• Title/Summary/Keyword: IT in Construction

Search Result 21,514, Processing Time 0.044 seconds

CONSTRUCTION EDUCATIONAL GAME FOR K-12

  • Youjin Jang;Moonseo Park;Hyun-Soo Lee;Chanhyuk Park
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.546-552
    • /
    • 2013
  • The future competitiveness of construction industry is dependent on K-12 students. However, unfavorable images of construction industry have negative influence on K-12 students' decision-making of their career. This negative image makes them not want to find out what actually happens in construction industry. Consequently, it is important to give K-12 students the opportunity to know what construction employees actually do in their job. Studies show that K-12 students who encounter the job early-on are more likely to choose it as their career. In this context, this paper proposes construction educational game in which it can serve as a medium for capturing K-12 students' interest in Construction Management (CM). Based on the literature reviews, challenges of construction educational game for K-12 students which are edutainment, hands-on experience and social interaction, are derived. To address these issues, conceptual model and scenario are designed. Based on designed scenario, prototype of Simulation based Construction Game in Virtual World (SCGVW) is developed in Second Life (SL) and applicability test to K-12 students are implemented. This paper concludes with a discussion of the lessons learned and the future development steps of the construction educational game for K-12 students.

  • PDF

u-City IT인프라 구축 절차에 관한 연구 (A Study on the Construction Process of u-City IT Infrastructure)

  • 김정욱;김일중
    • 전기학회논문지P
    • /
    • 제58권3호
    • /
    • pp.291-296
    • /
    • 2009
  • "The Act on Ubiquitous City Construction and etc." stipulates the regulations on the planning, construction and management of the u-City. As its national-level law system is about to take its effects, future new city developments are expected to have its legal basis to be built to meet u-City requirements. Also, it is anticipated that such needs would require much more planning techniques and strategies. In reaction to those upcoming needs, this study is to search for new IT infrastructure construction process of the u-City in reality. It is also to supply with the each step framework to execute the u-City projects in more structuralize and systemize manner. Therefore, with the u-City IT infra construction guide line v1.0, purpose of the establishment of comprehensive IT infrastructure construction process.

Collaborative Relationship Analysis between Members of Apartment Construction Organizations

  • Kim, Jae-Yeob
    • 한국건축시공학회지
    • /
    • 제14권1호
    • /
    • pp.102-109
    • /
    • 2014
  • The purpose of this study is to analyze collaborative relationship between members of a building construction organization. For the analysis of collaborative relationship, this researcher collected data by conducting a questionnaire survey with members of three large building construction organizations for apartment housing. The analyzed contents of collaborative relationship were the 'frequency of communication between organizational members' and their 'reliability'. According to the analysis of communication network, construction managers had low frequency of communication, whereas those responsible for each area, like construction deputy managers, had high frequency of communication. It indicates that middle managers are at the center of communication related to construction work in construction organizations. According to the analysis of reliability network, construction managers showed highest reliability, and employees at the top level in an organizational map also showed high reliability. Since they generally have a lot of experience, are some older of age, and assume responsibility for work, they are considered to receive reliability from other organizational members. This study proved that it was possible to numerically express reliability of organizational members, which is an abstract concept, and analyze it. Therefore, it is expected that the analysis result will highly be likely to be used in the area of construction management.

공동주택의 2차 하자 유발공종 분석 (Analysis of Construction Types Causing Secondary Defects in Apartment Buildings)

  • 허영철;주재현;방홍순;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.74-75
    • /
    • 2019
  • There are certain types of construction that produces many defects during the construction of apartment buildings. It may be due to construction errors in the type itself, but more often, it is due to defects derived from other types of construction. Thus, to reduce such secondary defects and prevent fundamental defects in particular types of construction, academic research on the types of construction causing secondary defects should be actively conducted. In addition, as claimed in this study, the industries should work harder to improve the quality of the type of construction that causes secondary defects, rather than just trying to improve the ostensible problems. If the efforts of each sector are backed up, the disputes over defect repair in apartment building construction will reduce in general, which in turn will lead to a reduction in national loss within the construction industry.

  • PDF

COMPARATIVE ANALYSIS OF BIM ADOPTION IN KOREAN CONSTRUCTION INDUSTRY AND OTHER COUNTRIES

  • Jongsung Won;Ghang Lee;Chijoo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.587-592
    • /
    • 2009
  • Construction companies in Korea have shown interest in BIM (Building Information Modeling) even if late, adopted it, and applied it to several projects. But, it is hard to figure out the status of BIM implementation. Thus, this study is to figure out the status of BIM implementation in Korea by surveying major construction companies in Korea and comparing with similar surveys abroad. The survey result shows that only 11 companies in Korean construction industry adopted BIM. The clash check (73%) was mostly used among various BIM functions and other functions were used less than 30%. As of 2008, only 8 construction companies have used BIM in 27 projects and thus, Korean companies are in the BIM introduction period. Therefore, successful introduction of BIM is required by benchmarking the BIM introduction process of overseas construction industries

  • PDF

건설산업재해 저감 대책에 관한 사례분석 연구 (Case analysis study on measures to reduce accidents in the construction industry)

  • 강경하;소승영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.94-95
    • /
    • 2021
  • With the recent advancement of the construction industry, interest in it is growing as the accident rate in the construction industry continues to increase due to the enlargement and complexity of the construction scale. These social issues are focused on the safety of construction work, and research on construction industrial accidents is continuously being conducted, but research on measures to reduce construction industrial accidents is surprisingly insufficient. Therefore, in this study, research on reduction measures to increase the safety of construction industrial accidents conducted for 5 years from 2017 to 2021 is investigated and compared, and it is intended to be used as basic data for future construction industrial accident reduction measures.

  • PDF

사례분석에 의한 HPC공법의 공사비 분석 (Construction Cost Analysis of HPC Method by PC Construction Project Cases)

  • 노주성;김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

BRIEF HISTORY OF KOREA'S OVERSEAS CONSTRUCTION: LESSONS AND FUTURE STRATEGY

  • Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.862-868
    • /
    • 2005
  • The history of Korea's overseas construction began in 1965, and the cumulative contract amount is about $180 billion over the last 40 years. During the period, Korea's overseas construction industry has played an important role for economic development. However, it seems that the industry is in a sea of trouble. Overseas construction orders have declined due to various reasons such as companies losing confidence, limited financing, lack of competitiveness, and so on. This paper addresses the brief history of Korea's overseas construction industry and the problems that the industry is facing. Then it suggests a few measures for the improvement of the industry.

  • PDF

'음직하' 구성의 형태·통사적 연구 (The morpho-syntactic study on the construction of 'eumcikha' in Korean.)

  • 시정곤
    • 한국어학
    • /
    • 제48권
    • /
    • pp.193-221
    • /
    • 2010
  • The goal of this paper is to reanalyze the structure of 'eumcikha(음직하)' in Korean. We have several important previous works for it. This paper argued against previous works and pointed outd their problems. At first, this paper regarded the construction of 'eumcikha' as one of the modality dependent noun constructions. In this paper I proposed some possibilities of new structure of 'eumcikha'. 1) The structure of 'eumcikha' is not regarded as the 'embedded sentence+upper sentence' construction. 2) It is not also considered as the 'main verb+auxiliary verb' construction. 3) It is not recognized as a morphological one unit, although they have lots of in common. In this paper, I proposed that the construction of 'eumcikha' has both syntactic property and morphological property. Owing to these properties, it is so difficult to determine the structure of it.

AHP를 이용한 건설.IT융합 사업의 성공요인에 대한 연구 (Analysis of success factors in construction IT convergence : applying AHP)

  • 임정아;권순욱
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.130-138
    • /
    • 2011
  • 현재 건설업 및 산업전반에서 IT기술을 융합한 새로운 사업에 대한 수요가 증가하고 있다. 건설 생산성, 품질, 안전향상을 위한 변화와 국제 경쟁력 강화를 위해 신시장 개척의 필요성이 증대되었으며 정부의 정책적 지원을 통해 u-city와 같은 수익모델이 개발되고 있다. 이와 함께 개발된 사업을 평가하고 활성화하기 위한 전략으로 산업계 및 정부차원에서 성공사례 발굴과 보급에 대한 지원이 이뤄지고 있다. 하지만 성공사례를 판단하기 위한 평가기준이 모호하고 각 분야의 참여자들의 관점이 달라서 판단주체가 누구냐에 따라 결과가 다르게 도출될 수 있어, 어떤 기준으로 성공사례를 판단하고 성공모델로 보급할 지에 대한 기준을 마련하여 발전방향을 제시할 필요가 있다. 따라서 본 연구에서는 건설 IT 융합 산업의 활성화를 위해 건설 IT융합 사업의 성공요인과 그 중요도를 도출하여 건설 IT융합 성공사례의 평가기준을 제시하는 것을 목적으로 한다.