• 제목/요약/키워드: Hydro generator

검색결과 155건 처리시간 0.023초

Battery Energy Storage Based Voltage and Frequency Controller for Isolated Pico Hydro Systems

  • Singh, Bhim;Rajagopal, V.
    • Journal of Power Electronics
    • /
    • 제9권6호
    • /
    • pp.874-883
    • /
    • 2009
  • This paper deals with an integrated voltage and frequency (VF) controller for isolated asynchronous generators (IAG) driven by a constant power pico-hydro uncontrolled turbine feeding three-phase four-wire loads. The proposed VF controller is used to control the frequency and voltage of an IAG with load leveling. Such a VF controller is also known as an integrated electronic load controller (IELC) which is realized using an isolated star/polygon transformer with a voltage source converter (VSC) and a battery at its DC bus. The proposed generating system with a VFC is modeled and simulated in MATLAB along with Simulink and Simpower system (SPS) toolboxes. The simulated results are presented to demonstrate the performance of an isolated asynchronous generator feeding three-phase four-wire loads with neutral current compensation.

수차 발전기의 실시간 효율관리 기법 연구 (The study on the technic of real time efficiency management of hydro turbine -generator)

  • 김승효;권영준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1018-1020
    • /
    • 2000
  • In the operation and maintenance activity of hydro turbine generator, one of the important parameters is the efficiency. This study analyze the case of efficiency management by pressure time method and survey the application of this method through the actual test. And it is confirmed that the Pressure time method exccesively limit the general condition to be applied. If index method is used for efficiency management because the index method calibrated by absolute discharge(by flow of pressure time method) is very accurate. it make to be able to manage the realtime efficiency.

  • PDF

연간등가비용법을 이용한 수력발전기의 경제적 수명주기 분석 (Analysis of Economic Life Cycle for Hydro-Generator Based on Annual Equivalent Cost Method)

  • 이성훈;장정호;김진오;이흥호
    • 전기학회논문지
    • /
    • 제60권11호
    • /
    • pp.1993-1999
    • /
    • 2011
  • Today, the power utilities is setting on the slow load growth and the aging of power equipment, and then could spend the efforts on the stability of system performance. Asset management may be defined as the process of maximizing corporate profit by maximizing performance and minimizing cost over the entire life cycle of power equipment. Therefore, asset management is great way to fulfill the economic investment and the stability of system performance. This paper presents the application of effective asset managem ent from an economic perspective. A proposed method is considering the life cycle analysis using life cycle cost methodology for hydro-generator during the total life cycle. The life cycle cost methodology include a way to calculating maintenance and operating costs. The proposed method will be expected to play an important role in investment decision making considering economic evaluation.

수력발전기 고정자권선용 운전중 부분방전 측정 센서 및 시스템 개발 (Development of the On-line Partial Discharge Measuring Sensor and System on Stator Windings for Hydro Generator)

  • 강동식;선종호;황돈하;윤영호;서일수;신병철;김현일;이광호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전기설비전문위원
    • /
    • pp.103-106
    • /
    • 2005
  • A lot of R&D on the diagnosis of stator winding insolation for large rotating machines has been carried out since the 1970s. The on-line partial discharge measurement has proved to be an effective technique in the evaluation of the state of stator insulation in high voltage rotating machines. The purpose of this paper is to describe the method of the on-line partial discharge measurement on stator windings for hydro- generator with ceramic sensor and measuring system. We developed ceramic coupling sensor, partial discharge measuring system, terminal box and index parameters.

  • PDF

CFD를 이용한 10kW급 모델 실험용 프로펠러 수차의 유량 및 러너 베인 깃 수 변화에 따른 성능해석 (Performance Analysis of 10kW Class Propeller Hydro Turbine by the Change of Flow Rates and the Number of Runner Vane Using CFD)

  • 박지훈;김유택;조용;김병곤;이영호
    • 한국유체기계학회 논문집
    • /
    • 제17권2호
    • /
    • pp.5-11
    • /
    • 2014
  • Small hydro power, among other renewable energy resources, has been evaluated to have enough development value because it is a clean, renewable and abundant energy resource. In addition, small hydro power has the advantage of low cost development by using existing facilities like sewage treatment plants, water works and similar resources. But in the case of small hydro power systems, there are problems with degraded operation efficiency of turbine due to changes in flow rates. In order to overcome this, variable speed control can be achieved by using the power rectifier and permanent magnetic synchronous generator(PMSG) as a possible method to respond to the changes in flow rates. In this study, a commercial ANSYS CFD code was used to analyze the performance of 10kW class propeller hydro turbine and to also investigate flow characteristics at variable flow rates and runner vane.

배전선로에 유도발전기 연결시 역률 변동에 관한 연구 (A study on the variation of power factor by connection of the induction generator to the distribution line)

  • 김종겸;박영진;이경배;김영국
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1469-1470
    • /
    • 2015
  • Recently induction generator has been applied to many small hydro power plants. Induction generator needs a reactive power for magnetization. The reactive power of induction generator is being supplied from the supply side mostly. The use of induction generators in the power distribution grid can affect the power factor. The power factor of induction generator is fixed already during production. The power factor in the distribution system is due to the increase or decrease of the load rather than due to the induction generator. In this study, we analyzed how the power factor is changed according to the load increase or decrease in the distribution lines.

