• Title/Summary/Keyword: IT in Construction

Search Result 21,602, Processing Time 0.05 seconds

PROBABILISTIC MEASUREMENT OF RISK ASSOCIATED WITH INITIAL COST ESTIMATES

  • Seokyon Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.488-493
    • /
    • 2013
  • Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.

  • PDF

A Study on the Intensive Safety Management Items of Small-Sized Construction Sites (소규모 건축공사 중점안전관리항목에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Jang, Yun-Ra
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.27-34
    • /
    • 2013
  • Almost accidents in construction sites are occurred by unsafe work conditions and failure making safe environment. As recent construction projects become more complex, various and diversified, So the potential of construction-related accidents is increased as well. Comparing the frequency of construction-related accidents in large-sized construction sites, small-sized construction sites are more vulnerable because of lack of workforce and less effective technology system. Furthermore, the absence of safety committee, poor financial condition leads to lack of safety education, installation of safety facilities, and provision of individual protective equipment, which indicates difficulties handling even basic safety management. Therefore, in order to lower the hazard rate at small-Sized construction sites, it is necessary to proceed with more structural and thorough actions for preventing accidents. In other words, it is necessary to analyze the causes of the accidents at small-sized construction sites, set criteria for safety management, and suggest safety management items according to work classification by evaluating the relative importance of the items.

A Study on Establishment of Construction CALS Standardization system (건설CALS 표준화 체계 정립에 관한 기초적 연구)

  • 이상호;김명원;김봉근;유인채
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.181-196
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). A state of the art in standardization of the Construction CALS is reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three major parts were needed to set up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up to identifying Construction CALS and defining the standards and standardization. Secondly, the strategy to carry out more effectively in Construction CALS standardization and make the relationship of the concerned system presented here can be used to establish the Construction CALS standardization system. In addition, the spread and application device are proposed to use Construction CALS standards at public institution and construction related companies. Conclusively, a classification of the Construction CALS standards was proposed and some objects to be standardized were represented in that. Results studied in this paper will provide the primary information and basic model to develop a guideline for standardization of the Construction CALS.

  • PDF

A Study on the Derivation of Construction Priority in the Construction Stage of Green Remodeling in Public Buildings - With a Focus on Construction Elements - (공공 건축물 그린리모델링 시공단계 공사 우선사항 도출에 관한 연구 - 건축요소를 중심으로 -)

  • Park, Jun-Soo;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.59-60
    • /
    • 2023
  • Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.

  • PDF

The Analysis Textbooks and Instruction Activities of Construction Contents in 7th Mathematics Curriculum (7차 수학과 교육과정 작도 영역의 교과서와 수업사례 분석)

  • 조완영;정보나
    • School Mathematics
    • /
    • v.4 no.4
    • /
    • pp.601-615
    • /
    • 2002
  • This paper analyzed <7-나> and <8-나> textbooks and teacher instruction activities in classrooms, focusing on procedures used to solve construction problems. The analysis of the teachers' instruction and organization of the construction unit in <7-나> textbooks showed that the majority of the textbooks focused on the second step, i.e., the constructive step. Of the four steps for solving construction problems, teachers placed the most emphasis on the constructive order. The result of the analysis of <8-나> textbooks showed that a large number of textbooks explained the meaning of theorems that were to be proved, and that teachers demonstrated new terms by using a paper-folding activities, but there were no textbooks that tried to prove theorems through the process of construction. Here are two alternative suggestions for teaching strategies related to the construction step, a crucial means of connecting intuitive geometry with formal geometry. First, it is necessary to teach the four steps for solving construction problems in a practical manner and to divide instruction time evenly among the <7-나> textbooks' construction units. The four steps are analysis, construction, verification, and reflection. Second, it is necessary to understand the nature of geometrical figures involved before proving the problems and introducing the construction part as a tool for conjecture upon theorems used in <8-나> textbooks' demonstrative geometry units.

  • PDF

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF

The Current Status and Problems of Open Government Data on the Construction Sector and Its Improvement Plan (건설산업 공공데이터 개방의 현황과 과제)

  • Kim, Sung-Hwan;Choi, Seok-In;Yoo, Wi-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.219-220
    • /
    • 2022
  • In order to meet the trend, construction public data are already disclosing not only data generated at the construction site but also various data ranging from inspection reports and public construction contracts through multiple portals. However, unlike the excellence of the open performance evaluated by the number of data, it is difficult to evaluate the specific level of disclosure because there is no case of analyzing the quality, ease of use, and possibility of further opening of the public construction data set. On the other hand, performance measurement is already performed using an internationally agreed evaluation method in different fields such as real estate, population, and environment. So it is essential to analyze the current status of public data openings in the construction field and to derive improvement tasks. Therefore, this study conducted a survey of researchers with the highest system utilization targeting representative public data open systems in the construction field, such as E-AIS(세움터) and KISCON. To ensure fairness and increase comparability, the questionnaire was composed using evaluation items on implementing public data conducted annually by the World Wide Web Foundation, an international non-profit organization. With these responses, we investigated the status of public data disclosure and opinions on data quality and derived tasks to improve public data disclosure in construction through the analysis of the results.

  • PDF

Medication Error Management Climate and Perception for System Use according to Construction of Medication Error Prevention System (환자안전 관리자가 인식한 투약오류예방 시스템 구축실태에 따른 투약오류관리풍토 및 활용인식)

  • Kim, Myoung-Soo
    • Journal of Korean Academy of Nursing
    • /
    • v.42 no.4
    • /
    • pp.568-578
    • /
    • 2012
  • Purpose: The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. Methods: The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Results: Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. Conclusion: The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

Improvement Plan for the Payment Standard of Rental Fee in Construction New Technology (건설신기술 사용료 지급기준 개선방안)

  • Park, Hwan-Pyo;Oh, Un-O
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.193-201
    • /
    • 2006
  • The Evaluation system of Excellent Construction Technology has been operated for 15 years from 1990 in Korea. 443 technologies have been certified as Excellent Construction Technology(ECT) and those ECTs are adapted over 20,000 times into the construction projects. As a result of investigation, new technology evaluation system became a stable stage because new technology evaluation system has assigned about 433 and also applied more than 20,000 times in construction sites in 2004. However, it was indicated to a large problem that there aren't still detail criteria of cost assessment for using ECTs. Therefore, we analyzed the status and problems of the cost of using ECTs and suggested some useful ideas which are reviewed by various aspects. Specially we suggested specified criteria for the cost assessment of using ECTs. It is based on the scheduled construction cost and determined the rate $({\bullet}{\cdot})$ of using ECTs. To adapt ECTs into construction projects nationwide not only it is very important to certify better new technologies but also it is required to make the criteria of cost assessment for using ECTs.