• 제목/요약/키워드: IT in Construction

검색결과 21,564건 처리시간 0.044초

Intelligent management system for tunnel under construction using ITIS (Intelligent Tunnelling Information System)

  • Kim Changyong;Hong Sungwan;Bae Gyujin;Kim Kwangyeom
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.170-175
    • /
    • 2003
  • Ground and rock mass considered in tunnelling have characteristics such as uncertainty, heterogeneity and structural complexity because they have been formed undergoing various geological events for a long period. So, it is difficult for engineers to predict behaviors of rock mass in tunneling. In the paper the authors describe the development of an integrated expert system prototype for site investigation, design and construction in tunnelling and introduce the case applying this system to the tunnel construction site under construction. Geostructure Research Group in Korea Institute of Construction Technology (KICT) has developed the system during the past 4 years. The system mainly consists of several modules which is related to the design, construction and management of tunnelling. The test site, Neung-dong tunnel is located in Ulsan, Korea. The geology map shows it may confront big fault zone whose width is over kilometres. With the networking system of ITIS, various information of face mapping, monitoring and other construction task can be transmitted into the database and GIS Server at real time. And necessary analyses can be carried out with the modules equipped in the system.

  • PDF

Investigation of Field Construction and Economic Efficiency for Steel Plate-Concrete Structures with Application of Parking Building

  • Han, Kwon-Gyu;Park, Ho-Young;Han, Kyung-Bo;Choi, Byong-Jeong
    • 한국건축시공학회지
    • /
    • 제14권1호
    • /
    • pp.1-10
    • /
    • 2014
  • The SC structure can have relatively liberal sectional surfaces, and allows modularization for pre-forming in factories and structural stability. It can be used for the shear walls in the core of general buildings or the structural members for parking buildings. In the future, it could be applied to moving large bus terminals, and widely used for general industrial structures as it can expedite the process compared to other methods. This study examined the applicability of SC structures to the retaining walls of a parking building and reviewed its economic value by comparing its construction term, quality control benefits, and cost compared to RC structures. It was found that SC structures are about 1.6-1.7 times more expensive than RC structures in terms of the cost of fabrication and installation. However, the construction term can be reduced by 27% to save indirect costs for constructors, as well as the cost of removing molds and material loss required when installing RC structures.

Visual SLAM의 건설현장 실내 측위 활용성 분석 (Analysis of Applicability of Visual SLAM for Indoor Positioning in the Building Construction Site)

  • 김태진;박지원;이병민;배강민;윤세빈;김태훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.47-48
    • /
    • 2022
  • The positioning technology that measures the position of a person or object is a key technology to deal with the location of the real coordinate system or converge the real and virtual worlds, such as digital twins, augmented reality, virtual reality, and autonomous driving. In estimating the location of a person or object at an indoor construction site, there are restrictions that it is impossible to receive location information from the outside, the communication infrastructure is insufficient, and it is difficult to install additional devices. Therefore, this study tested the direct sparse odometry algorithm, one of the visual Simultaneous Localization and Mapping (vSLAM) that estimate the current location and surrounding map using only image information, at an indoor construction site and analyzed its applicability as an indoor positioning technology. As a result, it was found that it is possible to properly estimate the surrounding map and the current location even in the indoor construction site, which has relatively few feature points. The results of this study can be used as reference data for researchers related to indoor positioning technology for construction sites in the future.

  • PDF

WHAT IS THE VALUE AND IMPACT OF EARLY DISPUTE EVALUATION IN THE UK AND INTERNATIONALLY?

  • Francine Baker
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.350-356
    • /
    • 2011
  • Early neutral evaluation (ENE) is a fairly recent form of alternative dispute resolution procedure used in the construction industry. In the UK, ENE is usually carried out on an entirely without prejudice basis, however the parties may agree that any or part of it may be referred to at trial or any subsequent hearing. The early neutral evaluation consists of a preliminary assessment of the issues in dispute for use as a basis for negotiations which may result in a settlement of the dispute. An independent person is appointed by the parties who reviews the case and provides an opinion, in written form and in some detail, with reasons on the merits of the matters in dispute. The opinion is non-binding but provides the parties with what in the opinion of the independent person a formal tribunal may decide whether a court or an arbitrator, if the dispute is not resolved. However, ENE has yet to take off in the construction industry in the UK. This paper will explain this procedure and explore the use of it in the UK and internationally, considering the benefits and drawbacks of its use. It will consider whether or not it is more effective than other early resolution forms such as mediation and adjudication. It will argue and conclude that it is a very useful cost effective procedure, particularly in the resolution of complex disputes, whether local or international.

