A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

Key success factors for implementing modular integrated construction projects - A literature mining approach

  • Wuni, Ibrahim Yahaya;Shen, Geoffrey Qiping
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.343-352
    • /
    • 2020
  • Modular integrated construction (MiC) is an innovative construction method where components of a building are manufactured in an offsite factory, trucked to the job site in sections, set in place with cranes, and assembled together to form a whole building. Where circumstances merit, favorable conditions exist and implemented effectively; MiC improves project performance. However, several key factors need to converge during implementation to realize the full benefits of MiC. Thus, a thorough understanding of the factors which are critical to the success of MiC projects is imperative. Drawing on a systematic review of 47 empirical studies, this research identified 25 key success factors (KSFs) for MiC projects. Of these, the five topmost cited KSFs for MiC projects include effective working collaboration and communication among project participants; standardization, optimization, automation and benchmarking of best practices; effective supply chain management; early design freeze and completion; and efficient procurement method and contracting. The study further proposed a conceptual model of the KSFs, highlighting the interdependences of people, processes, and technology-related KSFs for the effective accomplishment of MiC projects. The set of KSFs is practically relevant as they constitute a checklist of items for management to address and deal with during the planning and execution of MiC projects. They also provide a useful basis for future empirical studies tailored towards measuring the performance and success of MiC projects. MiC project participants and stakeholders will find this research useful in reducing failure risks and achieving more desired performance outcomes. One potential impact of the study is that it may inform, guide, and improve the successful implementation of MiC projects in the construction industry. However, the rigor of the analysis and relative importance ranking of the KSFs were limited due to the absence of data.

  • PDF

Factors Affecting the Performance of National Human Resource Development Projects: Focusing Energy HRD Projects (국가 인력양성사업 성과에 영향을 미치는 요인 분석: 에너지인력양성사업을 대상으로)

  • Hong, Seong-Min;Son, Kyoung-Hyun;Chang, Sun-Mi
    • Journal of Technology Innovation
    • /
    • v.25 no.4
    • /
    • pp.263-284
    • /
    • 2017
  • The purpose of this research is to analyze the performance of national R&D projects and to find out measures to improve the performance indicators, focusing on energy HRD projects. The main analysis target is 86 energy manpower projects supported since 2010. The performance indicators of the energy HRD projects are related to the research capacity, the number of emission workers, industry-university linkage, job creation and so on, and analyzed by using the 11 indicators of human resource performance index called KPI index. As a result of analyzing the attainment level of the proposed target by task, the index with the highest achievement level is the corporation linkage rate, and the index with the lowest achievement level is the participating company employment. As a result of examining the effects of job creation in company - linked activities, it was found that the greater the number of participating companies in the business, the greater the employment creation effect of the number of internships. As a result of the above analysis, the following policy alternatives are proposed. First, it is necessary to consider adding indicators that can express the quality performance of the business and performance indicators that can express actual business linkages. Second, it is necessary to strengthen the management of differentiated performance indicators according to policy performance targets and major target groups. Third, it is necessary to improve information input and accumulation system along with improvement of performance index.

A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City (스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로)

  • Sang-Ho Lee;Hee-Yeon Jo;Yun-Hong Min
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2023
  • Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.

Development of Policies and Business Models of Utilizing Idle Farmlands (유휴농지 활용을 위한 정책사업 모델개발)

  • Kim, Kyoung-Chan;Park, Chang-Won;Cho, Seok-Ho;Jeon, Young-Mi;Koo, Seung-Mo
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.1
    • /
    • pp.91-104
    • /
    • 2014
  • Self-sufficiency rate of food in South Korea is almost at the lowest level among OECD countries, and the decrease tend of farmland is expected to be continued. In this situation, Korea experienced a rapid change in the international price of grain due to changes in amount of grain production and food weaponization. It also started to reinforce the appropriateness of maintenance of farmland above certain standard. As one of policy means for this situation, this study selected "the use of idle farmland" as a subject, and started to consider the way to suggest the policy projects using idle farmland. The result of this study is summarized as follows. Firstly, this study defined the meaning of idle farmland, and set up the scope of idle farmland needed to this study. Secondly, this study analyzed the domestic major policy projects with prevention function of idle farmland as well as the policy projects related to idle farmland. It also investigated "recycling measures of idle farmland" that is recently promoted in Japan, and deducted the direction for developing a new model. Lastly, It suggested 9 policy project models that are finally able to use idle farmland. Suggested models are designed to access from various directions. This study suggested contents, entity, target and characteristics of projects in order to set up proper directions in promoting policy projects using idle farmland.

