• 제목/요약/키워드: Hydro power generator

검색결과 123건 처리시간 0.028초

중수로형 원자력 발전소 비상디젤발전기 주기적 안전성 평가 (Periodic Safety Review of EDG for CANDU Type Nuclear Power Plant)

  • 하체웅;한성흠;임우상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.666_667
    • /
    • 2009
  • 원자력발전소의 비상전력계통은 소외정전 시 발전소 안전정지에 필요한 안전관리 설비에 비상전력을 공급하는 계통으로 비상전력계통 모선에 비상디젤발전기(Emergency Diesel Generator : EDG)가 설치되어 있다. 본 논문에서는 국내 중수로형 원자력 발전소에 대해서 최초로 주기적 안전성 평가(Periodic Safety Review : PSR)을 수행한 결과를 기술하였다.

  • PDF

DETECTION OF ODSCC IN SG TUBES DEPENDING ON THE SIZE OF THE CRACK AND ON THE PRESENCE OF SLUDGE DEPOSITS

  • Chung, Hansub;Kim, Hong-Deok;Kang, Yong-Seok;Lee, Jae-Gon;Nam, Minwoo
    • Nuclear Engineering and Technology
    • /
    • 제46권6호
    • /
    • pp.869-874
    • /
    • 2014
  • It was discovered in a Korean PWR that an extensive number of very short and shallow cracks in the SG tubes were undetectable by eddy current in-service-inspection because of the masking effect of sludge deposits. Axial stress corrosion cracks at the outside diameter of the steam generator tubes near the line contacts with the tube support plates are the major concern among the six identical Korean nuclear power plants having CE-type steam generators with Alloy 600 high temperature mill annealed tubes, HU3&4 and HB3~6. The tubes in HB3&4 have a less susceptible microstructure so that the onset of ODSCC was substantially delayed compared to HU3&4 whose tubes are most susceptible to ODSCC among the six units. The numbers of cracks detected by the eddy current inspection jumped drastically after the steam generators of HB4 were chemically cleaned. The purpose of the chemical cleaning was to mitigate stress corrosion cracking by removing the heavy sludge deposit, since a corrosive environment is formed in the occluded region under the sludge deposit. SGCC also enhances the detection capability of the eddy current inspection at the same time. Measurement of the size of each crack using the motorized rotating pancake coil probe indicated that the cracks in HB4 were shorter and substantially shallower than the cracks in HU3&4. It is believed that the cracks were shorter and shallower because the microstructure of the tubes in HB4 is less susceptible to ODSCC. It was readily understood from the size distribution of the cracks and the quantitative information available on the probability of detection that most cracks in HB4 had been undetected until the steam generators were chemically cleaned.

A Voltage and Frequency Controller for Stand Alone Pico Hydro Generation

  • Kasal, Gaurav Kumar;Singh, Bhim
    • Journal of Power Electronics
    • /
    • 제9권2호
    • /
    • pp.267-274
    • /
    • 2009
  • This paper deals with a voltage and frequency (VF) controller for an isolated power generation system based on an asynchronous generator (AG) driven by a pico hydro turbine. The proposed controller is a combination of a static compensator (STATCOM) and an electronic load controller (ELC) for decoupled control of the reactive and active powers of the AG system to control the voltage and frequency respectively. The proposed generating system along with its VF controller is modeled in MATLAB using SIMULINK and PSB (Power System Block Sets) toolboxes. The performance of the controller is verified for the proposed system and feeding various types of consumer load such as linear/non-linear, balanced/unbalanced and dynamic loads.

블레이드 형상 변화에 따른 마이크로 튜블러 수차의 CFD 성능해석 (CFD Performance analysis of Micro Tubular-type hydro turbine by blade shape)

  • 박지훈;황영철;모장오;김유택;이영호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.206.1-206.1
    • /
    • 2011
  • Recently, various developments in the area of small hydropower have being made and small hydro turbines are suitable for domestic use because it is a clean and renewable energy source. A small hydropower generator produces power by using the different water pressure levels in pipe lines and energy which was initially wasted by use of a reducing valve at the end of the pipeline is instead collected by a tubular-type hydro turbine in the generator. In this study, in order to acquire the performance of tubular-type hydro turbine applied, the output power, head, efficiency characteristics due to the different guide vane and runner vane angle are examined in detail. Moreover, influences of pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  • PDF

소수력 발전용 고효율 100kW 발전기의 설계해석 및 경제성 분석 (Design Analysis and Economic Analysis of high Efficiency 100kW Generator for Hydro Power System)

  • 지인호;강승진
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.428-438
    • /
    • 2016
  • This paper shows the design of the 100 kW IPMSG for small hydraulic power generator. The high-efficient generator, method of the dual layer interior permanent magnet was studied to improve the method of the single layer interior permanent magnet, which is mostly used. Analysis of magnet arrangement and cogging torque was done by FEM. According to structure analysis of dual layer interior permanent magnet, the amount of usage of the permanent magnet was reduced and cogging torque was decreased as well. With these successful results, the high-efficient generator design was accomplished. Based on the results of the structure analysis, the test product was designed and manufactured. And the design values and performance outputs were compared and verified with success. Also, the economic feasibility was conducted based on the electric power generated from the test product installed at the site. By the B/C analysis, in case that only SMP was analyzed, B/C ratio was 1.24 at the discount ratio of 5.5%, which considered to be economically feasible. The study is expected to be used for the application of developing large scale high-efficient interior permanent magnet synchronous generator.

STEAM GENERATOR TUBE INTEGRITY ANALYSIS OF A TOTAL LOSS OF ALL HEAT SINKS ACCIDENT FOR WOLSONG NPP UNIT 1

  • Lim, Heok-Soon;Song, Tae-Young;Chi, Moon-Goo;Kim, Seoung-Rae
    • Nuclear Engineering and Technology
    • /
    • 제46권1호
    • /
    • pp.39-46
    • /
    • 2014
  • A total loss of all heat sinks is considered a severe accident with a low probability of occurrence. Following a total loss of all heat sinks, the degasser/condenser relief valves (DCRV) become the sole means available for the depressurization of the primary heat transport system. If a nuclear power plant has a total loss of heat sinks accident, high-temperature steam and differential pressure between the primary heat transport system (PHTS) and the steam generator (SG) secondary side can cause a SG tube creep rupture. To protect the PHTS during a total loss of all heat sinks accident, a sufficient depressurization capability of the degasser/condenser relief valve and the SG tube integrity is very important. Therefore, an accurate estimation of the discharge through these valves is necessary to assess the impact of the PHTS overprotection and the SG tube integrity of the primary circuit. This paper describes the analysis of DCRV discharge capacity and the SG tube integrity under a total loss of all heat sink using the CATHENA code. It was found that the DCRV's discharge capacity is enough to protect the overpressure in the PHTS, and the SG tube integrity is maintained in a total loss of all heat accident.

시험 데이터를 이용한 유도발전기의 출력 특성 분석 (Output Characterization Analysis of Induction Generator using Test Data)

  • 김종겸
    • 전기학회논문지
    • /
    • 제62권7호
    • /
    • pp.1027-1032
    • /
    • 2013
  • Induction generator is used primarily in small hydroelectric power station less than 1000kW recently. Unlike the synchronous generator, induction generator produces electricity when it is rotated above synchronous speed. In this study, we calculated the parameters of the induction generator with test reports presented by the manufacturer and analyzed that how much the induction generator has produced power near the rated speed. If we can use the test data to calculate the parameters, it is possible the output characteristics analysis of the induction generator. As a result of analysis, we concluded that output of induction generator varies sensitively for small changes in rotational speed in the near synchronous speed.

배전선로에 유도발전기 연결시 역률 변동에 관한 연구 (A study on the variation of power factor by connection of the induction generator to the distribution line)

  • 김종겸;박영진;이경배;김영국
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1469-1470
    • /
    • 2015
  • Recently induction generator has been applied to many small hydro power plants. Induction generator needs a reactive power for magnetization. The reactive power of induction generator is being supplied from the supply side mostly. The use of induction generators in the power distribution grid can affect the power factor. The power factor of induction generator is fixed already during production. The power factor in the distribution system is due to the increase or decrease of the load rather than due to the induction generator. In this study, we analyzed how the power factor is changed according to the load increase or decrease in the distribution lines.

  • PDF

농형 유도발전기의 계통 연계시 전압 변동 및 전력 흐름 분석 (Analysis for Voltage Fluctuation and Power Flow at the Grid-Connected Time of Squirrel-Cage Induction Generator)

  • 김종겸
    • 조명전기설비학회논문지
    • /
    • 제28권6호
    • /
    • pp.45-51
    • /
    • 2014
  • Synchronous generators and induction generators are mainly used in hydroelectric power generation. Synchronous generator is mainly applied to large hydroelectric plants but induction generator is applied to the small hydro power plants. Stability of induction generator is slightly less than the synchronous generator. However, induction generator has many advantages rather than a synchronous generator in terms of price and maintenance. So Induction generator is used primarily in small hydroelectric power station less than 1,000kW recently. Squirrel cage induction generator generates a high inrush current at the grid-connection. This high inrush current causes a voltage drop on the grid. In order to reduce the voltage drop and to analyze the power flow, the analysis for operating characteristics of the induction generator should be reviewed in advance. In this study, we analyzed the voltage drop and power flow analysis when a 1500kW induction generator is connected to the grid. The voltage drop is slightly higher than the acceptable range of distributed power supply voltage and the power flow of the generator is performed well.

수력 발전기의 운전중 부분방전 측정기법에 대한 신뢰성 평가 (Evaluation of On-Line Partial Discharge Measurement Techniques on Hydro-Generator)

  • 황돈하;김진봉;김용주;박명수;김택수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 하계학술대회 논문집 C
    • /
    • pp.1526-1529
    • /
    • 1994
  • In hydro-generator, a groundwall insulation of stator windings gradually deteriorates due to mechanical, thermal, electrical and environmental stresses. These stresses combine to result in loose windings, delamination of the stator insulation and/or electrical tracking of the end winding, all of which can lead to stator insulation failures. Conventionally, off-line tests such as partial discharge measurement, DC/AC current test and ${\Delta}tan{\delta}$ test has been used for estimation of winding condition. However, off-line test requires large power supply and generator outage. In addition, major cause of insulation problems such as loose wedges and slot discharges may not be found with off-line diagnoses. This paper describes the on-line partial discharge measurement techniques in the generator stator windings. The experimental results from the UIAM #1 hydro-generator confirms a optimistic application of on-line generator diagnosis method as a reliable tool for evaluation of winding condition.

  • PDF