• 제목/요약/키워드: Imprecise scheduling

검색결과 14건 처리시간 0.019초

Scheduling Algorithm to Minimize Total Error for Imprecise On-Line Tasks

  • Song, Gi-Hyeon
    • 한국멀티미디어학회논문지
    • /
    • 제10권12호
    • /
    • pp.1741-1751
    • /
    • 2007
  • The imprecise computation technique ensures that all time-critical tasks produce their results before their deadlines by trading off the quality of the results for the computation time requirements of the tasks. In the imprecise computation, most scheduling problems of satisfying both 0/1 constraints and timing constraints, while the total error is minimized, are NP-complete when the optional tasks have arbitrary processing times. In the previous studies, the reasonable strategies of scheduling tasks with the 0/1 constraints on uniprocessors and multiprocessors for minimizing the total error are proposed. But, these algorithms are all off-line algorithms. Then, in the on-line scheduling, NORA(No Off-line tasks and on-line tasks Ready upon Arrival) algorithm can find a schedule with the minimum total error. In NORA algorithm, EDF(Earliest Deadline First) strategy is adopted in the scheduling of optional tasks. On the other hand, for the task system with 0/1 constraints, NORA algorithm may not suitable any more for minimizing total error of the imprecise tasks. Therefore, in this paper, an on-line algorithm is proposed to minimize total error for the imprecise real-time task system with 0/1 constraints. This algorithm is suitable for the imprecise on-line system with 0/1 constraints. Next, to evaluate performance of this algorithm, a series of experiments are done. As a consequence of the performance comparison, it has been concluded that IOSMTE(Imprecise On-line Scheduling to Minimize Total Error) algorithm proposed in this paper outperforms LOF(Longest Optional First) strategy and SOF(Shortest Optional First) strategy for the most cases.

  • PDF

실시간 시스템에서 여러 부정확한 스케쥴링 기법하에서의 부정확한 확률에 관한 비교 분석 (Comparative Analysis on Imprecision Probability Under Several Imprecise Scheduling Schemes in Real Time Systems)

  • 안귀임;고건
    • 한국통신학회논문지
    • /
    • 제19권7호
    • /
    • pp.1304-1320
    • /
    • 1994
  • 실시간 시스템에는 정확한 계산 기법과 부정확한 계산 기법이 있다. 부정확한 계산 기법은 실시간 시스템에서 스케쥴링의 유연성을 제공하는 수단이다. 지금까지 큐잉이론을 이용한 부정확한 스케쥴링에 관한 연구들은 태스크들의 평균 결과의 질과 평균 대기시간을 정충한 때의 비용과 장점들을 명확하게 수량화하는 것들이었다. 이논문은 두개의 부정확한 스케쥴링 방법을 사용할 때, 어떤 태스크가 부정확한 계산이 될 부정확한 확률들을 구하였으며 또한, 이런 두 방법의 부정확한 확률들의 여러 단조형 부정확한 시스템 매개변수들에 대한 의존성을 비교 분석하였다.

  • PDF

An On-line Algorithm to Search Minimum Total Error for Imprecise Real-time Tasks with 0/1 Constraint

  • Song Gi-Hyeon
    • 한국멀티미디어학회논문지
    • /
    • 제8권12호
    • /
    • pp.1589-1596
    • /
    • 2005
  • The imprecise real-time system provides flexibility in scheduling time-critical tasks. Most scheduling problems of satisfying both 0/1 constraint and timing constraints, while the total error is minimized, are NP complete when the optional tasks have arbitrary processing times. Liu suggested a reasonable strategy of scheduling tasks with the 0/1 constraint on uniprocessors for minimizing the total error. Song et al suggested a reasonable strategy of scheduling tasks with the 0/1 constraint on multiprocessors for minimizing the total error. But, these algorithms are all off-line algorithms. On the other hand, in the case of on line scheduling, Shih and Liu proposed the NORA algorithm which can find a schedule with the minimum total error for a task system consisting solely of on-line tasks that are ready upon arrival. But, for the task system with 0/1 constraint, it has not been known whether the NORA algorithm can be optimal or not in the sense that it guarantees all mandatory tasks are completed by their deadlines and the total error is minimized. So, this paper suggests an optimal algorithm to search minimum total error for the imprecise on-line real-time task system with 0/1 constraint. Furthermore, the proposed algorithm has the same complexity, O(N log N), as the NORA algorithm, where N is the number of tasks.