  • PDF

농형 유도발전기의 계통 연계시 전압 변동 및 전력 흐름 분석 (Analysis for Voltage Fluctuation and Power Flow at the Grid-Connected Time of Squirrel-Cage Induction Generator)

  • 김종겸
    • 조명전기설비학회논문지
    • /
    • 제28권6호
    • /
    • pp.45-51
    • /
    • 2014
  • Synchronous generators and induction generators are mainly used in hydroelectric power generation. Synchronous generator is mainly applied to large hydroelectric plants but induction generator is applied to the small hydro power plants. Stability of induction generator is slightly less than the synchronous generator. However, induction generator has many advantages rather than a synchronous generator in terms of price and maintenance. So Induction generator is used primarily in small hydroelectric power station less than 1,000kW recently. Squirrel cage induction generator generates a high inrush current at the grid-connection. This high inrush current causes a voltage drop on the grid. In order to reduce the voltage drop and to analyze the power flow, the analysis for operating characteristics of the induction generator should be reviewed in advance. In this study, we analyzed the voltage drop and power flow analysis when a 1500kW induction generator is connected to the grid. The voltage drop is slightly higher than the acceptable range of distributed power supply voltage and the power flow of the generator is performed well.

수도관로 소수력발전 운영효율 향상을 위한 최적제어 방안 (The Optimum Control Study for Improving Efficiency of the Small Hydropower Generation in Water Pipe)

  • 홍정조;임동희;김수상
    • 신재생에너지
    • /
    • 제4권2호
    • /
    • pp.31-38
    • /
    • 2008
  • Using a surplus head in presented water supply pipes, we have studied to improve the operating efficiency of small hydro generator, which was chosen for a test model with 00 hydro power plant. With regard to power control and countermeasure of water hammer impact, Finally we have represented the optimal control method through the synthetical analysis of existing system symptoms, operation efficiency, the effect of water hammer impact and system configuration.

  • PDF

Analysis and Correction of Through-bolt End-region Overheating and Breakdown Failure in a Large Tubular Hydro-generator

  • Zhou, Zhi-ting;Fan, Zhen-nan;Li, Jian-fu;Wen, Kun;Zhang, Bide;Wang, Tao;Xia, Yan-kun;Sun, Zhang;Yao, Bing
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권6호
    • /
    • pp.2292-2300
    • /
    • 2018
  • A field-circuit coupling model of a typical faulty generator is established to correct through-bolt end-region overheating and breakdown failure in a tubular hydro-generator. Using the model, eddy current loss and electromagnetic forces on through bolts under normal and failure conditions are analyzed and compared and the natural frequency of a through bolt is determined. Based on the analysis results, the causative mechanism of failure is revealed and targeted improvement design measures are proposed. The numerical results are found to be consistent with the actual fault characteristics, validating the design measure improvements. The results are useful in improving the design and manufacturing standards and enhancing the operational reliability of large tubular hydro-generators.

회전형 탐촉자의 다중균열 분해능이 증기발생기 전열관의 구조건전성 평가에 미치는 영향 (An Effect on the Structural Integrity Assessment of Steam Generator Tubes with Resolution of Rotating Pancake Coils for Multiple Cracks)

  • 강용석;천근영;남민우;박재학
    • 비파괴검사학회지
    • /
    • 제34권5호
    • /
    • pp.356-361
    • /
    • 2014
  • 회전형 탐촉자(RPC)는 증기발생기 전열관의 결함 탐지 및 크기 측정 목적으로 널리 사용되고 있다. 손상이 탐지된 전열관에 대한 건전성 평가는 비파괴검사에서 얻어진 열화의 크기 정보를 바탕으로 수행되기 때문에 검사기술의 성능은 전열관의 건전성 평가에 직접적으로 영향을 미치게 된다. 동일 전열관의 인접한 거리에 다중균열이 존재할 경우 검사 기술의 결함 분해능에 제약이 따를 수 있으며 그 영향이 클 경우 근접한 다중균열이 상대적으로 큰 단일균열로 평가될 수 있으므로 전열관의 구조건전성 평가에 오류를 유발할 수 있게 된다. 따라서 본 연구에서는 방전가공으로 균열을 모사한 인공결함에 대한 RPC 탐촉자의 결함 분해능을 관찰하고 전열관의 구조건전성 평가에 미치는 영향을 살펴보았다. 동일 직선상에 놓인 다중균열은 매우 근접한 거리까지 개별균열 식별이 가능하여 건전성 평가에 미치는 영향이 없는 반면, 인접한 거리에 평행하게 놓인 균열의 경우는 RPC 탐촉자의 분해능이 낮아서 부정확한 결함 크기 정보가 얻어지므로 결함관의 파열압력 예측에 영향을 미칠 수 있다.