A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

A Case Study on Realization of ITSM Performance Applying the Change Management Framework of ITSM (ITSM 변화관리 체계 적용을 통한 ITSM 도입성과 향상에 관한 사례 연구)

  • Kim, Hee-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.3
    • /
    • pp.251-264
    • /
    • 2011
  • Recently, interests in IT Service Management(ITSM) are increasing internationally as well as domestically. In order to realize the benefits from ITSM, it is necessary to institutionalize it as a culture of the organization through effective change management. One of the most promising approach of effective change management is the change management framework of ITSM. In this study, we analyze a success case in which the change management framework of ITSM was applied to IT Service company which has introduced ITSM. Through the analyses, this study aims to propose a feasible and specific approach to institutionalize ITSM. To accomplish the objective, the study is designed to analyze specific methods for applying ITSM's change management framework to ITSM organizations, performance of projects and future directions based on interviews and review of project documents/deliverables. This study could not provide detailed performance measures due to lack of previous research on this topic and difficulty of obtaining quantitative data. However, this study has contributed to proposing a direction to institutionalize ITSM in organizations by analyzing a feasibility of ITSM's change management framework in implementing ITSM.

Development of a new Model and Methodology for the Analysis of the Performance Evaluation of G2B Systems in e-government: EEM (전자정부 G2B 시스템의 성과평가 분석을 위한 새로운 평가 모델 및 방법론 개발)

  • Lim, Gyoo-Gun;Lee, Jae-Kyu;Lee, Dae-Chul
    • Information Systems Review
    • /
    • v.10 no.2
    • /
    • pp.269-289
    • /
    • 2008
  • It is very difficult problem to estimate and evaluate the performance of e-government system which scope and size are large and its effectiveness can not be seen shortly but reveals after several years. It is because the previous offline processes can not be transformed to online ones fully and shortly. For such e-transformation cases, the performance evaluation model should be adjusted and modified gradually as time passes. This paper propose new EEM(E-transformation Evaluation Model) model and methodology to evaluate G2B system that is one of large e-government project. EEM model can derive monetary value of e-transformatized business process areas(online areas). It also estimate the expected effect of offline area that is not yet transformed to online. EEM model consists of standard model, verification model and estimation model with some variables such as evaluation year, evaluation area and data type. By using survey data and database data together it can validate the correctness of the model and derive the effect of the system introduction. This paper also propose EEM evaluation methodology consisting of 5 stages and 10 sub processes to evaluate online and offline effect efficiently. To show the usefulness of this study, we evaluate the performance of Korea G2B system named KONEPS which is famous as a successful e-government case in the world by using the proposed model and methodology. The proposed model and methodology can be applied to different similar areas including e-government projects and large scale information system introduction in private sectors. This study can be also used for establishing appropriate policies about e-government project and informatization issues.

Aid Effectiveness in Practice: A Case Study on the National Data Center in Mongolia

  • Hong, Sung Gul;Lee, Sang Joon
    • Journal of Service Research and Studies
    • /
    • v.3 no.2
    • /
    • pp.1-17
    • /
    • 2013
  • The main purpose of this paper is to examine the aid effectiveness of ODA projects through a case of an e-Government ODA. The case at hand is the Mongolian National Data Center project, which was supported by Korea International Cooperation Agency in 2007~2009. In this paper, we analyze aid effectiveness through a case instead of a long-term macroeconomic analysis. By using OECD DAC guideline for performance evaluation of ODA project combined with PRM (Performance Reference Model) for evaluating e-Government, authors undertakes a post-implementation evaluation on the Mongolian NDC project. The result shows that the NDC project has been relevant and implemented effectively and efficiently given the political instability incurred by the election fraud in 2008. However, there have been problems as well. Provision of defected monitors was a critical problem while disagreement on the safety of the building was lasted for two more years to be settled. Some comments on the training program are also worth to hear to ameliorate similar projects. But more fundamental problems are found in impacts and sustainability areas. Low political status of ICTPA as a coordinating organization for ICT ODA and unstable job security of NDC are serious hurdles to increase effectiveness and efficiency of NDC. ICTPA has played very limited roles in coordinating government-wide ICT ODA projects because it lacks actual power and control over them. Other government organizations do not fully trust NDC as a reliable government data center due to low political status and lack of job security. Thus critical factors to affect the effectiveness and efficiency of e-Government ODA projects are political and organizational instead of economic.

  • PDF

Risk Critical Point (RCP): A Quantifying Safety-Based Method Developed to Screen Construction Safety Risks

  • Soltanmohammadi, Mehdi;Saberi, Morteza;Yoon, Jin Hee;Soltanmohammadi, Khatereh;Pazhoheshfar, Peiman
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.3
    • /
    • pp.221-235
    • /
    • 2015
  • Risk assessment is an important phase of risk management. It is the stage in which risk is measured thoroughly to achieve effective management. Some factors such as probability and impact of risk have been used in the literature related to construction projects. Because in high-rise projects safety issues are paramount, this study has tried to develop a quantifying technique that takes into account three factors: probability, impact and Safety Performance Index (SPI) where the SPI is defined as the capability of an appropriate response to reduce or limit the effect of an event after its occurrence with regard to safety pertaining to a project. Regarding risk-related literatures which cover an uncertain subject, the proposed method developed in this research is based on a fuzzy logic approach. This approach entails a questionnaire in which the subjectivity and vagueness of responses is dealt with by using triangular fuzzy numbers instead of linguistic terms. This method returns a Risk Critical Point (RCP) on a zoning chart that places risks under categories: critical, critical-probability, critical-impact, and non-critical. The high-rise project in the execution phase has been taken as a case study to confirm the applicability of the proposed method. The monitoring results showed that the RCP method has the inherent ability to be extended to subsequent applications in the phases of risk response and control.

Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling (시스템다이내믹스 모델을 이용한 국내 설계시공 일괄입찰 발주방식 특성분석)

  • Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.119-131
    • /
    • 2007
  • Design build (DB) is a construction project delivery system which has become one of the favored ones and the growth of DB by the public agencies has been steadily increasing. DB can be viewed as an evolutionary project delivery system, since DB project team members collaborate on work with each other, keep seeking cost effective and innovative alternatives that meet the construction needs of the project. Thus DB outperformed others in delivery speed, cost saving, and turnover quality. In Korea, DB projects likewise have steadily increased that it is needed to analyze characteristics of DB delivery system in Korea. For that purpose, this research would offer an analysis of characteristics of DB delivery system in Korea using system dynamics model with investigating the public market trend, comparing DB performance to DBB, and analyzing questionnaire survey.

BSC Analysis of Performance Measurement Systems of Government S&T Research Institutes (BSC 관점을 활용한 출연연구기관 평가제도의 수용성 연구)

  • Kim Byung-Tae;Nam Young-Ho
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1087-1116
    • /
    • 2005
  • This research examines performance evaluatees' opinions regarding the institutional performance evaluation systems of Government S&T Research Institutes (GRI). Research methodology is as follows: first, four perspectives of Kaplan & Norton (1992) Balanced Scorecard Model are revised into six perspectives suitable to GRI's characteristics. Second, experts classify current performance evaluation measures into the six perspectives. This enables different evaluation systems of three GRI evaluation groups to be compared under the same evaluation measures. Third, GRI's evaluatees are asked to allocate ideal weights on the performance measures. The evaluatees' weights are compared with the weights of current performance measures, and the characteristics of evaluatees' opinions about current performance evaluation systems are analyzed. Results are as follows; first, six perspectives for Korean GRIs are financial, long-term outcome, short-term outcome, strategic direction, project management, human resources perspectives. second, GRI evaluation systems put the most weights on the long- and short-term outcome perspectives and the least weights on the financial perspective. This result complies with theoretical model: in performance evaluation of GRIs, the customer perspective is the most important one while the financial perspective is the least important one. Third, evaluatees think that the long-term outcome perspective of the Basic-technology GRI group and the short-term outcome perspective of the Applied-technology GRI Group needs more weight. Fourth, it is found that the current systems have more weights on the project management and strategic direction perspectives than evaluatees think. The possible explanation of this result would be that since the measures of these perspectives are relatively easier to set up than those of other perspectives, the current systems contains larger number of measures and, accordingly more weights.

  • PDF

Development of the Performance Analysis Model Based on Research and Development Phases for Automated Construction Equipment

  • Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.1-17
    • /
    • 2012
  • The automated construction machines have been recently developed to help solve the construction industry problems that significantly affect labour, productivity, quality, and profit. Despite the importance of performance analysis to commercialize the automated construction machines, previous studies have mainly concentrated on developing hardware and software of automated construction machines. This research now focuses on two objectives: (1) to propose an analysis model which can measure productivity, quality, and safety improvement rate of automated construction machines based on research and development (R&D); and (2) to develop a performance analysis system which will aid the evaluator in analysing the performance of automated construction machines. Finally, it is anticipated that the effective use of the performance analysis model and computerized system will ably develop the high-performance, automated construction machines and establish the marketing strategy to increase not only the commercial value but also the upkeep and development of construction machines.

The Impact of Skills Development on Employee Performance

  • Farid, Khemissi;Taher, Jouili
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.11
    • /
    • pp.278-286
    • /
    • 2021
  • The aim of this paper is to examine the importance of skills development in the process of employee performance. As part of this research, we will seek to determine the nature and extent of skills development impact in improving employee performance. This research project is one of the new themes that some researchers have started in recent years. The novelty of this theme is the inclusion of the skill development factor. This factor is likely to have a positive impact on employee motivation and performance. Some of the factors already known to have an impact on employee performance, such as motivation, career development, training, and experience, will be adopted. It is assumed that the results of this research will have a positive impact on employee performance and employee retention.

A Study on the ITIL Management Model Based on the IT Governance for Public Sector (공공부분을 위한 IT 거버넌스 기반의 ITIL 관리 모델에 관한 연구)

  • Kim, Sang-Gil;Kim, Jin-Young;Park, Yeung-Gyu
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.4
    • /
    • pp.490-505
    • /
    • 2014
  • IT governance in order to achieve the strategic goals of the organization, leadership, organizational structure, and the process is defined. In order to achieve IT governance, organizational structure, leadership for spindle formation, maintenance, and standardized processes to specific and an effective ITIL (Information Technology Infrastructure Library) management model is needed. In this study, the K Authority Management Model of IT Governance ITIL - based research on service delivery and customer satisfaction through the effective information for ITSM (Information Technology Service Management, IT Service Management) building measures, information for business planning and performance management PMS (Project Management System, project Management System), survey on ICT service levels established through the process of planning and construction management models such as ITIL future research on the public portion of the proceeds from the ITIL management model can be utilized as a guideline when establishing a theoretical presents a base.