• Title/Summary/Keyword: IT Projects

Search Result 4,926, Processing Time 0.038 seconds

Evaluation of Japan's Official Development Assistance (ODA) Projects on Flood Risk Management in Thailand

  • Jung, Minjung;Lee, Seungho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.210-210
    • /
    • 2022
  • This study evaluates Japan's Official Development Assistance (ODA) projects in Thailand from 2011 to 2013 by deploying the Sendai Framework for Disaster Risk Reduction (SFDRR) and the Organization for Economic Cooperation Development (OECD) evaluation criteria. Special attention is placed on disaster-related development assistance activities of Japan through reviewing long-term impacts of the projects. The Japan International Cooperation Agency (JICA) has played a crucial role in transferring Japan's experiences on disaster risk management to developing countries, including Thailand. The study highlights two flood risk management projects in Thailand with the support of JICA after the 2011 floods, namely the Project for the Comprehensive Flood Management Plan for the Chao Phraya River Basin and the Project for Flood Countermeasures for Thailand Agriculture Sector. The case studies demonstrate that the projects were efficiently and effectively conducted for meeting Thailand's needs and requirements. JICA provided multi-hazards risk analysis through scientific data as well as local knowledge. However, achievements of the project did not last for long because of a lack of Thai stakeholders' commitment and JICA's post-project management. It is concluded that a development agency should consider impacts and sustainability of flood risk management projects more carefully from the stage of planning, and the practical application of the knowledge, and technologies should also be monitored progressively after the completion of the project.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

LESSONS LEARNT IN THE IMPLEMENTATION OF DEVELOPMENT PROJECTS IN SOUTH AFRICA

  • Wellington Didibhuku Thwala
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.364-367
    • /
    • 2011
  • The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.

  • PDF

A Study on the Advancement of IT project Order System in Public sector - Focused on the SW partitioning order institution - (공공부문 IT프로젝트 발주시스템 선진화에 관한 연구 - SW분할발주 제도를 중심으로-)

  • Lee, Myung-Hee;Lee, Jae-Du
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2017.04a
    • /
    • pp.595-597
    • /
    • 2017
  • Despite rapid growth of the global SW market, the Korean market still has a long way to go to impact global power nations. What is the reason that holds back of the No. 1 high-speed Internet country in terms of SW development? It is lack of the foundation for development of the Korean SW industry. In this context, the Korean government declared SW-oriented society and developed polices for each sector; Regarding movement that tries to apply the SW partitioning order institution in public sector to IT projects, this research aims to study SI project problems expected when conducting the SW partitioning order institution and improvements focusing on the public sector that accounts for about 30% of the entire SW industry. SW partitioning order institution is divided into planning-design and development-realization stages, which may cause problems when it is applied to SI projects. As such, the study analyzed SI projects and separate and partitioning order, exemplary cases and examples of industrial projects related to partitioning order, and drew improvement measures from institutional, technological and managerial viewpoints. The research aims to help people involved in IT projects sell SW at proper prices and improve the environment, and presents directions to create a system that strengthens competitiveness of the SW industry and SI projects by providing solutions to problems that suppliers and demanders should recognize before implementing the SW partitioning order institution.

A Performance Evaluation of Governmental Funding Projects for IT Small and Medium-Sized Enterprises and Venture Business Using DEA/AR-I (DEA/AR-I을 활용한 IT 중소.벤처기업 정부자금지원정책 성과평가)

  • Park, Sung-Min;Kim, Heon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.32 no.12B
    • /
    • pp.815-825
    • /
    • 2007
  • It is necessary to establish a systematic framework where the performance of governmental funding projects can be evaluated just-in-time as well as objectively regarding IT small and medium-sized enterprises and venture business. In this study, a framework is proposed for the performance evaluation using Data Envelopment Analysis (DEA) and a case study is illustrated with an empirical dataset. Especially, in order to enhance the reliability of optimal solutions, a DEA/AR-I revised model is developed by adding Acceptance Region (AR) Type I constraints into the DEA basic model. Based on the procedure and the models, it is considered that an 'efficiency score' can be calculated as a guideline for conducting successive performance evaluation processes fast. As for major governmental funding projects with respect to 'IT SMERP 2010 Plan', performance evaluations are discussed concerning between projects as well as between corporate entities within each project.

Estimating software development cost using machine-learning approach (학습이론을 이용한 소프트웨어 개발비 예측 모형)

  • Park, Chan-Kyoo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.345-355
    • /
    • 2005
  • As the portion of information systems(IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for quantitative and efficient management of IS budget. The primary concern in the cost estimation of IS projects is to estimate software development cost. In this paper, we propose a new method to estimate software cost using support vector regression(SVR), which has attracted considerable attention because of its good performance and theoretical clearness. The paper is the first study which apply SVR to software cost estimation.

