• Title/Summary/Keyword: IT in Construction

Search Result 21,514, Processing Time 0.046 seconds

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

A Study on the Selection Method of Construction Management based on Public Construction Projects (공공건설사업의 건설사업관리방식 선정 방법에 관한 연구)

  • Kim, Kwan-Su;Park, Hyung-Keun;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.65-73
    • /
    • 2013
  • Even though the construction management (CM) system was introduced for the purpose of increasing the efficiency of the domestic construction industry along with the establishment of construction industry fundamental laws in December of 1996, now it is very difficult that the public institutions can judge their application of construction management methods due to the lack of clear guidelines or directions to select construction management methods when the public institutions were executing public construction projects. Therefore, this study was executed to prepare for the selection criteria which could be referred in reviewing the application of construction management ordering methods according to public institution's competences and project characteristics. It is expected that future domestic demand of construction management will be gradually increasing both in public and private construction sectors. However under the current construction management systems, it is judged to be difficult that the construction projects that apply the construction management methods will be activated with full-scale. Therefore, it could be said that active efforts in domestic sectors are required in order that the construction management systems of developed countries levels could be activated. Additionally in order to vitalize the construction management systems, it is expected that public institutions could use this study results as the review data for feasibility of construction projects for the consignment of construction management in selecting the ordering methods.

Analyzing Technological Capability of the Korean Construction Industry;Comparison with Cases in U.S., U.K., Japan and Korea

  • Lim, Dae-Hee;Lee, Hyun-Soo;Park, Moon-Seo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.722-727
    • /
    • 2007
  • As the world construction market is rearranged by the level of technological capability, recently the technological capability in construction industry is developing rapidly. The important of measuring and analyzing technological capability in construction industry is gaining more and more emphasis. It enables to grasp the past and present situation of construction industry as well as to foresee changes in the future. However the concept of technological capability cannot be identified easily, as well as it is hard to compare that capability of construction industry among different countries. Although there have been numerous studies conducted on the technological capability of construction industry, most of the studies were in formsof surveys of specialists or industry professionals which lacked objectivity and sound basis for data. This study will be focused on investigating the methodology in exploiting and measuring surface of the earth and developing indicator and process to understand technological capability in construction industry through quantitative and statistical analysis. Then it will verify them through a case study.

  • PDF

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

A Basic Study for Web Site's Stimulation of Domestic Construction Companies (국내 건설업체의 웹사이트 활성화를 위한 기초적 연구)

  • Park Shin;Ahn Yong-Sun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.175-183
    • /
    • 2001
  • Nowadays, most domestic construction companies are concentrating their interests on IT areas, so a variety advanced techniques such as CRM, SCM, ERP have been adopted by them. this is one of the ways to survive in the domestic market. It is the current tendency in the construction business. But, Home Pages of domestic construction companies are composed of simple structures which are limited to simple advertisements of each company or simple system application. It has been reported that customers are still maintaining low participation in this situation. This study first will analyze implementation situations in other business area's and survey people's opinions in construction-related areas. Then we will provide basic data for web-site's stimulation of construction companies.

  • PDF

The Constructability Evaluation of Ecological Restoration Construction Using Environment-friendly Design Factor - In the case of Construction of Gucheon Eco-River in Geoge City - (친환경적 설계인자를 적용한 생태복원공사의 시공성 평가 - 거제시 구천천 생태하천 조성공사를 중심으로 -)

  • An, Byung-Chul
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.4
    • /
    • pp.99-114
    • /
    • 2013
  • In this study, constructability of ecologocal stream restoration process was evaluated and improved approaches for habitat were suggested. The study site is Gucheon River in Geoje city where conducted ecologocal restoration work within maintaining its flood control function. Application of ecological design factors and constructability in the process from planning to construction was analyzed and its results are as follows: In the process of planning and designing, it was focused more on the naturality of Gucheon River rather than the human convinience and ecological design factors were applied within the ecological capacity of the site. First, the indexes for constructability evaluation is selected. It was classified into three major categories as construction quality, design quality and construction administration system. Each index has details, so there are twenty sub indexes for contractibility evaluation. Second, the evaluation results shows that the index most in need of improvement was plumbing construction, followed by Stone construction and pavement construction. design concept was evaluated as appropriate in entire categories. Finally it is suggested that it can be improved in both process of design to enhance the technology and process of construction to enhance the quality management. The constructability of ecological stream needs adaptive management and it must be discussed with its designing which is at the stage before construction. Also it needs discussion with its designer constantly and feed-back process.

Applications of Product Process Analysis For Improving the Construction Process of Structural Steel

  • Lee Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.101-108
    • /
    • 2004
  • A construction process consists of value adding activities and non-value adding activities, necessary or unnecessary. If construction personnel can eliminate inefficient and/or unnecessary activities within the process, they may have a great opportunity to improve their construction process. The Product Process Analysis (PPA) technique, which was developed in the manufacturing industry, can be applied for identifying wastes in the construction process and ultimately improving the process itself. It provides useful tools, such as a process chart worksheet and flow diagram, for mapping the flow of construction activities with predetermined standardized symbols. These tools make people understand the flow of activities more easily, identify value adding/non-value adding activities within the process, and areas where the process can be improved. The example applications of PPA are demonstrated in the paper through the case studies implemented on the construction process of structural steel. The results of case studies indicate that PPA technique was effective at identifying and removing wastes in the steel construction process. It is also found that PPA technique is more effective for improving highly repetitive construction processes.

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

A Plan to Attract Graduates from Construction Education Facilities to Employment in Construction Industry by Age (건설교육기관 수료생의 연령별 건설업 취업 유인방안)

  • Ahn, Jong-Hyeok;Jeong, Hyun-Young;Kim, Hyeon Su;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.153-154
    • /
    • 2021
  • Currently, the construction industry is decreasing every year due to people's poor perception, high labor intensity, unstable employment structure, and welfare problems, as people avoid entry. Accordingly, this study investigated how to attract trainees and graduates from domestic construction education institutions to the construction industry. If institutional devices are prepared to prepare for the future by improving the welfare system such as unemployment benefits and retirement deductions in the construction industry, many trainees in their 20s and 30s will be attracted to the construction industry. If it helps expand hands-on education through on-site linkage and has the necessary technical skills for practice, it is believed that trainees and graduates in their 4s and 60s will be attracted to the construction industry.

  • PDF

Construction Equipment Fleet Optimization for Saving Fuel Consumption (에너지 절감을 위한 건설장비 조합 최적화 방법 연구)

  • Yi, Chang-Yong;Lee, Hong-Chul;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.198-199
    • /
    • 2015
  • Construction equipment is a major energy consumption source in construction projects. If 10% reduction of the diesel fuel usage is achieved in the construction industry, it may reduce 5% of the total energy usage. Energy saving operation is a major issue in equipment-intensive operations (e.g., earthmoving or paving operations). Identifying optimal equipment fleet is important measure to achieve low-energy consumption in those operations. This study presents a system which finds an optimal equipment fleet by computing the low-energy performance of earthmoving operations. It establishes construction operation model and compares numerous combinations using alternative equipment allocation plans. It implements sensitivity analysis that facilitates searching the lowest energy consumption equipment fleet by enumerating all cases.

  • PDF