• Title/Summary/Keyword: Hydraulic loading rate

Search Result 159, Processing Time 0.034 seconds

Effective Chemical Treatment of Biologically Treated Distillery Wastewater in Industrial Scale (생물학적으로 처리한 주정폐액의 효율적인 화학적 처리방법)

  • Nam, Ki-Du;Chung, In;Hur, Daniel;Park, Wan
    • Journal of Life Science
    • /
    • v.9 no.6
    • /
    • pp.692-697
    • /
    • 1999
  • For further removal of non-biodegradable CODs and color in biologically treated distillery waster water, we selected a chemical treatment with Fe(III) and cationic polymers and then another chemical treatment with Fenton reagent. We developed Pregenerated Bubble Flotation(PBF) to effectively remove the chemical sludge from each chemical reaction process. The flotation unit was constructed with hydraulic loading rate, 7 ㎥/$m^2$.hr. The CODMn and suspended solids (SS) in biologically treated distillery waste water were reduced by the first PBF from 310-1096 mg/L to 141-303 mg/L and from 160-990 mg/L to 48-385 mg/L, respectively. Again, after the Fenton reaction process, floated SS was skimmed off at the top of the flotation unit and the final effluent was directly discharged without any tap water dilution. The quality of final effluent can be below 40 mg/L-CODMn but IISan Distilery has been maintained effluent quality of 73 mg/L-CODMn and 10-80 mg/L-SS. The chemical cost was saved by more than 30% as compared with that of prior process.

  • PDF

Performance Evaluation of Anaerobic Bioreactors and Effects of Ammonia on Anaerobic Digestion in Treating Swine Wastewaters

  • Lee, Gook-Hee;Seo, Jun-Won;Kim, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.25 no.3
    • /
    • pp.195-201
    • /
    • 2006
  • The operational characteristics of anaerobic bioreactors in treating swine wastewater were evaluated upto hydraulic retention time (HRT) of 1 day and organic loading rate (OLR) of $5.1kg-COD/m^3{\cdot}d$ for 200 days. The bioreactors were effective in treating swine wastewaters with COD removal efficiency of $78.9{\sim}81.5%$ and biogas generation of $0.39{\sim}0.59m^3/kg-COD_r$ at OLR of $1.1{\sim}2.2kg-COD/m^3{\cdot}d$. The two-stage ASBF anaerobic bioreactors was effective in treating different characteristics of swine wastewaters since they showed high and stable COD removal efficiency at high OLR due to effective retention of biomass by media and staging. The effects of ammonia on anaerobic digestion were investigated by operating two-stage ASBF reactors using swine wastewaters as influent without and with ammonia removal at HRT of $1{\sim}2$ days and OLR of $2.2{\sim}9.6kg-COD/m^3{\cdot}d$ for 250 days. The COD removal efficiency and biogas generation of two-stage ASBF reactors was decreased by increasing influent ammonia concentrations to 1,580 mg (T-N)/L with increasing OLR to $6.3kg-COD/m^3{\cdot}d$, while those were increased by maintaining influent ammonia concentrations below 340 mg (T-N)/L by MAP precipitation with increasing OLR to $9.6kg-COD/m^3{\cdot}d$. Initial inhibition of ammonia on anaerobic processes was observed at a concentration of 760 mg (T-N)/L and the COD removal efficiency and biogas generation dropped to 1/2 at ammonia concentration ranges of $1,540{\sim}1,870mg$ (T-N)/L. It is essential to remove ammonia in swine wastewaters to an initial inhibition level before anaerobic processes for the effective removal of COD.

Study on the Wastewater Treatment by Floating Aquatic Plant System Using Water Hyacinth for the Industrial Complex in Rural Area (물옥잠을 이용한 수중처리방법에 의한 농공단지 폐수처리에 관한 연구)

  • 윤춘경;김형중;류재현;여운식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.3
    • /
    • pp.64-71
    • /
    • 1997
  • Floating aquatic plant system using water hyacinth was applied to examine feasibility as a wastewater treatment system for the industrial complex in rural area. The wastewater from the industrial complex does not likely contain toxic pollutants because the industries which generate wastewater with toxic compounds are not allowed to move in. Pilot plant was installed at Baeksuk Nongkong Danzi in Chunahn-City, Chunchungnam - Do , and field study was performed during summer and fall of 1996. Hydraulic loading rate was 0. $0.19m^3/m^2$.day. The effluent concentration of DO was higher than influent, and it implies that 0.6m depth reactor was reaerated enough to increase DO level. The influent concentration of BOD varied significantly from less than 30 to 120mg/${\ell}$ during the study period, however, effluent concentrations were generally lower than the water quality standard and removal efficiency was up to 85%. The influent concentration of COD also showed wide variation from less than 40 to 160mg/${\ell}$ and effluent concentration was higher than water quality standard when influent concentration was over l00mg/${\ell}$. The influent concentrations of T-N and T-P were lower than water quality standard and no further treatment was required, and these compounds were also removed in the system. Although some improvement and refinement are still required, overall* the floating aquatic plant system was proved to be feasible to apply to treat wastewater from industrial complex in rural area.