  • PDF

Related to Supporting Art Therapy for Children and Youth in Korea Survey of State Projects (국내 아동·청소년 대상 미술치료 지원 관련 국가사업 실태 조사)

  • Ahn, Yi-jeong;Chung, Yeo-Ju;Kim, Seo-Young;Jang, Jeong-Ja
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.11
    • /
    • pp.314-322
    • /
    • 2020
  • The purpose of this study is to investigate the state projects related to psychological sentiment for child and youth in Korea, examine the current status of art treatment-related projects for child and youth, and seek ways to improve them, focusing on projects supported by the Ministry of Health and Welfare, the Ministry of Gender Equality and Family, and the Ministry of Culture, Sports and Tourism. The results examined through this study were firstly, mental health promotion projects conducted in the public sector in Korea are mainly carried out on consignment to affiliated organizations, and are promoted not only for diagnosis, mediation, and therapeutic intervention but also for care and prevention. Second, psychological and emotional support projects are being attempted with various approaches such as reading, playing, gardening, and art, and art therapy is actively used as a part of art programs. In addition, it is suggested that the government should provide efficient welfare and utilize it as a common goal through linkage and cooperation with other ministries for the continuous and stable implementation of state-led psychological support projects. In addition, it is hoped that this research will be used as a research material to explore specific strategies for effectiveness of national policy projects on the overall psychological sentiment of child and youth.

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

A Study on Strategies for Local Development Projects by Types of Regional Cities (지방 도시 규모별 지역개발사업 추진방안 연구)

  • Bae, Min-Cheul;Ahn, Jung-Geun;Ahn, Woo-Sung
    • Journal of the Korean Regional Science Association
    • /
    • v.39 no.2
    • /
    • pp.3-18
    • /
    • 2023
  • The aim of this study is to analyze problems with regional development projects by examining their actual conditions and to propose measures to promote such projects based on the size of local cities. To achieve this goal, problems associated with regional development projects were analyzed, and measures for their promotion were derived by dividing these projects into planning, strategy, policy, and institutional sectors according to the size of local cities. The problems identified with regional development projects include diversification leading to similar and overlapping projects, lack of participation by local experts, top-down government structure for designating and supporting regional development projects, and insufficient budget. In order to address these issues, local experts have suggested differential measures based on the size of local cities. Specifically, in the planning sector, it was proposed that economic, cultural, social, and welfare functions be expanded and reorganized primarily around small and medium-sized cities, and that long-term strategies be established for regional large cities through various partnerships and step-by-step procedures. In the policy sector, it was suggested that the implementation of bottom-up development under the leadership of local governments should be focused on small and medium-sized cities, and that the transition from a specific industry-oriented policy to a corporate growth policy needs to be established around large cities. Finally, in the institutional sector, it was recommended that a performance evaluation system for the use of financial resources and a system for expanding financial resources should be established primarily in small and medium-sized cities.

A Study on a Basic Model for GIS Audit, Based on Various Types of GIS Projects (GIS 사업유형을 고려한 GIS 감리의 기반 모델 연구)

  • Koh, Kwang-Chul;Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.2 no.2 s.4
    • /
    • pp.5-23
    • /
    • 2000
  • Since 1995, national and local governments have competitively initiated many and large GIS projects and audit for the projects becomes an important issue. So far, the audit in the Information Technology(IT) area has tried to deal with the issue but ineffectiveness has been found for the successful GIS project management. Effective auditing is a critical element for the project management. In order to establish a proper audit model for the GIS projects and to promote auditing activities in the projects, this study constructs two hypotheses and tries to prove them. The hypotheses are as follows : 1) For a good audits model for GIS, unique characteristics of a GIS project audit items and the scope of the audit need to be identified. 2) The scope of audit needs to be classified according to the requests from tasks in the projects. To prove the hypotheses, this study analyzes positive aspects of audit in IT and construction projects, clarifies the audit items in GIS projects by comparing with them, and classifies the scope of the GIS audit based on various types of GIS projects. As a results, 5 types of the GIS audit are identified : (1) audit for project management, (2) audit focused on IT, (3) audit characterized by GIS technologies, (4) GIS database audit and (5) consulting services for critical problems in the projects. In addition, 4 criteria in classifying the GIS projects are suggested for the GIS audit. The 4 criteria are domain, scope, duration, and GIS applications technologies. Especially, GIS technology considered in this study includes GIS software, methodologies for GIS development, GIS database and quality control of GIS data, which are not usually reflected in the existing studies about in GIS audit. Because the GIS audit depends on a type of GIS projects, scopes of the audit can be flexibly reconstructed in accordance with the types of GIS projects. This is a key to effective and realistic audit for the future GIS projects. Strategies for effective GIS audit are also proposed in terms of the following: GIS project management, goal establishment in each audit stage, documentation from GIS audit, timing strategies for intensive GIS audit, and designing team structure.

  • PDF