Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2002.05a
/
pp.719-723
/
2002
The purpose of this study is to suggest the correlation of single-number ratings for sound insulation by floor impact. As a assessment method of impact sound insulation. we selected the IIC contour of ISO, A weighted sound level. Inverse A-weighting curve and L-Index of japanese industrial standard. And we estimated the single-number ratings by application the measured data of impact sound level to each method. The results showed that the coefficients of determination between each two single-number ratings were very high (more than 0.9169). And In the condition of same assessment method, the coefficient of determination for light-weight impact sound was higher than that for heavy-weight impact sound.
Korean Journal of Construction Engineering and Management
/
v.13
no.5
/
pp.84-93
/
2012
Most of the studies on reduction of buildings' environmental burden in the construction industry have been focused on carbon dioxide emission, although there are various kinds of environmental issues such as global warming, acidification, and etc. which are considered by many researchers. Therefore, this study defined and suggested six impact categories and the principles to assess each impact for the assessment of comprehensive environmental impacts of buildings. The six impact categories are abiotic depletion, global warming, ozone layer depletion, acidification, eutrophication, and photochemical oxidation. A case study has been conducted through comparative analysis of two structural design alternatives to confirm the necessity of assessing the six impact categories. That is, the results of global warming potential and the six impacts proposed in this study were compared. By comparing the results of only global warming potential, the second design alternative using 24MPa concrete was chosen as a better alternative, while the first design alternative using 21MPa concrete was resulted as a better alternative when six impact categories were considered. The results mean that the assessment of various environmental impacts is an appropriate and reasonable approach and the comprehensive assessment offers more reliable results of environmental impacts in the building construction.
The addition and evaluation of health impact items in Environmental Impact Assessment document are written in hygiene and public health items only for specific development projects and are being reviewed. However, after the publication of the evaluation manual on the addition and evaluation of health impact items in 2011, there is a demand for continuous methodology and improvement plans despite partial improvement. Therefore, in order to propose a methodological improvement of the evaluation manual, this technical paper identified detailed improvement requirements based on the consultation opinions on hygiene and public health items, and investigated and suggested ways to solve this problem by reviewing the contents of the research so far. As for the improvement requirements, the contents related to mitigation plan, post management, effect prediction, assessment, and present-condition investigation were presented in Environmental Impact Assessment documents for the entire development project at a frequency of 93%, 85%, 80%, 74%, and 67%, respectively. Particularly, the detailed improvement requirements related to mitigation plan consisted of an establishment direction and a management of development project. Considering the current evaluation manual and the frequency of improvement requirements, this paper proposed concrete methods or improvement plans for major methodologies for each classification of hygiene and public health items. Furthermore, a comprehensive evaluation methodology related to whether a project is implemented was proposed, which is not provided in the current assessment manual.
Journal of the Korean Society of Marine Environment & Safety
/
v.28
no.6
/
pp.890-898
/
2022
Dispersion of suspended sediment, caused by coastal and marine development, is a key item in assessing marine environmental impact as it adversely affects marine life by increasing the level of turbidity and decreasing the amount of sunlight in seawater. However, its estimation has not been reliable because of the absence of a standard for the data measurement and divergent approaches to the impact assessment. In this study, we examined the estimation models from 58 Marine Environmental Impact Statements (MEISs, 2012-2014) to identify the gaps in the assessment and devise ways of improving the estimation. We developed four index items-grid system; unit load, particle size, and settling velocit-to evaluate their reliability in the estimation. The mean reliability score of each index was overall low-25 for grid system, 60 for unit load, 34 for particle size, and 17 for settling velocity. To ensure high reliability, it is important to develop a standard guideline that defines precise measurement of suspended sediment for unit load and settling velocity by particle size, followed by a grid system with compatible size for modelling. This can improve the estimation and thus underlie coherent impact assessment of suspended sediment dispersion on marine environment.
The European Community (EC) began dealing with the subject of environmental impact assessment (EIA) in the mid-1970s. After ten years of preparatory work and more than 20 draft versions, the EC Council of Ministers adopted, in 1985, the Directive on the assessment of the effects of certain public and private projects on the environment (85/337/EEC). This directive requires the member states to make EIA mandatory for certain projects. Its Article 3 defines the purpose of the instrument: "The environmental impact assessment will identify, describe and assess the direct and indirect effects of a project. There are no rules on scoping or on post-project analysis. However, member states are free to adopt, in their domestic legislation, more stringent rules regarding the scope and procedure of EIA. Consequently, they have developed national EIA systems which differ considerably from each other. Also, EIA practice in each of these countries is different from that in the others. In 1992, the EC Council adopted the 'Flora, Fauna, Habitat' Directive which lays down an additional EIA requirement. Member states will have to develop a network of 'European' nature conservation areas. Each project or plan possibly endangering these areas will have to be assessed whether it is in line with the protection purposes laid down for them. Although the directive does not say so explicitly, this means that a kind of EIA will have to be carried out for those projects and plans. For several years, the Commission has been developing proposals for a directive on EIA of plans and programmes ("strategic EIA"). This would supplement directive 85/337/EED, and would require and EIA for plans and programmes influencing decisions on specific projects(e.g. agricultural plans or energy programmes). At present, procedural and methodological questions of strategic EIA are being discussed extensively both within and without the European Union.
