satisfied with the improvements. Discussion: Reducing non-value-added activities in nursing can increase the work efficiency and ensure time for patient care, thus improving the quality of nursing care. For further study, accurate surveys on nursing activities based on nursing time are required.

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.