• Title/Summary/Keyword: IT 프로젝트 성과

Search Result 1,260, Processing Time 0.027 seconds

The Effect of Consultant competency on the Project performance and Social-relational competency : focus on ICMCI competence framework (컨설턴트역량이 프로젝트성과와 사회관계역량에 미치는 영향 : ICMCI 역량프레임워크를 중심으로)

  • Hong, Yong-Ki;You, Yen-Yoo;Kim, Sang-Bong
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.10
    • /
    • pp.302-313
    • /
    • 2021
  • As the domestic consulting industry matured, consultants were required to have insight into customer's business and consulting business. Gaining these insights requires deep understanding of the business domains and high degree of competencies. This study empirically analyzed the data collected through the survey in order to apply the ICMCI competence model to domestic consultants. As a result of the study, it was found that business competency and technical competency had a positive effect on project performance, but values & behavior competency were not statistically significant. On the other hand, it was found that only technical competency, values & behavior competency had a positive effect on social-relational competency. Through this study, it was confirmed that a deep understanding and perception of the consulting business is necessary to grow into a professional consultant, but there is a limit to generalizing the research results because the characteristics of the population cannot be sufficiently reflected with a small sample.

A Use-Case Based Object-Oriented Project Scheduling Technique (Use-Case 기반 객체지향 프로젝트 스케줄링 기법)

  • 허진선;최시원;김수동
    • Journal of KIISE:Software and Applications
    • /
    • v.30 no.3_4
    • /
    • pp.293-307
    • /
    • 2003
  • Object-oriented development has been generalized, but object-oriented project planning and scheduling techniques have not been studied enough. Furthermore, it is difficult to apply the conventional software management techniques to object-oriented projects. Especially, the large scaled projects are increasing, but the project planing techniques for these large scaled projects have not been proposed enough. In this paper, we propose systematic techniques for OO based project scheduling. We suggest a 7 step-process for deriving the OO project schedule from the use-case diagram which is describing the functional requirements of the system. The proposed process includes identifying use-cases, drawing preliminary chart through interdependency analysis, identifying characteristics of each use case, determining the number of iteration, assigning use-cases to iteration, considering available resource and constraints, drawing revised PERT chart. Each step has the explanation of the input, output, and the guidelines needed to perform the step. The project scheduling technique proposed in this paper ran be used effectively in the planning phase which the purpose is to plan a development schedule to yield the high quality software in minimum time.

A Study on a Model for Assuring Course Completion Structure of Project Courses (프로젝트 교과목의 이수체계 준수 모델에 관한 연구)

  • Yoo, Hee-Jin;Park, Seok-Gyu;Park, Jae-Heung
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.4 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • This paper presents an approach for assuring course completion structure of the project courses by the requirements of KCC2010 engineering criteria. The proposed approach describes the way that courses of project are completed in a systematic using the gate model that is given the opportunity to take next project course by the course outcomes of project course taken. Results of assessments on 'Software Project I' course shows that it is important to protect the withdrawal of student who undergo retraining by efforts of professor course responsible to assure course completion structure of the project courses.

  • PDF

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

The Application of Data Warehouse for Developing Construction Productivity Management System (건설생산성 관리 시스템 구축을 위한 데이터웨어하우스의 적용)

  • Oh, Se-Wook;Kim, Myoung-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.127-137
    • /
    • 2006
  • Productivity is important to evaluate an efficiency of performed work and organization in construction industry. The productivity should be defined as activity level rather than macro level in order to effectively use productivity data and manage a project. The primary objective of this study is to develop a construction productivity management system using data warehouse, OLAP and data mining technologies which enables to easily accumulate the construction productivity data and perform multi layer analysis. Finally, it is anticipated that the effective use of the developed system would be able to measure the result of project and make a plan of the similar project with reliability.

A Study on Security Measure of Step-Wise Project (단계별 프로젝트 보안 방안에 대한 연구)

  • Shin, Seong-Yoon;Jang, Dai-Hyun;Kim, Hyeong-Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.11
    • /
    • pp.2459-2464
    • /
    • 2012
  • Many companies has led to the damage case being leaked to personal information by taking cyber attack. Also, planned hacking cases continues to increase for the purpose of acquiring monetary gain or causing social disruption induction, etc. Approximately 75% of the Web site attacks exploit the vulnerability of the application. Major security issue is to strengthen the S/W development security according to the legal basis. The members of the project team is the fact that the lack of recognition of application development security. In addition, passive response and security validation/testing, etc. throughout the SDLC to the entire area is insufficient. Therefore, rework due to the belated discovery of a defect has occurs. In this paper, we examine the case of the project step-by-step security activities by performing IT services companies. And, through this, we present security measures that can be applied to the step-wise real-world projects.

Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

Develop the Product Verification Process for the National R&D Project (국가연구개발프로젝트의 성과물 검증 프로세스 개발에 관한 연구)

  • Choi, Yo-Chul;Lee, Jae-Chon;Cho, Yeon-Ok;Kim, Sang-Ahm;Yoon, Hyuk-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.382-387
    • /
    • 2009
  • When a system or service is realized, it needs to be verified by requirements. The process of verification is to check whether customers/stakeholders requirements have been property transformed into a system or service. A set of verification processes is described in the international or industrial standards. However, it is not appropriate to directly apply those verification processes in the national research and development projects. In particular, we noticed the problem in the development of safety systems, standards and process in the railway systems domain. As such, this paper is concerned with a detailed development of the verification process in that domain. Specifically, an effective and efficient verification process is presented regarding the safety systems and process, safety standards, and safety documents. Also, the verification process was modeled by a computer-aided systems engineering tool, Cradle(R). As a result, the outcomes of the verification process on be managed efficiently.

Applying rework indicator to control software development project (소프트웨어 개발 프로젝트 제어를 위한 재작업 지표의 적용)

  • Han Hyuk-Soo;Kim Han-Saem
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.61-66
    • /
    • 2006
  • It is reported that the success ratio of software development projects has been only 30%. Many causes lower project's chance of success, particularly lack of systematic project management. Especially, moving on the next phase of project with unsatisfactory outputs can be very problematic because it can cause much waste of resource, time and even lead to the failure of the whole project. Peer review and inspection are some of the practices designed to prevent such waste and possible failure. When defects are identified through such progress, each developer has to work on the product component again and fix the problem. This process is called rework. In this paper, we propose a method for improving quality of reworked product component to prevent excessive cost and time consumed caused by moving on the next phase of a project with a problematic product component. More specifically, this paper suggests a rework indicator that measures the level of rework based on its complexity and severity and is used to choose appropriate checking method on reworked product component. The research also confirmed the method's usefulness and effectiveness by applying the suggested method on four projects.

Study on the Effects of Knowledge Sharing in the IT Industry of South Korea (한국 IT기업들의 지식의 공유 및 활용이 기업의 성과에 미치는 영향에 관한 연구)

  • lee, Won-hee;Choi, Ho-Sung;Jung, Jin-Young
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2018.01a
    • /
    • pp.63-66
    • /
    • 2018
  • 세계경제는 지식이 기업의 경쟁력을 좌우하는 글로벌 지식경제시대로 진입했다 할 수 있다. 즉 지식이 국가 경쟁력을 좌우하고, 지식을 활용한 다양한 경영활동이 기업의 성패를 결정짓는 지식경영시대가 도래 한 것이다. 이에 본 연구는 우리나라의 IT기업에 종사하는 종사자들을 대상으로 하여 프로젝트 참여자, 조직의 특성, 관계자의 특성이 지식의 공유 및 활용에 어떠한 영향을 주며 이는 기업의 성과에 긍정적인 영향을 주는 요인이 무엇인가를 살펴보았다. 그 결과 본 연구에서 제시한 모든 요인들이 지식공유 및 활용에 긍정적인 영향을 주며 이는 작게는 특정 프로젝트의 성과에 긍정적인 영향을 주며 크게는 기업의 성과에 긍정적인 영향을 주는 것으로 나타났다.

  • PDF