'Probable Errors' as an EIA Method to Define Project Impact Area - Focusing on the Preparation of 'Howitzer' Fire Training Site - (공산오차를 적용한 환경영향평가 대상지역 설정 기준에 관한 연구 - 곡사화기 사격장 조성사업을 중심으로 -)

  • Kang, Jaegu;Choi, Joon-Gyu;Cho, Kong-Jang;Joo, Yong-Joon;Han, Myung-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.6
    • /
    • pp.495-502
    • /
    • 2007
  • In Korea, military authorities have neglected to consider impacts of military projects on local communities and natural environment. Moreover, local communities have had difficulties in dealing with the Ministry of National Defense (MND), which was stubborn enough not to implement environmental assessment on their projects. In this situation, recent case, "EIA of Baekgol Division's Howitzer Fire Training Site" in the Supreme Court-in which judges upheld the Higher Court's decision that the division violated the Environmental Impact Assessment law by ignoring to implement EIA-reveals that military projects can no longer forgo environmental assessment. The decision has serious ramifications on the future of Environmental Impact Assessment in military-led projects. This paper examines the proper scope of EIA in military-led projects and, more specifically, fire training site and searches for how to improve it through 'probable error,' a military training method that is applied to real 'howitzer' fire training. Probable error of the artillery field manual is nothing more than an error that exceeded as often as it is not exceeded and its scientific method was demonstrated through real fire tests in the US. Army. If it is applied to improve assessment methods about the proper scope of EIA in military 'howitzer' fire training site, 'probable error' will improve effect prediction, mitigation and reliability.

A Study on the Process Improvement of ICT Technological Innovation System : with the Focus on Classification and Assessment of R&D Projects (ICT 기술혁신체계 프로세스 개선방안 연구 : 과제구분 및 선정평가를 중심으로)

  • Rim, Myung Hwan;Koh, Soon Ju;Lee, Jung Mann
    • Korean Management Science Review
    • /
    • v.33 no.3
    • /
    • pp.53-64
    • /
    • 2016
  • The government is mapping out R&D innovation measures aimed at improving the qualitative level of the performance of national R&D projects that are supported by grants or public funds. This paper proposes ways of making improvements in technology planning, project assessment, performance management, and results evaluation in order to boost the efficiency of the country's promotion of ICT R&D projects, as well as to upgrade the processes involved with its technological innovation system at each of the commercialization stages of its R&D projects. According to our experts' in-depth survey and interview, it has been found that technology planning is the most important phase in the full cycle-based technological innovation system and that the promotion of a combination of top-down and bottom-up approaches is the most reasonable. This paper also suggests it is necessary to secure a process for exploring technological opportunities as the preparatory phase for technology planning, and that it is desirable to reflect the technology demand map associated with the technology road map. Currently, R&D projects are divided into policy designation, designation contest, and free contest. To minimize the inefficiency associated with indiscriminate competition, this paper proposes the introduction of a general contest system in order to change the project assessment system into one based on the results of the competition in each category(e.g. firms, universities, research institutions, etc.).

Application of Selective Construction Management Services to Private Small-Medium Construction Projects (${\cdot}$ 소규모 건축공사의 선택적 건설사업관리 적용 방안)

  • Kim, Seong-Hwan;Mun, Kyung-Jick;Woo, Yu-Mi;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.305-309
    • /
    • 2006
  • Construction management system has been needed to be anchored and revitalize in these days, since it was entered into a domestic market. We could consider application of CM services as a challenge of construction project system and a way to get to an advanced nation in construction field. Application of CM services could be possible in public projects by a regime. However, in case of private construction projects, it is hard to apply it without understanding of substantial necessity and propriety. so in this study, we find a application method of CM services to private small-midium construction projects, and make CM services item table of CM services for revitalization by examining the cases that applied to in private small-medium construction projects.

  • PDF

The Effects of Traditional Market Support Projects and Competition Intensity of Stores on Store Sales and Number of Visitors (전통시장 지원사업과 경쟁 강도가 점포매출액과 방문고객 수에 미치는 영향)

  • Lee, Chul-Sung
    • Journal of Distribution Science
    • /
    • v.17 no.3
    • /
    • pp.97-105
    • /
    • 2019
  • Purpose - The purpose of this study is to investigate the effect of the government support project on traditional market and the interaction effect between the government support project and the competition intensity. Therefore, this study focuses on the competition intensity of individual stores in traditional markets, unlike the traditional research flow, which is beyond the competitive structure of traditional markets and large retailers. Research design, data, and methodology - This study is based on the data of 'Statistics of Traditional Market in 2017'. In this study, a multiple regression equation was constructed using the number of government support projects as an independent variable, competition intensity as an interaction, and sales per store, number of customers per store as a dependent variable for analysis. A multiple regression equation was constructed for the main effect analysis. To investigate the effect of the interaction, cohen(1980)'s regression equation and two-way ANOVA were used. Results - First, according to this study, the traditional market participated in the government support project showed that the sales and the number of visitors per store in the traditional market were higher than those in the non-participation market. Second, the impact of government support projects on sales per store(also number of visiting customers per store) can be different depending on the competition intensity. More specifically, if the market is politically supported by a market with a high level of competition, it may be more effective than the market with no support. Conclusions - Based on the results of the study, we suggested academic and practical implications and suggested that competition intensity of stores in the traditional market should be considered in the future. The implications of this study are as follows. First, the effects of the government's traditional market support project were analyzed empirically. Second, this study is different from the previous studies in that it examined the competitive strengths and the effects of individual stores in traditional markets, away from competition between traditional market and large retailers. Third, it provided practical implications for the operation of government support projects.

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.