  • PDF

불확정 계산을 위한 EDF 기반의 실시간 스케줄링 알고리즘 (An EDF Based Real-Time Scheduling Algorithm for Imprecise Computation)

  • 최환필;김용석
    • 정보처리학회논문지A
    • /
    • 제18A권4호
    • /
    • pp.143-150
    • /
    • 2011
  • 본 논문은 필수 실행 부분과 선택 실행 부분으로 구성된 불확정 태스크(imprecise task) 모델에서 효과적으로 스케줄링 하는 EDF(Earliest Deadline First)기반의 알고리즘을 제안한다. 이러한 태스크 모델은 태스크가 과부하 상태가 되었을 때 처리하는데 유용하게 사용된다. 과부하 상황이 발생하면 선택 실행 부분 중 일부를 포기해야 하는데, 제안한 DOP 알고리즘은 이후에 발생할 태스크에 대해서 보다 유연하게 대처 할 수 있게 하기 위해서 마감시간이 빠른 태스크의 선택 실행 부분을 제거하고, 마감시간이 늦은 태스크의 선택 실행 부분을 남기는 방법을 사용한다. 시뮬레이션을 통하여 성능을 평가한 결과 DOP는 기존에 연구된 스케줄링 알고리즘들에 비해서 좋은 성능을 보였다.

중간 결과값 연산 모델을 위한 2차원 DCT 구조 (Two-dimensional DCT arcitecture for imprecise computation model)

  • 임강빈;정진군;신준호;최경희;정기현
    • 전자공학회논문지C
    • /
    • 제34C권9호
    • /
    • pp.22-32
    • /
    • 1997
  • This paper proposes an imprecise compuitation model for DCT considering QOS of images and a two dimensional DCT architecture for imprecise computations. In case that many processes are scheduling in a hard real time system, the system resources are shared among them. Thus all processes can not be allocated enough system resources (such as processing power and communication bandwidth). The imprecise computtion model can be used to provide scheduling flexibility and various QOS(quality of service)levels, to enhance fault tolerance, and to ensure service continuity in rela time systems. The DCT(discrete cosine transform) is known as one of popular image data compression techniques and adopted in JPEG and MPEG algorithms since the DCT can remove the spatial redundancy of 2-D image data efficiently. Even though many commercial data compression VLSI chips include the DCST hardware, the DCT computation is still a very time-consuming process and a lot of hardware resources are required for the DCT implementation. In this paper the DCT procedure is re-analyzed to fit to imprecise computation model. The test image is simulated on teh base of this model, and the computation time and the quality of restored image are studied. The row-column algorithm is used ot fit the proposed imprecise computation DCT which supports pipeline operatiions by pixel unit, various QOS levels and low speed stroage devices. The architecture has reduced I/O bandwidth which could make its implementation feasible in VLSI. The architecture is proved using a VHDL simulator in architecture level.

  • PDF

부정확한 융복합 온라인 태스크들의 스케쥴가능성을 향상시키기 위한 지연 전략 (A deferring strategy to improve schedulability for the imprecise convergence on-line tasks)

  • 송기현
    • 한국융합학회논문지
    • /
    • 제12권2호
    • /
    • pp.15-20
    • /
    • 2021
  • 부정확한 실시간 스케쥴링은 실시간 시스템에 일시적인 과부하가 발생할 때, 보다 덜 중요한 태스크들을 희생시킴으로서 시간적 오류들의 결과로 발생될 수 있는 나쁜 효과들을 최소화시키기 위하여 사용될 수 있다. 부정확한 실시간 스케쥴링에 있어서, 모든 경성 실시간 태스크는 논리적으로 필수적 태스크와 선택적 태스크로 나누어 질 수 있다. 최근들어서, 선택적 태스크들을 지연시킴으로서 총오류를 최소화시키면서도 필수적 태스크들의 스케쥴가능성을 향상시키는 연구들이 진행되어 왔다. 그러나, 이러한 연구들에서의 스케쥴가능성은 각 각의 선택적 태스크의 실행요구시간이 대응하는 필수적 태스크의 실행요구시간보다 작거나 같을 때 에만 적용된다는 제약이 있었다. 그래서, 본 논문에서는 이전의 연구들의 필수적 및 선택적 태스크들에 대한 실행요구시간 제약조건과 정 반대되는 제약조건 하에서도 적용될 수 있는 새로운 지연 전략을 제시하였다. 그럼에도 불구하고, 본 논문에서 제시한 지연 전략은 총오류를 최소화시키면서도 이전 연구들에 비하여 유사하거나 더 우수한 스케쥴가능성 성능을 보여 주었다.

