HWANG, Dong Hwan;OH, Cheol;PARK, Hyun Jin;JEONG, Bong Jo
Journal of Korean Society of Transportation
/
v.34
no.3
/
pp.263-277
/
2016
Traffic safety in freeway work zones is of keen interest since both crash frequency and severity are much higher than those in general freeway sections. The lane closure in work zones results in greater work load of drivers due to compulsory lane changes and speed reduction. Therefore, traffic merging control is an effective countermeasure for enhancing work zone safety. This study proposed an integrated framework based on driving and traffic simulations to evaluate traffic merging control methods in terms of traffic safety. In addition to the conventional merging method using the taper, joint merge and chicane-type merge were evaluated by the proposed methodology. Chicane-type merge outperformed other methods under level of service (LOS) A and B. On the other hand, it was identified that joint merge showed the best safety performance under LOS C traffic conditions.
This paper is concerned with air traffic controllers' fatigue and stress that they experience during their daily job particularly as being shift workers. Previous researches reveal that the controllers' fatigue and stress increase by several factors including time spent at work, traffic intensity, visibility, etc. The researches also indicate that air traffic controllers' fatigue and stress can be reasonably surrogated by their heart rate. We set three hypotheses relating the influencing factors and the fatigue and stress represented by the heart rates. Using wrist bands, air traffic controllers' heart rates at various situations are collected at Choongju airport. The hypothetical tests explicitly confirm that the heart rate is highly correlated with the traffic level and the time spent at work. In particular, it be shown that even when handling the same traffic level, air traffic controllers' stress level increases as the time they spent at work increases.
In this paper, we classified a flight pattern of unmanned aerial vehicle(UAV) which will be operating in UTM system and analyzed its flight pattern by purpose of use. Flight patterns of UAV are sorted into three patterns which are circling, monitoring and delivery. We considered four cases of industry areas using UAV which are agriculture, infrastructure monitoring, public safety & security(p.s.s) and delivery. It is necessary to build a simulation model as a verification tool for applying the flight pattern according to the use of UAV to the real UTM system. Therefore, we propose the simulation model of UAV with updating states over time. We applied simulation to UAV monitoring flight pattern, and confirmed that the flight was done by the given input data. The simulation model will be used in the future to verify that the UAV has various flight patterns and can operate safely and efficiently for the intended use.
This study uses Conjoint Analysis to study optimal port operations at the newly built International P assenger Terminal (IPT) at Inchon Port, Korea. The perceptions of users, operators, and the Incheon Port Authority are compared and analyzed. The results of user Conjoint Analysis showed that rent calculation method was the most important factor in the NIPT operation plan, followed by establishing automation and the size of the site area. For the Incheon Port Authority and operators, the rent calculation method turned out to be the most important factor for NIPT operation plans. It was followed by establishing automation and the site area. Utility results showed the "investment cost preservation method" to have the highest rent calculation utility, "yard automation" as the priority, and "43,000 pyeong-48,000 pyeong" as the optimal site area.
The scope of e-Commerce process becomes wider as the emphasis on the enterprise collaboration grows. It has expanded from its initial settings of order management or billing processes to cover various collaborative processes in the company's value-chain. In order for those collaborative e-Commerce processes to be successful, corresponding business processes should be fully supported by standard bodies. The RosettaNet consortium, one of the most representative international B2B standard bodies, has steadily provided new PIPs to support those expansions. Since individual RosettaNet PIPs correspond to unit tasks that are executed separately in or between companies, multiple PIPs have to be integrally used to properly handle larger business cases. RosettaNet implementation, however, has suffered from the lack of standard guidelines or deliverables to refer under this multi-PIP environment. In this research, a contents-based document routing system is implemented. By applying this routing system to the RosettaNet e-Logistics program where multi-PIP environment is inevitable, we verified our contents-based document routing system is effective to support multi-PIP environment flexibly.
The Port Logistics Information System (Port-MIS) is the system that processes all of port management such as entry and departure of ships, using facilities within ports, port traffic control, cargo entering and carrying and tax collection in 31 trade ports over the whole country. Lately, The Port Logistics Information System (Port-MIS) has been reformed as a WEB-based system and established basis to provide real time information support structure, diversification of civil complaint system, and optimized civil complaint service by using wire and wireless internet. The typical study on the Port Logistics Information System was C/S program and EDI-centered. But it has significance to study on service quality measurement of WEB Port-MIS that has been served as a new web-based platform since April 2010, for there was no such a study until now.
Russia has access to unique port locations and routes, one of them is North Sea route, which have been a major debate topic for last several decades. In order to handle any shipments along the route, an adequate and capable port system must be present. This study aims to identify development and competition patterns from 2007 to 2016 of Russian ports in the Arctic basin, concentration trends in particular. The objectives achieved through utilizing the Herfindahl-Hirschman Index (HHI), concentration ratio (CR), the Gini coefficient and Lorenz curve, and shift-share analysis. Results demonstrate concentration trend, positive overall growth and lack of real competition. Originality of this study lies in the fact that certain analysis had not been done in previous studies, but importance of it may be found in several papers. Findings of this paper may assist policy-makers, port authorities and other researchers in understanding and further study on the region.
Korean Journal of Construction Engineering and Management
/
v.12
no.5
/
pp.46-54
/
2011
There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.
Transactions of the Korean Society of Mechanical Engineers A
/
v.34
no.6
/
pp.781-787
/
2010
Forecasting possible failure characteristics is very important in maintenance planning because it helps in predicting any future failures and determining the optimum replacement interval. This paper examines the time.to-failure distribution of the transfer gearbox of a J79 engine by using a probability plotting technique which is one of the most convenient techniques for reliability analysis. Various probability distributions are evaluated for determining the suitable probability distribution of the failure data of the transfer gearbox, and the resulting correlation coefficient indicates that failure data have a lognormal distribution. The expected number of unscheduled maintenance actions and the optimum replacement interval for various values of cost ratios are determined.
YOUN, Seok Min;PARK, Hyun Jin;OH, Cheol;CHUNG, Bong Jo
Journal of Korean Society of Transportation
/
v.35
no.4
/
pp.278-291
/
2017
Effective installation and operations of traffic safety signs in the advance warning area is of considerable interest for safer traffic management at freeway work zones. This study evaluated the feasibility of traffic safety sign installation based on a driving simulation experiment to take drivers' responsive characteristics into consideration. Both the compliance rate for speed limit and a lane-changing safety index were used for evaluating a set of driving simulation scenarios. It was identified that providing speed limit signs to reduce speed in advance and afterward guiding lane-changing could lead to safer maneuvering of vehicles entering work zones. The outcomes of this study are expected to be useful for revising freeway work zone management policies toward crash prevention.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.