  • PDF

Early-Year Performance of the Sihwa Constructed Wetland for Stream Water Treatment (하천수 정화를 위한 시화인공습지의 초기 수질 정화능)

  • Kwun, Soon-Kuk;Lee, Kyung-Do;Cho, Young-Hyun;Kim, Song-Bae;Cheon, Gi-Seol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.1
    • /
    • pp.93-102
    • /
    • 2005
  • A prototype surface flow constructed wetland was built in the upstream area of Sihwa reclaimed tidal lands to improve the water quality of Lake Sihwa by treating severely polluted stream water. In this study, we monitored hydrology, macrophyte (Phragmites communis Trin,) growth, and water quality in the Banwol and Donghwa wetlands to evaluate their performance during the initial period after the completion of wetland construction, The average removal efficiency($\%$) in each wetland was relatively low compared with the performance data from the North America Wetland Treatment System Database (NADB), which mainly includes urban sewage-treatment wetlands. However, the average removal rates per unit area ($g/m^{2}/day$) were 0.72, 0.72 and 0.51 (BOD), 2,04, 2.46 and 0.70 (SS), 0.89, 0.43 and 1.09 (TN) and 0.02, 0.02 and 0.02 (TP) in the Banwol and Donghwa wetlands and NADB, respectively. The overall performance of the Banwol and Donghwa wetlands was within the expected range of the wetland system processes contributing the reduction of the pollutant load to Lake Sihwa during the initial period of wetland operation. Considering the low influent concentration, high hydraulic loading rate, and insufficient macrophyte growth since the wetland was constructed, better performance is expected if an improved operational scheme is adopted.

Improvement of Methanogenic activity in the Anaerobic Treatment of Wastewater with High Sulfate (고농도 황산염을 함유한 폐수의 혐기성 처리시 메탄균의 효율 향상을 위한 연구)

  • Shin, Hang Sik;Oh, Sae Eun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.10 no.2
    • /
    • pp.47-54
    • /
    • 1996
  • UASB reactor was operated for treating wastewater containing high sulfate to assess their performance, competition between sulfate-reducing bacteria(SRB) and methane-producing bacteria(MPB), and the change in the characteristics of microbial granules according to change of hydraulic retention time(HRT) in the reactor. The reactor was fed with a synthetic moderate strength wastes(glucose, 2000 mgCOD/l) containing high sulfate($2400mgSO_4{^{2-}}/l$). The organic loading rate(OLR) ranged from 1.5 to 3.0 gCOD/l.d as HRT maintained 15 to 30 hrs in the stage I. The COD removal efficiency was between 80 to 92%. During this period, methane yield rapidly decreased from 0.3 to 0.1 1 $CH_4$/gCODremoved. While sulfide concentration in the effluent increased from 80 to 200 mgS/l. This indicates that SRB becomes dominant over MPB at a relatively long HRT in the excess sulfate. When OLR of reactor maintained from 5 to 8 gCOD/l.d in the stage II, methane yield increased from 0.1 to 0.17 1 $CH_4$/gCODremoved regardless of decrease of COD removal efficiency. This indicates that SRB is more sensitive to the change of a short HRT than MPB. In the competition between SRB and MPB, about 30% of the removed COD was utilized by SRB at HRT of 30 hrs during the start-up period, while about 73% was used by SRB at HRT of 15hrs at the final step of second experimental stage. Whereas after shock exposure of OLR about 62% was utilized by SRB at HRT of 5hrs. It indicates that SRB is strongly suppressed by the wash-out of significant dispersed SRB since a large electron flow is distributed to the MPB. In addition, the granulation in the presence of high sulfate is unfavoured at a long HRT because of substrate transport limitations into MPB like Methanothrix spp. which is an important factor in the composition of the granules. Accordingly, granule sizes in the UASB reactor decreased with time due to weak network frame of granules by the decreased activity of MPB.

