• Title/Summary/Keyword: IT service project

Search Result 818, Processing Time 0.032 seconds

Analysis of the Average Abatement Cost of Forest Carbon Offset Projects for the Government Purchase of Forest Carbon Credits (산림탄소흡수량 정부구매를 위한 산림탄소상쇄 사업의 평균저감비용 분석)

  • Kim, Young-hwan
    • Journal of Climate Change Research
    • /
    • v.7 no.4
    • /
    • pp.391-396
    • /
    • 2016
  • This study was intended to analyze the average abatement cost (AAC) of forest carbon offset projects to suggest a basic credit price for government purchase of forest carbon credits. For this purpose, an a/reforestation project and a forest management project were designed with 30 years of project period. It is assumed to plant pine trees (Pinus densiflora) for the a/reforestation project, while it is assumed to replace rigida pine trees(Pinus rigida) with oak trees (Quercus acutissima) for the forest management project. For each project, the forest carbon stock was calculated and the revenue and the cost were analyzed with standardized management activities. Korea Forest Service has supported private forest owners the cost of management activities and the consulting fee for designing carbon offset project. Therefore, the AAC were analyzed for two cases : the one with subsidy for consulting fee (case 1) and the other with subsidy for both consulting fee and management costs (case 2). In addition, the sensitiveness of AAC was analyzed according to the 4 credit prices : ₩5,000, ₩10,000, ₩15,000 and ₩20,000. The result showed that the AAC analyzed for the case 1 was so high that net revenue would not be expected from all project types with any credit price. However the AAC analyzed for the case 2 was relatively lower than the AAC of case 1. Net revenue was expected from a/reforestation project with credit price over ₩10,000, while from forest management project with credit price over ₩15,000. Based on the AAC analyzed in this study, ₩15,000 was suggested as the basic price for government purchase of forest carbon credit.

The U.S. Government's Book Translation Program in Korea in the 1950s (1950년대 한국에서의 미국 도서번역 사업의 전개와 의미)

  • Cha, Jae Young
    • Korean journal of communication and information
    • /
    • v.78
    • /
    • pp.206-242
    • /
    • 2016
  • This study dealt with the U.S. government's book translation project as a part of its public diplomacy to gain the Korean people's 'minds and thoughts' in the midst of cultural Cold War from the end of World War II to the late 1950s. It was found that the U.S. book translation project was begun during the U.S. military occupation of South Korea, though with minimum efforts, and reached its peak in the late 1950s, In general, the purposes of the U.S. book translation project in South Korea was as follows: to emphasize the supremacy of American political and economic systems; to criticize the irrationality of communism and conflicts in the communist societies; to increase the Korean people's understanding of the U.S. foreign policies; to publicize the achievement of the U.S. people in the areas of arts, literature, and sciences. In the selection of books for translation, any ones were excluded which might contradict to U.S. foreign policy or impair U.S. images abroad. It must be noted that publications of a few Korean writers' books were supported by the project, if they were thought to be in service for its purposes. Even some Japanese books, which were produced by the U.S. book translation project in Japan, were utilized for the best effects of the project in South Korea. It may be conceded that the U.S. book translation project contributed a little bit to the compensation for the dearth of knowledge and information in South Korea at that time. However, the project may have distorted the Korean people's perspectives toward the U.S. and world, owing to the book selection in accordance with the U.S. government's policy guidance.

  • PDF

The Effects of Project Learning on 'Strata and Rock' of Pre-service Teachers on Self Directed Learning Ability and Environmental Sensitivity (초등예비교사의 '지층과 암석'에 대한 프로젝트 학습이 자기주도적 학습능력 및 환경감수성에 미치는 효과)

  • Lee, Yongseob
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.9 no.2
    • /
    • pp.233-242
    • /
    • 2016
  • The purpose of this study was learning about the project 'stratum and the rock ' of pre-primary teachers to the effects of self-directed learning ability and environmental sensitivity. This study was set up experimental treatment period of 15 weeks from March 2016 to June, students who are B Education University of fourth grade the first semester participated, in the study, It was composed of 34 students of 1 class taking 'strata and rock' lecture. Experimental study group consisted of exploration activities on the field experience about strata and rock. Set the area they want to explore the site by teams. The results of this study are as follows. First. learning about the project 'stratum and the rock ' of pre-primary teachers was effective to self-directed learning skills. 2nd, Learning about the project 'stratum and the rock ' of pre-primary teachers was effective to environmental sensitivity. 3rd, The students showed a positive response and were interested in the project 'stratum and the rock ' of pre-primary teachers.

