• 제목/요약/키워드: IT in Construction

검색결과 21,564건 처리시간 0.047초

공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구 (Productivity Improvement Method of Wall Rebar Work in Apartment House Construction)

  • 김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계 (Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site)

  • 이승원;엄익철;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제14권1호
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

적정공사비 산정을 위한 공사비할증기준 분석 (Analysis of Construction Cost Weight Standards to Calculate Appropriate Construction Costs)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.157-158
    • /
    • 2020
  • In order to calculate construction costs properly, it is necessary to add the weight that reflects different worksite conditions. The implementation of the weight, however, is difficult because it is impossible to determine whether wight should be added in basic work or whether weight values are overlapped. Special worksite conditions further complicate the matter. Furthermore, overlapping implementation of weight values result in overestimation of construction costs. The current study clearly analyzed the weight value items in the current construction cost calculation standards, and analyzed the weight value items included under the basic productivity category to propose an improvement of weight standards. Basically, the estimating standards provide 140 weight value items, with different levels of weight given to each item. Among 1,333 items in the estimating standards, 140 include weight values. Some items have two types of weight values.

  • PDF

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

돌관공사 시나리오 기반 공정관리 최적화 방안 (Process Optimization Method Based on Emergency Construction Work Scenario)

  • 이시현;이승학;우미선;손재호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축 (Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach)

  • 고용호;박민하;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

사례기반 건설안전 관리시스템의 추론 모형 (Reasoning Model of the Case-Based Construction Safety Management System)

  • 예태곤;이재용;이현수
    • 한국안전학회지
    • /
    • 제14권1호
    • /
    • pp.167-176
    • /
    • 1999
  • Construction accidents occur reiteratively in similar fashions. There have been several attempts to develop a safety program for preventing construction accidents on sites. It will be very effective to use previous accident cases for establishing proper safety plan and managing safety process. This research develops a case-based construction safety management system which enables construction managers or safety managers to prevent potential accidents during the construction process. The case-oriented approach is performed through the representation of previous accident cases in accordant with the similarity to the conditions of current site. It uses a case-based reasoning which is one of the reasoning methods of an expert system. A prototype system for the reasoning model was implemented using one of the case based system development tools. The system was applied to a real construction site to verify its capability and validity. It was founded that the causes of accidents were successfully removed, so the proposed model proved to be reasonable. Additional research is needed to resolve the technical problem how to adapt the countermeasures for accident prevention provided by the reasoning model.

  • PDF

교각 기둥시공을 위한 매니퓰레이터 엔드 이펙터 설계 (Design of Manipulator End Effectors for Pier Column Construction)

  • 정태일;이상원;이상윤;유지환
    • 로봇학회논문지
    • /
    • 제16권3호
    • /
    • pp.207-215
    • /
    • 2021
  • There is a risk of serious injury to workers who work at height in pier construction process. By using auto climbing formwork system that does not need to dismantle and reinstall formworks, it is possible to improve work efficiency and safety of workers. However, auto climbing formwork system still requires workers to work on a pier for rebar connection works and so on. In order to eliminate works by workers on the pier, robot manipulators with special end effectors are proposed. Through analysis of works on the pier, three specialized end effectors which are a gripper, a rebar coupler press, and a concrete vibrator, are suggested. Also, new pier construction scenario by the suggested system is confirmed using 3d modeling. It is expected that the proposed system and method enables pier construction without workers on piers. It will increase safety and efficiency of pier construction.

The research about RTPM system construction that apply use case modeling methodology

  • Eun Young-Ahn;Kyung Hwan-Kim;Jae Jun-Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.464-471
    • /
    • 2009
  • Robot and application of IT skill of construction industry are slow comparatively than another thing industry by the feature. This research proposes progress management and real time information gathering through construction automation and RFID focused on steel structure construction. Building for RTPM system, must consider various variables and surrounding situation in construction field and it is the most important and difficult matter that draw right requirement and grasp relation between this requirements to accomplish one suitable task considering these environment. Therefore, in this study analyzes requirement and target for RTPM system based on scenario that is easy to draw requirement and apply this to use case model. Presented method suggests that represent relation between goals and way that refines goal systematically from requirement of RTPM system. And it could express for visualization through the Way that attaches nonfunctional elements of system with system internal goal.

  • PDF

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF