This paper is about optimal flywheel capacity estimation for Ullueng-do power system. The power system of Ullueng-do has some differences with other island power system in Korea. It includes wind generator, hydro-generators as well as diesel generators. There are some problems on 600kW wind generator. Because of frequent drop of wind generator, the Ulleung-do power system have been threatened on frequency. The power frequency is 60Hz, and it should be between 59.9 and 60.1Hz. However, since the electrical inertia is small and the weight of wind generation is relatively high, generator drop of wind generation might make the power frequency out of boundary. In this paper, the flywheel energy storage system is assumed to be installed on Ulleung-do power system. Then, the maximum wind generation capacity and the optimal superconducting flywheel energy storage system capacity is estimated by the transient stability simulations.
Using a surplus head in presented water supply pipes, we have studied to improve the operating efficiency of small hydro generator, which was chosen for a test model with Sung-Nam and Bo-Ryong small hydro power plant. With regard to power control and countermeasure of water hammer impact, Finally we have represented the optimal control method through the synthetical analysis of existing system symptoms, operation efficiency, the effect of water hammer impact and system configuration.
A new approach considering CO2 air pollution constraints in the long-term generation mix is proposed under uncertain circumstances. A characteristic feature of the presented approach in this paper is what effects give the air pollution constraints in long term best generation mix. Best generation mix problem is formulated by linear programming with fuel and construction cost minimization with load growth, reliability (reserve margin rate) and air pollutionconstraints. The proposed method accommodates the operation of pumped-storage generator. It was assumed in this study that the construction planning of the hydro power plants is given separately from the other generation plans. The effectiveness of the proposed approach is demonstrated by applying to the best generation mix problem of KEPCO-system, which contains nuclear, coal, LNG, oil and pumped-storage hydro plant multi-years.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.1
/
pp.1-6
/
2017
Total capacity of pumped hydro storage(PHS) in Korean power system reaches 4,700MW, though the share of it is about 4.56% of total capacity The Unit Commitment program, E-terracommit which is used for the operational purpose by KPX, includes the PHS model. But the model has a defect that it does not include the information of water level of upper reservoir. Therefore two types of improved the PHS models are represented in this paper. The first model is a optimized model by connecting the upper reservoir water level to the non-spinning reserve. The other model is to have priority allocate both the PHS and combined cycle generator for non-spinning reserve. The proposed two models and the E-terracommit model is compared and resulting to have improvement in estimating non-spinning reserve when using the proposed models.
Stator winding of hydro generator is gradually deteriorated by multi-stress and steady degradation of insulation results in insulation breakdown. The region where insulation breakdown occurs in stator winding is part where the multi-stress causes the defect of insulation material and electrical stress has been concentrated. Therefore, we judged locations of insulation breakdown to be varied according to various stress factors in service. In this paper, we drew the stator winding of hydro generators which has run for a long time and separated it into 3 parts(central part, end winding part, drawing part) according to the positions laid on the core. We performed electrical and thermal stress on these specimens for 1000 hrs under the same condition, measured the condition regularlyand analyzed the insulation status of each winding by performing partial discharge test. In addition, we analyzed the trend of partial discharge concerning specimens that caused the insulation breakdown during aging.
Kang, Seo Kon;Kang, Hwayoon;Lee, Byoung-Il;Kim, Jeong-In
Journal of Radiation Protection and Research
/
v.39
no.1
/
pp.14-20
/
2014
A lot of radiation exposure for radiation workers who are engaged in Nuclear Power Plants, especially PWRs, have been caused during the outage by CRUD, such as $^{58}Co$, $^{60}Co$, in Reactor Coolant System. And therefore we need to know source terms to achieve optimization of protection for the radiation workers from radiation exposure at Nuclear Power Plants efficiently. This study analyzed source terms at domestic NPPs (PWRs) nearby Steam Generator with CZT semiconductor detector using by IN-VIVO method during the outage for the first time in the country. We checked difference for the detected source terms between old and new NPP. It was performed especially to see a change of source terms by water chemistry process as well. There was not any difference by water chemistry process both NPPs. The main source terms are $^{58}Co$ and $^{60}Co$ at all NPPs. $^{59}Fe$ only appears in the new NPP. $^{137}Cs$ and $^{95}Zr$ are shown in the old NPP. The fraction of $^{58}Co/^{60}Co$ in the new NPP is higher than the old NPP for increasing the specific activity of $^{60}Co$.
통상 발전원으로서의 역할만을 담당하는 일반 화력발전기와는 달리 양수발전기는 발전원으로서의 역할뿐 아니라 계통운영의 경제성과 운영방향에 따라 부하로서의 역할을 수행한다. 이때는 동기기로서 조상기 혹은 전동부하가 되며 이로 인하여 일반 화력발전기와는 다르게 양수운전등 부하로서의 역할을 위한 또 다른 보호시스템을 적용하고 있다. 대용량 발전기와 전동부하로서의 역할을 겸용함으로써 필연적으로 나타나는 화력발전기와의 보호방식 차이를 비교 분석하고 보다 안정된 설비운전을 위한 보호시스템 적용에 대해 논하고자한다.
In this paper, a dc-dc power converter scheme with the FPGA based technology is proposed to apply for solar power system which has many features such as the good waveform, high efficiency, low switching losses, and low acoustic noises. The circuit configuration is designed by the conventional control type converter circuit using the isolated dc power supply. This new scheme can be more widely used for industrial power conversion system and many other purposes. Also, I proposed an efficient photovoltaic power interface circuit incorporated with a FPGA based DC-DC converter and a sine-pwm control method full-bridge inverter. The FPGA based DC-DC converter operates at high switching frequency to make the output current a sine wave, whereas the full-bridge inverter operates at low switching frequency which is determined by the ac frequency. As a result, we can get a 1.72% low THD in present state using linear control method. Moreover, we can use stepping control method, we can obtain the switching losses by Sp measured as 0.53W. This paper presents the design of a single-phase photovoltaic inverter model and the simulation of its performance.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.63
no.3
/
pp.149-156
/
2014
Generator of hydroelectric generating unit is to be protected by the digital protection IED. Now, any IED of large capacity for hydro power plant was not developed by domestic technology. This is because it is required for the generator of the high reliability technology and considered as due to the sale of the market of IED device is small. However, the protection IED must be develop by domestic technology to meet the advanced needs of the construction and replacement of electrical equipment in accordance with the new power plant development. In this paper, a digital algorithms for protection IED of large size of hydroelectric generating unit were designed. The algorithms consist of the stator protection, anti-motoring, overexcitation and loss of excitation. The performance of the algorithms were evaluated by using the simulation data collected from the PSCAD/EMTDC software. From test results, it can be seen that the developed algorithms were not maloperation.
Park, Ho-Cheul;Chun, Yung-Sik;Jang, Ki-Jun;Chung, Chan-Soo
Proceedings of the KIEE Conference
/
1999.11c
/
pp.582-584
/
1999
Generator has synchronized with power Network after build-up output voltage. In order to prevent a current surge when synchronizing, the conditions such as identical no-load voltages identical no-load frequencies and identical phase positions must be met between generator voltage and network voltage. Hydro-Pump generators or Gas-turbine generators, Co-generation Generators that serve peak load of network are synchronized many times. So, Automatic Synchronizing Circuits are very important service. This report apply Diagnosis methods the Automatic Synchronizing Circuits(Device) by developing simulator.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.