• Title/Summary/Keyword: IT project performance

Search Result 1,413, Processing Time 0.025 seconds

Quantitative Management for IT Program in Pubic Sector

  • Ra, Jong-Hei;Choi, Kwang-Don
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.257-267
    • /
    • 2004
  • This study presents methodology framework that can help to manage IT program in the public sector. Existing project management methods usually focus on system providers and could have various and abstract interpretations. So, it is difficult to apply existing project management methods in the public sector. It also makes each individual project management easier by reflecting characteristics of IT project so that it can provide management models of performance measurement. It is found that given framework in management methodology get positive analysis and addition to be applied in the individual project management and various IT programs nationwide. It is expected that scientific and systematic project management can bring successful promotion and management of IT project through the application of this project management methodology.

  • PDF

Diagnosis of the Policy Tasks for the Execution of an Urban Regeneration Project Plan in Gangwon-do (강원도 도시재생사업계획 수립을 위한 정책 과제 진단)

  • Ham, Kwang-Min
    • Journal of Environmental Science International
    • /
    • v.30 no.5
    • /
    • pp.391-397
    • /
    • 2021
  • This study aims to establish the measures required for strengthening the internal stability of and executing the systematic plan for Gangwon-do in relation to the "urban regeneration preliminary project" launched by the Ministry of Land, Infrastructure, and Transport. The results of this study are as follows. The unit project carried out via the Gangwon-do urban regeneration preliminary project presented the tendency for the standardization of the H/W and S/W projects such as the establishment of the community anchor space and the resident competency reinforcement project. Further, rather than focusing on the contents that could objectively measure the effects of the project, it concentrated more on the performance indicators that are required for verifying the execution of unit projects like the establishment of buildings and operating programs. It was found to be insufficient with regard to the practicality of the project, the correlation with the New Deal Project, and the validity of the project contents. To improve these aspects, Gangwon-do would be required to highlight its distinguishability from the other regions and increase its practicality by operating the field-centered urban regeneration educational program, inducing the participation of experts in each of the areas in case there is a need to execute a project plan and discover a project with placeness. It also needs to focus on strengthening its connection with the urban regeneration new deal project by discovering the resident leaders and professional manpower, and establishing the performance indicators needed for systematically monitoring the regional changes in accordance to the urban regeneration preliminary project.

Project Experience and its Impact on Project Performance (프로젝트 경험이 프로젝트 성과에 미치는 영향)

  • Yu, Gun Jea
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.8
    • /
    • pp.365-373
    • /
    • 2014
  • The assignment of exploration on individuals provides challenging work environments, while it generates high levels of complexity. On the other hand, the assignment of exploitation on individuals offers less challenging work environments, while it makes low levels of complexity. Give the characteristics of exploration and exploitation, I argue that the assignments of both exploration and exploitation create the favorable work environments to individuals. Developed hypotheses were tested using a logit regression from a sample of 168 project managers in a R&D center. I found that a manager who experienced exploitation project(s) is positively related to higher performance in exploitation project(s). In addition, a manager who experienced both exploitation and exploration projects are found to be positively associated with higher project performance.

The Effect on Task Performance Ability of Project Method to Develop Solar Tracking Control System in Specialized High School (특성화고의 태양광 추적 제어 시스템 개발 프로젝트법이 학습자의 과제 수행 능력에 미치는 효과)

  • Han, Yu-Jin;Kim, Bang-Hee;Kim, Jinsoo
    • Journal of Engineering Education Research
    • /
    • v.17 no.1
    • /
    • pp.3-11
    • /
    • 2014
  • The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.

Exploring the Relationship between Social Capital and Team Climate in IT Project Teams (IT 프로젝트 팀에 있어서 내외부 사회적 자본과 조직 분위기에 관한 연구)

  • Lee, Jungwoo;Lee, Hyejung;Lee, Seulki
    • Journal of Information Technology Services
    • /
    • v.16 no.3
    • /
    • pp.67-81
    • /
    • 2017
  • IT project teams are composed of experts from various domains with different backgrounds, such as business and technologies. Thus, enhancing knowledge sharing and increasing team social capital are critical for the success of the project. This study examines the relationship among the team social capital, team climate and team performance. A research model and hypotheses are developed from literature review and empirically validated. The research model consists of team social capital, team climate and team performance. Specifically, team social capital, as antecedents, wasconceptualized asinternal and external differentiated by team boundary, and team climate is conceptualized as innovative climate and supportive climate. Using measures adopted from previous studies, 166 data points were collected to test the research model and related hypotheses. PLS data analysis indicated that internal and external social capitalhave positive effect on innovative climate while internal social capital has a positive effect on supportive team climate. The innovative and supportive climate has significant effect on the team performance. Based on the results, we proposed several team management skills for IT project managers. Theoretical constributions are discussed at the end with limitations and further studies.

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A study on performance capability of local government on the forest tending project (지방자치단체 숲가꾸기 사업 수행역량에 관한 연구)

  • Kim, Myoung-Kwan;Oh, Do-Kyo;Kim, Se-Bin
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.1
    • /
    • pp.1-11
    • /
    • 2013
  • The study proposes to draw out the correlation on what kinds of influences local government personnel's performance capability affect the overall quality of the project, and to suggest institutional supplement policies. For the study, two analytical methods are conducted. First, a hypothesis per each factor was set by classifying the factors which affect the personnel's performance capability into organizational and individual factors. Second, a survey was conducted targeting the project management personnels and presented the result on the verification of the hypothesis through statistic techniques. As the result, it is considered that the quality of forest tending project is more affected by the individual factors than the organizational factor, thereby this study suggests the methods of reinforcement in project management personnel's performance capability.

Effect of Senior Managers' Characteristics on Project Manager's Reporting Tendencies and Information Systems Development Performance (프로젝트 상급자 특성이 프로젝트관리자의 보고 성향과 시스템 개발성과에 미치는 영향)

  • Jang, Si-Young;Oh, Man-Seok
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.149-179
    • /
    • 2012
  • This study explores the reporting tendencies of project managers when sending a status reports to their respective senior managers in information systems development project. It also examines the effect of selective reporting on report quality and systems development performance. The research model is proposed based on literature survey as well as key points from Iacovou et al. [2009] which is an extension of selective reporting in information systems project. Analysis of responses from 257 project managers in information systems industry indicates that pessimistic reporting by project managers has negative effect on both report quality (mediator variable) and systems development performance, while optimistic reporting has no significant effect on systems development performance. The CEO interest has an impact on the senior manager's power, which in turn leads to optimistic reporting by project managers. The senior manager's character has an impact on the senior manager's leadership, which in turn leads to pessimistic reporting. No direct relationship exists either between CEO interest and optimistic reporting or between senior manager's character and pessimistic reporting. In addition, trust toward the senior managers is significantly related to pessimistic reporting. Finally, report tendencies are also found to be affected by the active/passive characteristics of project managers.