Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

생태미학적 관점에서의 지속가능한 흙건축 특성에 관한 연구 - 노자사상을 중심으로 - (A Study on Sustainable Earth Architecture Characteristic from Ecological Aesthetic Point of View - Focus on the thoughts of Lao-tzu -)

  • 김설희;허범팔
    • 한국실내디자인학회논문집
    • /
    • 제20권4호
    • /
    • pp.54-62
    • /
    • 2011
  • Fast industrialization caused from Descartes' dichotomy has enormously developed our world, but endangered the ecosystem. In this study, the ecosystem aesthetics is not only a critique against existing growth-ideology and technical civilization, but also the art pursuing the life as an artistic state and achieving the dream for qualitatively different new future. Lao-tzu's Natural Beauty assumes that the adaptation to natural laws can lead every purpose's achievement. Based on such theoretical alternative, the earth construction as a medium for coexisting mankind, nature and construction interacts with the other objects through the natural affinity, the energy efficiency, the material generation. The earth construction provides the images of naivety, naturalness, folk as well as emotional stability in cultural terms. This study's direction and method are as follows. First, it researches the ecosystem aesthetics from the Taoism viewpoint, the alternative for environmental healing based on theoretical reviews about the ecosystem aesthetics. Second, it researches the earth construction's ecosystem aesthetic features and construction features from the low-tech aspect in continual construction genealogy. Third, it analyzes some cases targeting domestic buildings by drawing out expression methods and features through the connectivity of earth construction and ecosystem aesthetics. The earth construction lies between the heaven and the earth, but coexists in natural cycle. The earth construction caused from ecosystem aesthetics will be a future alterative, and various studies about its features and methods should be continued.

건설공사 성과측정시스템의 사후평가항목 영향요인 분석에 대한 기초연구 (A Basis Study on the Influential Factors Analysis of Post-Evaluation Item of Performance Measurement System in Construction Project)

  • 이은지;하희윤;최진욱;정경택;박치호;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.347-350
    • /
    • 2006
  • 오늘날 우리나라의 건설산업은 변화의 한복판에 서 있다. 건설산업은 점차 대형화, 전문화, 고도화되어 가고 있으며 타 산업과의 융합 또한 빠른 속도로 진행되고 있다. 이러한 추세에 따라 이해관계자들이 참여하는 건설사업의 프로젝트 수행과정 평가의 투명성과 객관적 평가방법에 대한 요구가 높아지고 있으며 발주자 및 고객의 니즈(Needs)는 보다 구체화 되고 있다. 그 수준 또한 높아지고 있어 프로젝트의 성공 여부를 판단하기 위한 객관적 평가기준을 필요로 하고 있다. 본 연구에서는 기존 건설사업 성과측정 시스템 분석을 통해 문제점을 파악하고 이를 바탕으로 고객만족 등의 정성적 평가부분을 포함한 사후평가에 대한 영향요인을 분석하여 새로운 성과측정 시스템을 제시하고자 한다.

  • PDF

BIM 기반의 현대식 한옥 시공시뮬레이션 구현을 위한 한옥 공정분석 연구 (Construction Process Analysis of Han-Ok for BIM Based Modern Han-Ok Construction Simulation)

  • 윤석헌
    • 한국건설관리학회논문집
    • /
    • 제12권3호
    • /
    • pp.3-10
    • /
    • 2011
  • 최근 한옥의 산업화와 보급화를 위한 다양한 기술들이 개발되고 있으나, 한옥의 시공 또는 공정에 대한 연구는 쉽게 찾아보기 어렵다. 이와 함께 최근 BIM에 대한 관심과 기술개발이 활발히 이루어지고 있는데, BIM 기술은 부위단위로 건축물을 설계하고 관리하는 기술로서, 최근 이를 이용한 많은 기술들이 개발되고 있다. 이러한 BIM 기술은 조립식 공법을 사용하는 한옥과 매우 밀접한 관계를 갖고 있다. 본 연구에서는 한옥의 시공과 공정관리의 체계화를 위하여, 대표적인 한옥의 형식인 익공식과 민도리식을 대상으로 기본적인 공정을 분석하고, 이를 현대식 공종분류 형태로 구성하여 WBS와 공정표를 작성하였다. 또한, 이렇게 작성된 공정을 기반으로 익공식 한옥을 대상으로 BIM의 한옥 시공 시뮬레이션 방안을 제시하고자 한다. 사례 연구의 경우, 조립식 공법의 한옥의 특징으로 인해, 한옥의 공정시뮬레이션은 95%정도의 시뮬레이션 자동 연계가 가능하였다.

보용 시스템 거푸집의 전용계획 자동화 알고리즘 기초연구 (Basic study of reuse planning automation algorithms on system forms that are used on girders and beams)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.7-8
    • /
    • 2015
  • Formwork accounts for 10% of the total construction cost and 30~40% of the framework cost, which is a fairly large part. Various system forms were developed for improved economic feasibility and constructability of formwork and for reduced construction duration. In general, the price of system forms per unit area is higher than that of the conventional method, yet the total construction cost can be reduced through higher reusability and constructability. However, if the reusability of forms is excessively increased to cut down the material cost, it may increase the construction duration, which will result in cost increase. On the other hand, if the reusability is decreased for reduction of construction duration, it may lead to cost increase caused by excessive input of materials. To solve such a problem, an algorithm for simplified reuse planning that meets the requirements of construction duration, cost, quality and safety is required. In this regard, the study intends to perform a fundamental research for development of reuse planning automation algorithms on system forms that are used on girders and beams.

  • PDF

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

아크릴 수지계 수팽창성 누수보수재의 재료적 성능평가에 관한 실험적 연구 (A Experimental Study on the Performance Test of Water Leakage Repair Materials for Water Expansion Acrylic Resin)

  • 홍채훈;김수련;곽규성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.51-56
    • /
    • 2005
  • It does not find for solution by limitation of technological mechanism of existent of leakage maintenance material. So, it is paid for huge expense because continuous repeat maintenance work is consisting. Furthermore, it is indicated by big problem in construction work that is constructed by field experience that thing by definite and systematic theory is not with proper performance test and analysis up to now. Therefore, wish to measure physical performance change by various environment condition maintenance of structure and performance construction work aspect in that apply to water leakage maintenance material using of acrylic resin system water expansion, leakage maintenance material in this research, and present suitable form of construction work under these environment. also, wish to ready diversified remedy by oversea market opening.

  • PDF

러시아 구성주의 조각의 텍토닉(Tectonic)적 공간 특성 - 밀라노 엑스포(Milan Expo, 2015) 파빌리온 중심으로 - (A Study on Spatial Construction of Tectonic in Russia Constructivism's Sculpture - Focused on the Milan Expo, 2015 Pavilion -)

  • 김민아;이찬
    • 한국실내디자인학회논문집
    • /
    • 제24권6호
    • /
    • pp.107-118
    • /
    • 2015
  • Today, The representation of the modern space is experimented with shape and surface of the de-structural point of view to make architecture and space, in terms of not being able to make defined by single regulation. However, it can correspond to the rapidly changing modern, but it is easy to fade of architecture fundamental meaning. Along with the need for the rise of the construction of fundamental space, should be built a 'tectonic' spatial, which is said to be building of logos. Tectonic, as norms for expressing the fundamental meaning of architecture, as to expression of construction, be unfolded with dualism such as science and art, technology and express, structure and formation, and it was introduced into the architecture through the construction expression of space that was a tectonic discussion of 19c german architects. On the other hand Constructivism which is avant-garde formative movement with Russia revolution, constructed 'sculpture' with the formative principles as tectonic. Tectonic's Formative characteristics can draw a conclusion with of tectonic characteristics of constructivism sculpture, space of logos will be realized through its study. Other hand, The pavilion, as symbol space, can be analyzed by tectonic properties, Pavilion, meaning the space is expressed in a variety of tectonic expression. As tectonic construction, fundamental ideology and symbolization of space is revealed metaphorically and visually.

프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로 (Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects)

  • 정설림;김대철
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 - (A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea)

  • 김덕곤;권오경;김종훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.48-57
    • /
    • 2003
  • BAT 공장 건설 프로젝트는 외국 발주자에게 한국 CM업체의 관리능력을 입증한 대표적인 프로젝트라고 한 수 있다. 본 프로젝트는 CM 사의 전문적인 관리를 통하여 외국의 공장건설에 비하여 $15\%$ 절감된 금액으로 공사를 완공할 수 있었으며, 철저한 공정관리로 공기를 단축하는 한편 준공 후 1개월도 안되어 생산이 이루어지는 성공적인 결과를 달성할 수 있었다. 본 프로젝트의 성공요인(Key Success Factors)은 CM사의 탁월한 관리능력이라고 할 수 있으나 더욱 중요한 성공요인은 사업관리의 모든 권한을 CM사에 위임하는 발주자의 신뢰에서 기인되었다고 할 수 있다. 본 연구는 "One Stop Shop" 개념의 CM 적용을 통하여 사업의 전단계에 걸친 전문적인 관리활동과 발주자와 CM사간의 신뢰의 중요성을 입증한 프로젝트에 적용된 Cost Management, Contract Management, Value Engineering 등의 활동을 고찰하였다. 본 연구를 통하여 민간시장의 CM활성화에 비하여 적용에 어려움을 주고 있는 공공시장에도 CM이 활성화 될 수 있는 계기를 되기를 바란다.

  • PDF