  • PDF

민간자체사업에서의 자생적 CM 적용사례와 CM 발전방향 - 동부금융센터 건설사업을 중심으로 - (The Study on a Developmental Direction of CM from Spontaneously Applied CM Case in a Private Construction Project -Mainly Related to the Construction of Dongbu Financial Center-)

  • 최영국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.31-40
    • /
    • 2004
  • 1996년 국내에 건설사업관리 제도가 도입된 이래 조속한 제도의 정착과 활성화가 필요한 실정이다. 특히 민간건설 분야에 있어서 CM의 적용은 건설산업제도의 변화와 선진화에 대한 기본적인 지표라고 볼 수 있다. 이는 공공건설의 경우 제도에 의한 CM적용이 가능하지만, 민간 건설의 경우 현실적이며 실질적인 필요성과 타당성에 대한 이해 없이는 성공적인 정착과 활성화를 기대하기 어려울 것이다 이에따라 동부금융센터 건설사업을 중심으로 국내 CM제도가 도입 되기 전부터 민간자체사업에서 CM의 필요성을 인식하고 자생적으로 건설사업에 CM을 적용한 사례를 고찰하여 그 과정에서 나타난 효과와 문제점을 검토함으로써 실질적인 CM의 발전방향을 제안하고자 한다.

  • PDF

A method for discrete event simulation and building information modelling integration using a game engine

  • Sandoval, Carlos A. Osorio;Tizani, Walid;Koch, Christian
    • Advances in Computational Design
    • /
    • 제3권4호
    • /
    • pp.405-418
    • /
    • 2018
  • Building Information Modelling (BIM) and Discrete Event Simulation (DES) are tools widely used in the context of the construction industry. While BIM is used to represent the physical and functional characteristics of a facility, DES models are used to represent its construction process. Integrating both is beneficial to those interested in the field of construction management since it has many potential applications. Game engines provide a human navigable 3D virtual environment in which the integrated BIM and DES models can be visualised and interacted with. This paper reports the experience obtained while developing a simulator prototype which integrates a BIM and a DES model of a single construction activity within a commercial game engine. The simulator prototype allows the user to visualise how the duration of the construction activity is affected by different input parameters interactively. It provides an environment to conduct DES studies using the user's own BIM models. This approach could increase the use of DES technologies in the context of construction management and engineering outside the research community. The presented work is the first step towards the development of a serious game for construction management education and was carried out to determine the suitable IT tools for its development.

An Algorithm for Scheduling Repetitive Projects with Resource Continuity and Different Batch Sizes

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권6호
    • /
    • pp.565-578
    • /
    • 2013
  • Batch production is common in repetitive construction projects, and it is not unusual for different batch sizes to be used by contractors in one project. While several scheduling methods, such as the Linear Scheduling Method (LSM) and the Repetitive Scheduling Method (RSM) have been proposed and used, no mathematical method for repetitive construction projects has been developed, and it is difficult to consider different batch sizes with the existing methods. An original mathematical algorithm for scheduling repetitive projects with different batch sizes is proposed in this study. This algorithm is illustrated with assumptions of resource continuity and single path in a project and introduces new terms, control batch and critical batch. The algorithm logics and mathematical equations are validated by comparison with the outcomes from a graphical scheduling approach through a simple and practical hypothetic project. As a result, it is expected that the proposed algorithm can be easily adapted and extended to computer software for scheduling, and can be a starting point for research on batch size management in repetitive construction projects.

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • 제15권3호
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

건설근로자의 연령별 재해 특성 (Accident Characteristics by Age Construction Workers)

  • 박종현;이찬식
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.111-118
    • /
    • 2009
  • As the construction project gets bigger in scale, the actual construction itself is becoming more complex. The construction accidents occupy 26.18 percent of total death disaster according to the accidents report in 2007. It is the highest figure among the entire industry, and it shows how serious the construction accident is. In order to reduce accidents occurred in the construction industry, we should find the accident characteristics of construction workers by age. In this study, we investigated 589 cases of fatal accidents, and classified them by trades, type of works, the things that caused the accident, how they occurred, and size. We then identified accident characteristics for each group by analysing them in accordance with workers age. The result of analysis showed that in carpenter and common laborer, the number of death accidents increased as the workers age increased. Another characteristics were that the number of death accidents increased as the age increased in finishing work and reinforced concrete construction and in a smaller-scale businesses, respectively. Common labor was the trade with the highest number of death accidents and the laborers of 50 age or higher in age in finishing working type were the most vulnerable to death accidents.

품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구 (A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction)

  • 박홍태;이양규
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.347-353
    • /
    • 2008
  • 일반적으로 건설공사의 품질을 확보하고 불필요한 공기지연을 사전에 예방하기 위해서는 각 공정의 내용을 정확하게 숙지하고 관리하는 일이 중요하다. 더욱 중요한 것은 공사계획에 따른 공정이 원활하게 진행될 수 있도록 각각의 공정에 필요한 사전작업들을 체계화하여 관리하는 것이다. 본 연구에서는 건설공사의 품질확보와 공기지연의 사전예방 등의 효과적인 공사진행을 위해서 아파트공사중 토목공사의 공종별로 필요한 사전작업을 일정별로 구분하여 확인, 검사, 승인 등을 체계적으로 할 수 있도록 하였다. 또한 건설공사 실무자들의 체험적인 방법을 통하여 공정표의 작업일정을 토대로 작업담당자별로 사전작업관리항목을 설정하여 제시하였다.