The Protocol on Environmental Protection to the Antarctic Treaty was ratified in 1991. With the aim to ensure comprehensive protection of the Antarctic environment, it contains provisions on environmental protection and conservation of the Antarctic area, including provisions for Environmental Impact Assessment. Environmental Impact Assessment is a method used to predict environmental impacts at an early stage in project planning and design, and find ways to mitigate or prevent adverse impacts in order to maintain balance between development activities and environmental conservation. Internationally, the Environmental Impact Assessment (EIA) in the Antarctic is classified into three types - preliminary, Initial, and Comprehensive - based on the environmental impacts of the proposed activities. In case of the Preliminary Environmental Review (PER), proposed activity may proceed in accordance to the national procedures and drafting of an outline. However, Initial (IEE) and Comprehensive Environmental Evaluation (CEE) assess and verify the impacts of the proposed activity, and require methods or alternatives for mitigating or eliminating negative impacts on the environment. Although Korea's Act of 'Activities and Environmental Protection in Antarctica' also includes provisions on EIA for activities in Antarctica, there are obvious contrasts with the EIAs currently being conducted in Korea, in regards to deciding the level of EIA through screening and identifying key issues for assessment through scoping. In order to implement the proper EIA, more improved methods for drafting and reviewing the EIA to Antarctica in Korea are necessary.
Kim, Tae Heum;Park, Sun Hwan;Hwang, Sang Il;Yang, Jihoon;Lee, Jai-Young;Hwang, Joung Bae
Journal of Environmental Impact Assessment
/
v.25
no.1
/
pp.51-62
/
2016
Recently, soil has been recognized as a crucially important resource that even can change the quality of life. Also, recent studies have gradually mentioned the importance of assessing soil impact induced by development plans and projects. In this study, after detailed soil assessement items were selected from our national environmental policies and international agreements, they were tested for the long-term dam construction planning in order to ensure more suitable implementation of strategic environment assessment(SEA). We found that soil resources can be impacted by diverse factors such as soil erosion, soil organic matters, soil moving, soil biodiversity, and others. Such detailed factors are found to be overlapped with the pervious EIA factors. Accordingly, additional studies would be required for finding out more reasonable connection between assessment factors during any SEA progress.
Environmental monitoring system has been adopted and supplemented as inspection measures for the quantitative and qualitative changes of environmental impact assessment (EIA). This study compares the results of environmental impact assessment with the results of post-environmental investigation using a correction and principal component analysis (PCA) in the housing development project. Correlation analysis showed that most of air quality variables including TSP, $PM_{10},\;NO_2$, CO were linearly correlated with each other in the environmental impact assessment and the post-environmental investigation. In the water quality, pH and BOD were well correlated with the DO and SS, respectively. As a result of correlation analysis in the noise and vibration, noise in day and night and vibration in day and night were related to each other between EIA and the post-environmental investigation. From the results of analysis of soil, Cu with Cd, Cu with Pb, and Cd with Pb were related to each other in EIA. Principal component analysis (PCA) showed a powerful pattern recognition that had attempted to explain the variance of a large dataset of inter-correlated variable with a smaller set of independent variables (principal components). Principal component (PC1) and principal component (PC2) were obtained with eigenvalues> 1 summing almost $90\%$ of the total variance in the all of the items(air, water, noise, vibration and soil) in EIA and post-environmental investigation.
Kim, Myeong-Won;Jo, Gwang-Woo;Maeng, Jun-Ho;Kang, Tae-Soon;Kim, Jongkyu
Journal of Ocean Engineering and Technology
/
v.28
no.3
/
pp.245-253
/
2014
This research analyzed the current situation and problems with an environmental impact assessment to provide a rational ocean physics assessment technique for power plant thermal effluent. This research also tried to create an improvement plan for heated effluent diffusion impact assessment by examining the reporting regulations for environmental impact assessment, national and international evaluation guidelines, etc. In the case of evaluating the oceanographic impact of heated effluent discharged from power plants, a pre-investigation is necessary before a full-scale presentence investigation, to accurately predict and minimize power plant construction effects on the surrounding environments. Before this presentence investigation, moreover, an integrated presentence plan, which agrees with the business plan, effect prediction, and post-investigation, needs to be established. A sufficient summit investigation must be made, which considers climate changes, and new and additional power plant construction. For accurate long-term oceanic environmental change prediction, the credibility of effect prediction must be elevated by presenting an evaluation method that is categorized by numerical organization models, verification methods, result presentation, and other things. Furthermore, unproductive conflicts between the people involved in heated effluent evaluation should be reduced by these improvement plans.
It is well known there are a lot of undeveloped energy resource in the Arctic circle. As global warming enables the use of Arctic sea routes, the interest in Arctic resource development is increasing. Recently, polar neighbors and developed countries are actively promoting construction project in Arctic circle. However, the issue of environmental pollution caused by Arctic resource development has been raised. Today, environmental issues have a significant impact on the success of the project as well as on the costs of Arctic development projects. Therefore, it is necessary to secure a technology related to energy resource development and transportation for the Arctic resource project. In addition, the establishment of strategy for environmental impact assessment (EIA) is important. This paper shows the characteristics and procedures of EIA for developing Arctic resources, and reviews how to construct the systematically management of the necessary information. This system consists of a database required for environmental impact assessment and its application. The system is expected to be utilized for strategic development projects in the Arctic.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.