PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Technical Elements for a Competitive Remodeling Construction (경쟁력 있는 리모델링 공사에 대한 기술적 요소)

  • Chun, Ui-Yeon;Kim, Gyu-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.157-158
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

An Analysis of Domestic Education Programs for Training International Construction Experts and Suggestions to Improve It (해외건설 전문인력 양성을 위한 국내 교육 프로그램의 현황 및 개선방향)

  • Seo, Hee-Chang;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.167-170
    • /
    • 2009
  • Currently, unlike domestic market It is trend that world construction market scale is increasing continuously but Experts who need in International Construction Market are insufficient absolutely. Despite the amount of orders received continuously increased, Experts who needed for overseas construction market are lacking. And we need to examine that Experts who needed for overseas construction market an supplied to the country. It is time to make decision how can we supply them to the country. Consequently, this project will study Educational programs of the past for Training International Construction Experts, provide the solutions breeding International Construction Experts.

  • PDF

A Comparative Study on Spatial Characteristics of Parcel by Type of Building Construction (건축행위 유형별 필지의 공간적 특성 비교연구)

  • Kim, Kijung;Kim, Dongjun;Lee, Seungil
    • Journal of Korea Planning Association
    • /
    • v.54 no.6
    • /
    • pp.27-42
    • /
    • 2019
  • The purpose of this study is to identify the spatial characteristics of the parcels in which building construction occurred. In recent, urban development patterns in Korea have been shifting from the past. Small-scale development at parcel level is becoming more important in accordance with individual location needs in the low-growth era unlike public lead large-scale urban development in the rapid growth period. Therefore, it is necessary to study the spatial characteristics of the parcels where small-scale development takes place for future urban development management. This study used the chi square independence test, t-test and ANOVA (analysis of variance) to identify the spatial characteristics. The results of the study show that there is a spatial characteristics difference not only between building construction and non-building construction parcels, but also by type of building construction. The parcel where the building construction occurred have a higher proportion in detached house, major commercial districts, district unit planning areas, and commercial areas. In addition, it is caused by parcels, which are large scale and economically valuable, and are influenced by traffic factors such as urban centers and subway accessibility. As a result of each type of building construction, the parcels where the building use change occurred have spatial characteristic difference compared to other building construction, while the spatial characteristics are similar between the new construction/extension and new construction/extension with change of use. Based on this results, it will be possible to identify areas with high demand for small-scale development in the future and to utilize them for planning management of urban development. Furthermore, it will be possible to manage development demand by type of building construction, and to prepare differentiated plans considering the appropriateness of development plan, availability of infrastructure, and harmony with surrounding environment.

Analysis of optimized survey methods for tunnel construction using IT (터널 정보화 시공을 위한 계측 최적방안 분석)

  • Choi, Won-Il;Cho, Kook-Hwan;Park, Sung-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.941-946
    • /
    • 2008
  • D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.

  • PDF

Development of Algorithm for Measuring Performance Rate of Construction Equipment using a Multipurpose Composite Sensor (다목적 복합 센서를 이용한 건설 장비 성과율 측정 알고리즘 개발)

  • Kwon, Jae-bum;Kim, Chun-Hak;Kim, Chang-Won;Cho, Dae-Gu;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.9-10
    • /
    • 2012
  • Efficient operation of construction equipment has become more and more important in the competitive construction environment. Accurate measurement of performance rate of construction equipment is a critical factor for a construction project planning. However, it might be quite difficult to measure the performance rate due to diverse practical limitations such as continuously variable performance rate of construction equipment, considerable indirect cost, large construction field, and so on. Therefore, the purpose of this paper is to propose an automatic algorithm that measures a performance rate of construction equipment with a multipurpose composite sensor. It is expected that the algorithm compiles database on construction equipment and in advance, facilitates efficient operation of construction equipment.

  • PDF

A Study on the Establishment of IT Service Model for the Possibility of Application in Construction Field - Focused on the building facility - (건설분야에 적용가능한 IT 서비스 모델 구축방안 연구 - 빌딩시설물을 대상으로 -)

  • Lee, Woo-Sik;Hong, Chang-Hee
    • Spatial Information Research
    • /
    • v.19 no.6
    • /
    • pp.123-131
    • /
    • 2011
  • The object of this study is to build service model that combines developing IT technology with construction filed. It combines existing traditional construction project with high-tech IT choosingly, diverting construction project from labour-intensive to value-added technology-intensive industry. By doing so, it plans improving productivity and creation of new market. Now most ideal field of combining construction with IT technology is U-City industry that is being emphasized recently. Therefore, For this study, We analyze present condition of several IT technology used in construction and U-City project. Also, determining priority of promising IT technology for requirement analysis of consumer. And it proposes plan for construction of U-City service model through prospect and environment analysis of U-City and IT industry.

A Basic Study on Quantification Risk Model of Human Accidents on Exterior Construction Site in South Korea (국내 건설현장 내·외부 인명사고 리스크 정량화 모델 개발 기초연구)

  • Oh, Jun-Seok;Ha, Sun-Geun;Kim, Tae-Hee;Jeon, Sang-Sub;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.132-133
    • /
    • 2018
  • Many studies regarding construction safety management have been conducted. However, it is insufficient to research on external construction site. As a result, ordinary people around the construction site have injured and have a negative view when they think construction industrial since it has regarded having an overfull industrial accidents on media. To break the stereotype and prevention of accident on construction industry have been emphasized at this point in time, it is necessary to establish a comprehensive safety management system which is considered not only internal safety management but also external safety management. Therefore, the objective of this study is to develop the human accident risk quantification model by utilizing the third party payout data which occurred by incomplete safety management on external construction site. This study is conducted as a basic study for developing safety management manuals on internal·external construct site. In the future, it is expected to be used as a reference.

  • PDF

Site mitigation plan for Different types of Construction noises (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.490-494
    • /
    • 2014
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is almost noise from construction site is high level and some kinds of noise levels are over 100dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans are developed to reduce different types of construction noises and it is applied in site and evaluated noise reduction performance in this study.

  • PDF

Materials management using RFID in the apartment construction (RFID를 활용한 공동주택 건설공사 자재관리 방안 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF