• Title/Summary/Keyword: IS프로세스

Search Result 4,684, Processing Time 0.038 seconds

A Study on the Architecture Modeling of Information System using Simulation (시뮬레이션을 이용한 정보시스템 아키텍쳐 모델링에 관한 연구)

  • Park, Sang-Kook;Kim, Jong-Bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.455-458
    • /
    • 2013
  • The conventional design of the information system architecture based on the personal experience of information systems has been acted as a limit in progress utilizing appropriate resource allocation and performance improvements. Architecture design depending on personal experience makes differences in variance of a designer's experience, intellectual level in related tasks and surroundings, and architecture quality according to individual's propensity. After all these problems cause a waste of expensive hardware resources. At working place, post-monitoring tools are diversely developed and are running to find the bottleneck and the process problems in the information operation. However, there are no simulation tools or models that are used for expecting and counteracting the problems at early period of designing architecture. To solve these problems we will first develop a simulation model for designing information system architecture in a pilot form, and will verify validity. If an error rate is found in the permissible range, then it can be said that the simulation reflects the characteristic of information system architecture. After the model is developed in a level that can be used in various ways, more accurate performance computation will be able to do, getting out of the old way relying on calculations, and prevent the existence of idle resources and expense waste that comes from the wrong design of architecture.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

Behavioral Contextualization for Extracting Occupant's ADL Patterns in Smart-home Environment (스마트 홈 환경에서의 재실자 일상생활 활동 패턴 추출을 위한 행동 컨텍스트화 프로세스에 관한 연구)

  • Lee, Bogyeong;Lee, Hyun-Soo;Park, Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.21-31
    • /
    • 2018
  • The rapid increase of the elderly living alone is a critical issue in worldwide as it leads to a rapid increase of a social support costs (e.g., medical expenses) for the elderly. In early stages of dementia, the activities of daily living (ADL) including self-care tasks can be affected by abnormal patterns or behaviors and used as an evidence for the early diagnosis. However, extracting activities using non-intrusive approach is still quite challenging and the existing methods are not fully visualized to understand the behavior pattern or routine. To address these issues, this research suggests a model to extract the activities from coarse-grained data (spatio-temporal data log) and visualize the behavioral context information. Our approach shows the process of extracting and visualizing the subject's spaceactivity map presenting the context of each activity (time, room, duration, sequence, frequency). This research contributes to show a possibility of detecting subject's activities and behavioral patterns using coarse-grained data (limited to spatio-temporal information) with little infringement of personal privacy.

Seismic Performance-based Design using Computational Platform for Structural Design of Complex-shaped Tall Building (전산플랫폼을 이용한 비정형 초고층 건축물 성능기반 내진설계기술의 실무적용)

  • Lee, Dong-Hun;Cho, Chang-Hee;Youn, Wu-Seok;Kang, Dae-Eon;Kim, Taejin;Kim, Jong-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.1
    • /
    • pp.59-67
    • /
    • 2013
  • Complex-shaped tall building causes many structural challenges due to its structural characteristics regarding inclined members and complexed shape. This paper is aimed at development of design process using computational-platform which is effective design tool for responding frequent design changes, particularly as to overseas projects. StrAuto, a parametric structural modeling and optimizing system, provides the optimized alternatives according to design intent and realize a swift process converting a series of structural information necessary to nonlinear analytical models. The application of the process was to a 45-story hotel building in Ulanbator, Mongolia adopting shear wall and special moment frame with outrigger systems. To investigate the safety of lateral force resisting system against maximum considered earthquake(MCE), nonlinear response history analysis was conducted using StrAuto.

A study on in-flight acoustic load reduction in launch vehicle fairing by FE-SEA hybrid method (FE-SEA 하이브리드 기법을 이용한 비행 중 발사체 페어링 내부 음향하중 저감에 관한 연구)

  • Choi, Injeong;Park, Seoryong;Lee, Soogab
    • The Journal of the Acoustical Society of Korea
    • /
    • v.39 no.4
    • /
    • pp.351-363
    • /
    • 2020
  • Launch vehicles are subject to airborne acoustic loads during atmospheric flight and these effects become pronounced especially in transonic region. As the vibration due to the acoustic loads can cause malfunction of payloads, it is essential to predict and reduce the acoustic loads. In this study, a complete process has been developed for predicting airborne vibro-acoustic environment inside the payload pairing and subsequent noise reduction procedure employing acoustic blankets and Helmholtz resonators. Acoustic loads were predicted by Reynolds-Averaged Navier-Stokes (RANS) analysis and a semi-empirical model for pressure fluctuation inside turbulent boundary layer. Coupled vibro-acoustic analysis was performed using VA One SEA's Finite Element Statistical Energy Analysis (FE-SEA) hybrid module and ANSYS APDL. The process has been applied to a hammerhead launch vehicle to evaluate the effect of acoustic load reduction and accordingly to verify the effectiveness of the process. The presently developed process enables to obtain quick analysis result with reasonable accuracy and thus is expected to be useful in the initial design phase of a launch vehicle.

Hash-chain-based IoT authentication scheme suitable for small and medium enterprises (중소기업 환경에 적합한 해쉬 체인 기반의 IoT 인증 기법)

  • Jeong, Yoon-Su;Yon, Yong-Ho;Ku, Jin-Hee
    • Journal of Convergence for Information Technology
    • /
    • v.7 no.4
    • /
    • pp.105-111
    • /
    • 2017
  • With the emergence of the fourth industrial revolution, more and more attempts have been made to apply IoT technology to the manufacturing process and launch the product. In this paper, we propose IoT authentication scheme based on hash chain which can easily apply IoT device to small and medium enterprises in Korea. In the proposed method, the companies that installed IoT devices suitable for the manufacturing environment are selected to maintain the linkage between IoT devices so that product information and release information can be efficiently collected and managed during the entire manufacturing process. In addition, the proposed scheme is characterized in that it does not require an additional encryption / decryption algorithm because the authentication information of the IoT device is constructed based on a hash chain. As a result of the performance evaluation, the efficiency of the manufacturing process was improved by 18.5% and the processing of the manufacturing process with the IoT device was shortened by 20.1% on the average according to the application of the IoT device. In addition, the labor cost reduction costs in the manufacturing process decreased by an average of 30.7%.

Potential Value Improvement Target Choice Methodology (PVTCM) in Construction Projects (건설 프로젝트의 잠재적 가치개선 대상 선정 방법론(PVTCM))

  • Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • Construction VE activities has occupies an important position as a key tool of the project in terms of budget and performance improvements. Reflecting this situation, VE application scope is being expanded than before. Thus, construction projects are required the continued research and development for effective use of construction VE. VE target choice method is the central part in the construction VE work. But, this has a problem with low utilization in practical terms. Accordingly, this study was developed the new methodology(PVTCM) for VE target selection of the construction VE work. Its contents are as follows: First, to analyze practical problem for VE target choice method through VE practical data. Second, to extract the high potential VE object based on the cost model and ideas similarity by excellent VE cases analysis. Third, to implement standardized VE object item by using affinity diagram for each construction type items. This research were conducted to experts interviews for comparison analysis with the cost model as one of a representative target selection method. As a result, proposed method were implemented significantly higher performance in terms of practical effectiveness than conventional method.

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.