0/1 제약조건을 갖는 부정확한 실시간 태스크들의 총오류를 최소화시키는 효율적인 알고리즘 (An Efficient Algorithm to Minimize Total Error of the Imprecise Real Time Tasks with 0/1 Constraint)

  • 송기현
    • 한국컴퓨터산업학회논문지
    • /
    • 제7권4호
    • /
    • pp.309-320
    • /
    • 2006
  • 부정확한 실시간 시스템은 시간적으로 긴급한 태스크들을 융통성있게 스케쥴링해 줄 수 있다. 총 오류를 최소화시키면서 0/1 제약조건과 시간적 제약조건들을 모두 만족시키는 대부분의 스케쥴링문제들은 선택적태스크들이 임의의 수행시간을 갖고 있을 때 NP-complete이다. Liu는 단일처리기상에서 0/1제약조건을 갖는 태스크들을 총 오류가 최소화되도록 스케쥴링시킬 수 있는 합리적인 전략을 제시하였다 또한, 송 등은 다중처리기상에서 0/1제약조건을 갖는 태스크들을 총 오류가 최소화되도록 스케줄링 시킬 수 있는 합리적인 전략을 제시하였다. 그러나, 이러한 알고리즘들은 모두 오프라인 알고리즘들이다. <중략> 두 알고리즘들 사이의 성능비교의 결과로서, 선택적 태스크들이 그들의 실행요구시간의 임의의 순서대로 스케쥴될 때는 제안된 알고리즘이 NORA 알고리즘과 비슷한 총오류를 산출하지만 특별히 선택적 태스크들이 그들의 실행요구시간의 오름차순으로 스케쥴될 때는 제안된 알고리즘이 NORA 알고리즘보다 더 적은 총오류를 산출할 수 있음이 밝혀졌다. 본 논문에서 제시된 알고리즘은 레이다의 추적, 이미지 처리, 미사일 제어 등의 응용에서 효과적으로 적용될 수 있다.

  • PDF

A Heuristic Scheduling Algorithm for Reducing the Total Error of an Imprecise Multiprocessor System with 0/1 Constraint

  • Song, Ki-Hyun;Park, Kyung-Hee;Park, Seung-Kyu;Park, Dug-Kyoo;Yun, Kyong-Ok
    • Journal of Electrical Engineering and information Science
    • /
    • 제2권6호
    • /
    • pp.1-6
    • /
    • 1997
  • The scheduling problem of satisfying both 0/1 constraint and the timing constraint while minimizing the total error is NP-complete when the optional parts have arbitrary processing times. In this paper, we present a heuristic scheduling algorithm for 0/1 constraint imprecise systems which consist of communicating tasks running on multiple processors. The algorithm is based on the program graph which is similar to the one presented in[4]. To check the schedulability, we apply Lawler and Moore's theorem. To analyze the performance of the proposed algorithm, intensive simulation is done. The results of the simulation shows that the longest processing first selection strategy outperforms random or minimal laxity policies.

  • PDF

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF

멀티미디어 시스템에서 QoS 지원을 위한 불확정계산 기반의 스케줄링 (Imprecise Computation based Scheduling for QoS Support in Multimedia Systems)

  • 김태수;김용석
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2005년도 추계종합학술대회
    • /
    • pp.995-998
    • /
    • 2005
  • A task in imprecise computation consists of mandatory part and optional part. The optional part can be executed partially and the quality of service is measured by the amount of the execution. Many paper showed that multimedia systems are good applications of imprecise computation. It is important to guarantee QoS which is a critical factor in multimedia systems. Previous works didn't consider QoS and processor slack were assigned randomly to tasks. This paper presented a systemic slack assignment method according to QoS levels of tasks. A simulation result showed that our method can be a good choice for multimedia systems with QoS requirement.

  • PDF