• Title/Summary/Keyword: IT 프로젝트 성과

Search Result 1,255, Processing Time 0.031 seconds

Use case modeling with agile practices for Enterprise (애자일 기법을 접목한 대형 프로젝트 기반 유스케이스 모델링)

  • Nam, Dong-Kyun;Lee, Jong-Wang;Han, Jeong-Heon
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.459-462
    • /
    • 2009
  • 많은 SI프로젝트에서 유스케이스 모델링 기법을 사용하여 요구 분석을 수행하여 왔지만 모델링 기준과 가이드의 상이함으로 인해 프로젝트 현장에서 많은 문제점을 야기하고 있다. 본 논문에서는 애자일 방법론의 장점을 접목하여 애자일한 유스케이스 시나리오 작성법 및 사용자스토리를 개념을 차용한 두 단계 우선순위 부여를 통하여 요구 분석의 효율성과 생산성 제고방안을 제안한다.

  • PDF

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Factors Affecting the Performance of Agricultural Project from the Perspectives of Agriculture Extension Workers - A Case Study of Malawi - (농촌지도사의 관점에서 본 농촌개발 성과 영향요인 - 말라위 사례 -)

  • Tuchitechi, Hawonga;Lee, Misook
    • Journal of Agricultural Extension & Community Development
    • /
    • v.25 no.2
    • /
    • pp.111-120
    • /
    • 2018
  • This study aims to identify the factors influencing the perofrmance of agricultural projects for small farmers in Malawi. This cross-sectional study was conducted to discover the factors behind the slow performance of agricultural projects in alleviating poverty. The research was conducted in the Karonga and Phalombe Districts in the northern and southern parts of Malawi, respectively. The data were collected through a structured questionnaire survey administered to 82 agriculture extension workers, and a multiple regression analysis was conducted. The results indicated that farmers' socioeconomic factors, including high illiteracy and poverty rates, poor participation regarding project implementation, and high dependency syndrome, significantly affected the performance of agricultural projects. Within the projects them selves, this study discovered that there was no consistent flow of funds. This greatly affected the schedule of project activities, thereby compromising performance. The study recommends that the government and all relevant stakeholders work jointly to alleviate poverty. It is especially important to ensure that smallholder farmers are equipped with self-help capabilities. In addition, it is critical to examine the issues of funding disbursement.

Analysis of ABC Success Factors Affecting Construction Project Performance (건설프로젝트 성과에 영향을 미치는 ABC 성공요인 분석)

  • Shin, Young-Su;Cho, jin-Ho;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.56-65
    • /
    • 2022
  • This study tried to identify the key success factors of ABC by identifying the influence of ABC's success factors on project performance and analyzing the moderating effect of communication. For this purpose, factors applicable to construction projects were extracted through case studies related to the success factors of ABC, an activity-based financial management technique. The survey method was conducted as an online survey method using the Delphi method. For statistical analysis, frequency analysis and factor analysis were performed with SPSS Statistic 20, and hypothesis testing was performed with SmartPLS 2.0. As a result of the analysis, it was found that linkage with quality initiatives affects not only ABC's success factors on project performance, but also communication moderation effects. It was confirmed that linkage and communication with quality initiatives are the most important key success factors for ABC's success. Based on the results of this study, it is expected that if ABC and quality management are well linked, it will be effective in improving project performance.

A Study on the IT Project Selection Considering Budget Constraints (예산제약을 고려한 IT프로젝트 선정 모델 연구)

  • Park, Jaehee;Cho, Nam-Wook;Kim, Wooje
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.4
    • /
    • pp.327-338
    • /
    • 2013
  • Effective and efficient selection of IT projects is crucial for company's competitiveness. The selection of IT projects usually involves consideration of budget constraints but existing IT project selection models often neglect budget constraints. This paper presents an IT project selection model which considers budget constraints. AHP(Analytic Hierarchy Process) and Knapsack problem model have been combined to develop the proposed model, AHP-K model, where AHP is used to estimate weights of selection criteria and, then, a knapsack problem model is utilized to optimize selection of IT project while meeting the budget constraints. In this paper, a case study is provided to validate the effectiveness of the proposed AHP-K model. It has been shown that the proposed AHP-K model is better than the AHP model in terms of total utility of projects and investment efficiency.

A Decision Making Support Model of Work Item-based Adaptation Strategy for RFID-based Construction Logistics and Progress Management (RFID 기반의 건설 물류 및 진도관리 통합체계를 위한 공종별 적용전략 의사결정모델)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.3-15
    • /
    • 2009
  • As building construction projects have been more higher and bigger in scale, the needs for cost reduction, productivity improvement, and reducing of work terms have rapidly increased in recent years. There has been, accordingly, a great emphasis on the necessity of logistics and progress management by well-organized system developed based on the appliance of different management theories. Although highly developed IT technology has contributed to the efficiency and effectiveness in information research and project management, RFID has been merely applied to a single progress or a few types of materials in current management studies, not to the overall process of the projects. This research proposes a consistent and systemized approach for decision making in adopting RFID technology in a construction project to support construction logistics and progress management. With a decision making model that consists of process model and template developed in this research, risks in cost, time, and error in building RFID-based construction logistics and progress management could be minimized.

Human Resource Allocation Method using Similarity between Software Project Experience and WBS Activity (S/W 프로젝트 수행 경험과 WBS Activity의 유사도 측청을 통한 인력 할당 기법)

  • Kwon, Jinyong;Lee, Euijong;Baik, Doo-Kwon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.530-533
    • /
    • 2015
  • 기존의 조사에 따르면 현재 소프트웨어 개발 프로젝트의 실패율은 높은 편이다. 미국의 The Standish Group의 보고서에 따르면 소프트웨어 프로젝트의 성공률은 약 32%로 낮음을 볼 수 있다. 소프트웨어 프로젝트 성공에 영향을 주는 요소 중 하나는 인력배치이다. 이는 소프트웨어 개발 프로젝트의 참여 인력 구성에 따라 생산성, 비용 및 개발기간이 달라지게 되기 때문이다. 즉 인력 구성에 따라 프로젝트 성공률에 많은 영향을 주게 될 수 있다. 프로젝트 인력할당은 WBS(Work Breakdown Structure)에 따라 PM(Project Manager) 또는 부서장이 할당하게 되는데, 이들은 프로젝트 구성원들의 상세한 정보까지 파악이 어렵기 때문에 인력구성의 어려움이 존재한다. 과거에 수행했던 개발 프로젝트에서 유사성이 높은 작업을 했음에도 불구하고 전혀 경험이 없는 작업에 할당되면 상대적으로 업무 지식습득에 어려움을 겪고 시간 지연에 따른 비용이 추가적으로 발생하게 된다. 이러한 문제를 해결하고자 본 연구는 소프트웨어 개발 프로젝트 구성원의 상세한 정보들과 소프트웨어 개발 업무와의 유사도 측정을 통해 인력을 업무에 할당하는 기법을 제안한다. 이를 위하여 제안한 기법을 프로토타입으로 구현한 후 현업에서 실제 개발되는 프로젝트에 적용하여 제안 기법의 우수함을 평가한다.

Affect of Scaling Up a Project to the Implementation in Software Development Process (소프트웨어 개발 시 프로젝트의 크기가 구현에 미치는 영향)

  • Jeong, Moon Jae
    • Smart Media Journal
    • /
    • v.1 no.4
    • /
    • pp.79-83
    • /
    • 2012
  • In software development process, increasing the size of project(scaling up) is not a same problem as scaling up the parts of small project. Scaling up a project should accompany the communications, and cost, productivity, qualities, development activity, methodologies etc should be considered with it. In this paper, the effective usage of the important elements are discussed in order not to fail to scale up a project.

  • PDF

Understanding Collaborative Working Processes within Construction Project Teams Using Agent-Based Modeling and Simulation (에이전트기반 시뮬레이션을 활용한 건설프로젝트 조직 내 협업과정의 이해)

  • Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.70-77
    • /
    • 2014
  • Collaborative processes among team members including communication, coordination, and information-handling processes either during pre-construction or project execution are required in order to accomplish the objectives of construction projects. However, current construction management practice does not explicitly take the effect of organizational aspects on project performance into account. This paper introduces a method to understand collaborative processes in an explicit and systematic fashion. An agent-based simulation of collaborative working processes within construction project teams was designed from game theory perspective and implemented. The simulation produced both individual behavior and network dynamics. Individuals represented as agents made efforts to improve performance by communication and coordinating with other members, and overall team network was emerged as a result of interactions among members. Interestingly, it was found that the tendency of forming cohesive subgroups increased when sustaining relations with between-group partners incurs higher cost. The primary contribution of this paper is that it presented an explicit approach to examining collaborative working processes in construction project teams and it extended existing computational organization and network studies by integrating individual behavior models and network models.