A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

A Study on Demand Function of Customized Cloud BIM Service - Focused on Medical Facility Design - (맞춤형 클라우드 BIM 서비스 요구기능 도출에 관한 연구 - 의료시설 설계를 중심으로 -)

  • Jung, Sung-Ho;Lee, Byung-Soo;Choi, Yoon-Ki
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.7
    • /
    • pp.53-61
    • /
    • 2019
  • Cloud BIM, which incorporates cloud computing technology and BIM technology, is increasingly used in construction. In particular, the recent trend of cloud services in IT field is to provide customized cloud services according to the characteristics of users. These changes are also linked to the cloud BIM, which is emerging in the construction industry. However, cloud BIM researches and commercial technologies that are currently underway do not reflect these trends, and they provide services through generalized management functions in construction projects. In order to solve these problems, a new type of customized cloud BIM service is needed that can provide cloud services by reflecting the characteristics of the project, customization based on the user's work, and providing the knowledge service. Therefore, this study aims to derive the system requirement function that should be preceded for implementing the customized cloud BIM service, and the target project is selected as the medical facility.

A Study on Application of Real Option for Strategic Response to Uncertainty in Hotel Development Project (호텔개발사업의 불확실성에 전략적으로 대응하기 위한 실물옵션 적용 연구)

  • Kwon, Tae-In;Lee, Sang-Hyo;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.5-12
    • /
    • 2010
  • Unlike housing development project that can ensure profit by selling built units, a hotel development depends on long-term business operation to be profitable due to characteristics of service industry. The expected cash flow has substantial uncertainty depending on room occupancy rate and room charge. Thus, even after construction is complete, business risk tends to rise. It is necessary to ensure strategic response to uncertainty in future value of a hotel. The objective of the study is to explore strategic measures to deal with risk and uncertain future value in hotel development project by adopting abandonment option, which is a type of real options. The case in analysis had sevenyears of project period: Two years for construction, and five years for operation; a plan was made to sell the hotel after five years' of operation. For the research purpose, option value ofrecoverable investment amount was estimated, and value of abandonment option was KRW 124.921 billion. When abandonment option is applied, the project value was deemed to be KRW 120.592 billion. Generally, the amount of loss is enormous when a real estate project like a hotel development fails, and therefore, application of option is expected to be an effective measure to leverage uncertainty of a project.

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

A Study on Sigma Level and Its Calculation (시그마 수준과 계산 방법에 대한 고찰)

  • 박준오;박성현
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.2
    • /
    • pp.194-204
    • /
    • 2003
  • It is very important to understand and interpret the meaning of the sigma level correctly through the Six Sigma project. Especially, the confusion over the relation between sigma level from the short-term point of view and defective proportion or DPMO from the long-term point of view may make a big gap between expected results of the Six Sigma project and real results in the field. The one-tail approximation is commonly used to calculate the sigma level both in most literatures introducing Six Sigma and actual cases of the Six Sigma project. Since the one-tail approximation undervalues the sigma level of the fields such as business and service of which the sigma level is generally low, however. there can be misleading results of the explanation of the sigma level and inappropriate project evaluation. This paper describes the relation between sigma level and defective proportion in detail and clears the difference between the one-tail and two-tail approximation.

Influences of Energy Production Estimation Errors on Project Feasibility Indicators of a Wind Project and Critical Factor Analysis by AHP (풍력발전사업 에너지생산량 산정 오차가 사업성지표에 미치는 영향 및 AHP를 이용한 중요인자 분석)

  • Kim, Youngkyung;Chang, Byungman
    • Korean Management Science Review
    • /
    • v.30 no.2
    • /
    • pp.1-10
    • /
    • 2013
  • Case studies are made to investigate the relationship between the accuracy of energy production estimation and project feasibility indicators such as rate of return on equity (ROE) and debt service coverage ratio (DSCR) for three wind farm projects. It is found out that 1% improvement in the accuracy of energy production estimation may enhance the ROE by more than 0.5% in the case of P95, thanks to improved financing terms. AHP survey shows that MCP correlation of measured in situ wind data with long term wind speed distribution and hands-on experiences of flow analysis are more important than other factors for more precise annual energy production estimation.

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF