• 제목/요약/키워드: IT project performance

Search Result 1,422, Processing Time 0.027 seconds

FACTOR ANALYSIS ON CONTRACTOR COMPETITION STRATEGY: A HONG KONG STUDY

  • L. Y. Shen;Y. T. Tan;S C Song;M X Yu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.289-298
    • /
    • 2007
  • The development of construction industry has led to the increase in the number of criteria imposed by project clients for selecting contractors. For example, clients often request tenderers to satisfy various conditions such as tight programme, financial strength, managerial ability, relevant work experiences, technical strength, high workmanship standard, safety requirement, quality specification, and yet others. This trend has attracted research interests of devising various methods for helping project clients to assess contractors' bids. For example, in recent development, the Works Bureau of the Hong Kong Government has introduced two mechanisms in tender evaluation for various public work contracts, namely, the Marking Scheme effective from June 2002 and the Formula Approach effective from November 2002 [1], [2]. These approaches evaluate a contractor's tender by considering collectively its tender price and performance attributes, the latter including contractor experience, past performance, technical resources and technical content of his proposal. The tender with the highest combined price and performance score (CPPS) will be normally recommended for acceptance. It appears, however, that there is little existing research in helping contractors to identify a competition strategy that enables the contractor to offer his most competitive bid collectively taking into account his resource capacities and project client's multiple performance criteria. This paper examines the factors affecting contractor's competition strategy to compete for works in Hong Kong. The understanding about the factors will contribute to identifying effective competition strategy. The data used for the analysis were collected from Hong Kong construction industry. The research findings may provide valuable references for investigating effective competition strategies in other construction industries outside the region.

  • PDF

Robust Real-time Object Detection on Construction Sites Using Integral Channel Features

  • Kim, Jinwoo;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.304-309
    • /
    • 2015
  • On construction sites, it is important to monitor the performance of construction equipment and workers to achieve successful construction project management; especially, vision-based detection methods have advantages for the real-time site data collection for safety and productivity analyses. Although many researchers developed vision-based detection methods with acceptable performance, there are still limitations to be addressed: 1) sensitiveness to the shape and appearance changes of moving objects in difference working postures, and 2) high computation time. To deal with the limitations, this paper proposes a detection algorithm of construction equipment based on Integral Channel Features. For validation, 16,850 frames of video streams were recorded and analyzed. The results showed that the proposed method worked in high performance in terms of accuracy and processing time. In conclusion, the developed method can help to understand useful site information including working pattern, working time and input manpower analyses.

  • PDF

Case Study for Restructuring Informatization Level Indices of Small and Medium sizd Enterprises (중소기업정보화 수준 조사 지표 개선 사례 연구)

  • Yang, Hee-Dong;Kim, Ki Ho;Han, Hyun-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.4
    • /
    • pp.197-212
    • /
    • 2012
  • In this paper, we report the public IT policy case results to restructure informatization level indices for small and medium sized enterprise(SME). The indices restructuring project was initiated by TIPA with the group of experts during 2011, and the newly amended indices was employed as the formal instrument to measure SME informatization level. The critical drivers to reform the indices include simplification for more accurate measurement of SME informatization level, reshaping key representative indices of smart IT to better publicize SME's interest toward advanced IT, and systematic reconfiguration of performance measures which reflect business performance enhancement effect through IT investment. Indeed, the IT performance indices are unified to incorporate the instrument for general SME informatization level survey and IT adoption subsidy's effectiveness appraisal. The procedures and details of logic illustrated in this paper provides useful insight for successful implementation of SME informatization as well as for the better policy deployment of IT subsidization for SMEs.

A Study on ERP System for EVMS in Project-based Industry (프로젝트형 산업의 EVMS을 위한 ERP 시스템에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.343-348
    • /
    • 2010
  • Earned Value Management System(EVMS) is a highly efficient tool in the project management, but it cannot easily determine the Actual Cost due to the indistinct criteria and extensive data. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

  • PDF

Selecting Improvement Projects that Add Value to Customers

  • Setijono, Djoko;Dahlgaard, Jens J.
    • International Journal of Quality Innovation
    • /
    • v.8 no.1
    • /
    • pp.15-26
    • /
    • 2007
  • This paper presents a methodology to nominate and select improvement projects that are perceived as adding value to customers (both internal and external). The structure of the methodology can be explained in three "stages." First, the methodology suggests a new way of categorizing improvement opportunities, i.e. reactive-proactive, to "upgrade" the little Q-big Q categorisation. Then, it develops a roadmap that links performance indicators and improvement projects for both reactive and proactive improvements. Finally, it suggests an algorithm to select the improvement project, where the assessment of to what extent the nominated improvement projects add value to customers relies on the comparison between Overall Perceived Benefits (OPB) and Overall Perceived Efforts (OPE). The improvement project perceived as having the largest impact on adding value to customers receives the highest priority.

A Study on Affecting Factor-Construction of Collaborative Planning Process and Effect on Comprehensive Rural Village Development Project (농촌마을종합개발사업의 협력적 계획과정과 계획효과의 영향구조 분석)

  • Kim, Tae-Gu;Lee, Seong-Keun
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.23-43
    • /
    • 2014
  • This study aims to analyze the affecting factors-construction of collaborative planning process and effect on Comprehensive Rural Village Development Project. To this end, targeting the 36 districts which were selected for 2004 Comprehensive Rural Village Development Project and completed their 2010 5-year projects, components of collaborative planning process and planning effect will be drawn and the affecting factors-construction of collaborative planning and effect on Comprehensive Rural Village Development Project will be analyzed below. According to the results of this study, the affecting factors of collaborative planning process of Comprehensive Rural Village Development Project on planning effect, The level of effect of individual component on endogenous variable appeared greatest mostly in the upper groups. In terms of the level of individual component effect, social learning process and interaction among participants affected greatest. The process of Comprehensive Rural Village Development Project is evaluated that it reflected collaborative planning theory of Healey enough. Therefore, in the course of Comprehensive Rural Village Development Project progress, collaborative planning model must pass social learning process and interaction among participants which are the most important components out of collaborative planning process as we saw in the upper groups. And in order to maximize the performance and results of Comprehensive Rural Village Development Project, the following sequential affecting factors model as Figure 7 must be suggested as optimal collaborative planning models of Comprehensive Rural Village Development Project. Based on the results of the study, the policy implication was drawn as follows. First, systematic supplementations in the form of a consultative body are required to perform Comprehensive Rural Village Development Project efficiently. Second, network needs to be built among different participants in Comprehensive Rural Village Development Project process. Third, systematic mechanism is required to improve social learning among different participants. Fourth, systematic rearrangement is required to guarantee the residents' realistic participation in the course of Comprehensive Rural Village Development Project process.

Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method (DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석)

  • Lee, A-Yeon;Chang, Mi-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.

Research Trend Analysis in the Performance Measurement and Monitoring of Construction Projects through Keyword Analysis (선행연구 키워드 분석을 통한 건설 프로젝트의 성과측정 및 관리분야의 연구 트렌드 분석)

  • Kim, Chang-Won;Kim, Taehoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.171-172
    • /
    • 2018
  • Performance measurement and management in the construction industry has traditionally been regarded as the major factor for successful business execution. In addition, there is emphasis on the function of performance measurement and management that can early warn potential risks and poor performance in project execution environment changes. Previous studies have made various attempts to measure the quantitative performance of construction projects, and the research to derive the link between the results and the issue that can meet the future needs is expected to provide valuable information. The purpose of this study is to analyze the research trends based on the keywords presented in previous studies on the performance measurement and management of construction projects. Considering that the results presented in the existing literature can be an indicator of the evolution of the sector before it is applied to industry, the result of this study is expected to be used as a basic data to support the establishment of research direction in the future.

  • PDF

A Study on Methods of Performance Testing for Enterprise Resource Planning System (ERP 시스템 성능 테스트 방법 연구)

  • Shin, Hyun-Jong;Kim, Kyung-Hyun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.657-665
    • /
    • 2003
  • ERP 시스템은 전사 통합 관점에서 기업 전체의 업무를 관리하기 때문에, 업무 집중도가 높고, 처리량이 많으며, 업무가 Waterfall 모델로 설계된 부분이 많은 특성이 있어, 어느 한 부분의 성능 문제가 전체 시스템 운영의 중대한 Issue로 확대될 가능성이 크다. 본 논문을 통해서 ERP 시스템의 성능 Issue를 사전에 점검할 수 있는 성능 테스트(Performance Testing) 방법을 연구했고, 실제 ERP 시스템 구축 Project에 투입되어 성능 테스트를 진행한 사례를 고찰하여, 발견된 Issue를 토대로 ERP 시스템의 성능을 최적화하고 시스템을 안정적으로 운영할 수 있는 방안을 연구해 보았다.

  • PDF

A Case Study on Risk Analysis of Large Construction Projects (건설공사를 위한 위험분석기법 사례연구)

  • Kim Chang Hak;Park Seo Young;Kwak Joong Min;Kang In-Seok
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1155-1162
    • /
    • 2004
  • This research proposes a new risk analysis method in order to guarantee successful performance of construction projects. The proposed risk analysis methods consists of four phases. First step, AHP model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Finally, Fuzzy theory suggests a risk management method for construction projects, which is using subjective knowledge of an expert and linguistic value, to analyze and quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and exposure, for estimating membership function are introduced to quantify each risk factor. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF