THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

일본의 빈집을 활용한 지역사회 커뮤니티 거점공간 분석 - 교토시 「빈집활용 & 마을만들기」 모델 프로젝트를 중심으로 - (Analysis of Local Community Spaces Bringing Empty Homes Back into Use in Japan - Focused on Empty Home Utilization Model Project of Kyoto City -)

  • 박혜선;은난순
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제24권2호
    • /
    • pp.65-77
    • /
    • 2018
  • Purpose: By identifying the contents of the "Empty Home Utilization & Community Revitalization Model Project" which is a pilot project of empty homes back into use in Kyoto City and analyzing the characteristics of the case housing, the purpose of this study is to find out implications and suggest improvements for the domestic empty home utilization project. Methods: The scope of the survey covers seven project sites in the period from 2014 to 2016. The research method is to derive the physical and operational characteristics of the project, through the literature reviews related to bringing empty homes back into use in Kyoto City and the field survey including the space measurement and the operator interview. Results: First, in order to succeed in bringing empty homes back into use for community revitalization, the selection process of the project and the role of the public in and after supporting the project are important. Second, the important features that are required as a physical characteristic of the project are an advantage in location and an interactive space that is available at all time like a community cafe at the entrance. Third, as an operational characteristic of the empty home utilization project, it is advantageous for the local residents to participate as a business actor or an operator, and it is the continuous use of residents and outsiders by implementing an operating program that is suitable for the characteristics of the local community. Implications: The physical and operational activation factors to bring empty homes back into use need to be included as the project screening standards. And it is necessary for the public to develop the Intermediate Support Organization and to participate in linking with residents in order to carry out the empty homes utilization project effectively.

파이로 프로젝트에 프로젝트 관리 적용 방안 (Application of Project Management on Pyro Project)

  • 김정국;김혁종;고원일;구정회;남효온
    • 시스템엔지니어링학술지
    • /
    • 제13권2호
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Classification and consideration for the risk management in the planning phase of NPP decommissioning project

  • Gi-Lim Kim;Hyein Kim;Hyung-Woo Seo;Ji-Hwan Yu;Jin-Won Son
    • Nuclear Engineering and Technology
    • /
    • 제54권12호
    • /
    • pp.4809-4818
    • /
    • 2022
  • The decommissioning project of a nuclear facility is a large-scale process that is expected to take about 15 years or longer. The range of risks to be considered is large and complex, then, it is expected that various risks will arise in decision-making by area during the project. Therefore, in this study, the risk family derived from the Decommissioning Risk Management (DRiMa) project was reconstructed into a decommissioning project risk profile suitable for the Kori Unit 1. Two criteria of uncertainty and importance are considered in order to prioritize the selected 26 risks of decommissioning project. The uncertainty is scored according to the relevant laws and decommissioning plan preparation guidelines, and the project importance is scored according to the degree to which it primarily affects the triple constraints of the project. The results of risks are divided into high, medium, and low. Among them, 10 risks are identified as medium level and 16 risks are identified as low level. 10 risks, which are medium levels, are classified in five categories: End state of decommissioning project, Management of waste and materials, Decommissioning strategy and technology, Legal and regulatory framework, and Safety. This study is a preliminary assessment of the risk of the decommissioning project that could be considered in the preparation stage. Therefore, we expect that the project risks considered in this study can be used as an initial data for reevaluation by reflecting the detail project progress in future studies.

요르단연구로건설사업 문서관리시스템 구축 (Establishment of Document Control System for the Jordan Research and Training Reactor Project)

  • 박국남;고영철;우상익;오수열;이두정
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향 (The Effect of Project Managers' Competences on Performance in Public S/W)

  • 오민정;주형준;이민호
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

중소제조업체의 정보시스템 개발 실패 요인에 관한 실증연구 (An Empirical Study on Failure Factors of Information System Development Projects for SMEs)

  • 홍순구;최일용
    • 한국IT서비스학회지
    • /
    • 제8권4호
    • /
    • pp.41-55
    • /
    • 2009
  • Due to the global business environments and severe competitions, SMEs have carried out IS projects for their competitive advantages. However, numerous organizations have faced with difficulties in the IS project management such as large amounts of IT expenses and uncertainties in project implementations. Thus, this study is intended to discover critical risk factors in the IS project management. To achieve this research goal, we have mailed questionnaires to SMEs and SI companies that experienced IS project failures and 63 usual data were collected. The result of analysis with step wise regression showed that 6 factors are related with IS project failures. The study contributes to the literature in two ways. First, this paper empirically identifies IS risk factors for SME manufactures. Second, this research result can be utilized as a checklist for the successful IS implementations. Limitations and future research topics are also discussed.