  • PDF

Performance Study on Pilot-scale Constructed Wetlands in order to Restore Contaminated Stream (오염하천의 정화를 위한 파일럿 규모의 인공습지 적용)

  • Kim, Seung-Jun;Choi, Yong-Su;Bae, Woo-keun
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.3
    • /
    • pp.546-556
    • /
    • 2006
  • The purpose of this study is to improve the polluted stream water quality by pilot-scale five different constructed wetlands (CWs). Cell 1 to 3 are newly designed 2SFCW (Surface-subsurface flow CW) with 1 to 3 flow shifters (FS) in the middle of the wetland system. Cell 4 and 5 are control CW (CCW), but Cell 5 is the same type as Cell 3. The FS, which converts the route of surface and subsurface flow between two wetlands connected in series, was able to enhance the treatability of TN via nitrification and denitrification and of SS due to filtration and sedimentation. The void fraction and dispersion number of Cell 1, 2 and 3 obtained from the RTD analysis were found to be 0.73 and 0.17, respectively. COD and TP removal efficiencies of Cell 1 to 3 were similar to that of Cell 4 and 5. SS removal efficiencies of Cell 1 to 3 and 5 with FS were 5-10% higher than that of Cell 4 without FS. TN removal efficiencies of Cell 1 to 3 were 3-14% higher than that of Cell 4 and 5. The average $R^2$ values of COD, SS, TN and TP obtained from nonlinear regression analysis were similar to the results of other researchers.

Performance Evaluation of ABR and ASBR for Anaerobic Methane Fermentation (ABR과 ASBR 형태에 따른 혐기성 메탄 발효 운전 성능 평가)

  • Lee, Chae-Young;Lee, Se-Wook
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.19 no.2
    • /
    • pp.49-54
    • /
    • 2011
  • This study was conducted to evaluate the performance of methane fermentation from effluent of hydrogen fermentation reactor in anaerobic baffled reactor (ABR) and anaerobic sequencing batch reactor (ASBR). Two reactors were operated at organic loading rate of $1.0kg\;COD/m^3{\cdot}d$ and hydraulic retention time (HRT) of 20 day. Methane production rates of ABR and ASBR for start-up periods were 0.04 L/L/d and 0.19 L/L/d, respectively, whereas maximum methane production rates of ABR and ASBR were 0.25 L/L/d and 0.31 L/L/d, respectively. Removal rates of chemical oxygen demand (COD) in ABR and ASBR for start-up periods were 89% and 92%, respectively. After startup periods, removal rates of COD and volatile solids (VS) in ABR and ASBR were maintained over 90%. The specific methanogenic activity (SMA) increased as microorganism acclimated to the substrate.

Effects of Hydraulic Rentention Time on Anaerobic Digestion of the Mixture of Nightsoil and Septic Tank Sludge (소화조(消化槽)의 수리학적(水理學的) 체류시간(滯留時間)이 분뇨(糞尿)와 정화조(淨化槽)슬러지 혼합물(混合物)의 혐기성소화(嫌氣性消化)에 미치는 영향(影響))

  • Lee, Kwang Ho;Yang, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.3 no.3
    • /
    • pp.117-127
    • /
    • 1983
  • An experimental research was performed employing the two stage anaerobic digestion of the mixture of the nightsoil and septic tank sludge to determine the effects of various hydraulic retention time of the digestion on chemical characteristics and treatment effeciency, thus determining the proper retention time. Results of the research are as follows, 1. Volatile-acid decreased as HRT increased. 2. Alklinity and ammonia-N tended to increase as HRT increased as did pH values, however, were observed to be constant at higher HRT values than 15 days. 3. The removal efficiencies of TBOD, TCOD and VS increased as HRT increased. 4. The removal efficiency of volatile solid decreased as VS loading increased. 5. It was observed that the rates of gas production were: 0.33 with HRT of 5 days, 0.58 with HRT of 15 days and $0.57m^3/kg$ VS fed/day with HRT of 25 days respectively. It is believed that the highest rate of gas production was at HRT of 15 days. 6. The sludge settling experiment showed that the minimum settling time required to ensure the desired underflow concentraton was estimated to be 8.6 days.

  • PDF

Application of anaerobic baffled reactor to produce volatile fatty acids by acidification of primary sludge (Anaerobic Baffled Reactor 공정을 이용한 1차 슬러지 산발효에 대한 연구)

  • Kwon, Se Young;Kang, Min Sun;Kim, Se Woon;Shin, Jung-Hun;Choi, Han-Na;Jang, Hoon;Cho, Jin Woo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.1
    • /
    • pp.13-23
    • /
    • 2014
  • A lab-scale Anaerobic Baffled Reactor (ABR) was applied to treat a primary sludge taken from a municipal wastewater treatment plant. In this experiment, acidogenic reaction was promoted by operating the ABR with short hydraulic retention time (HRT) to produce sufficient volatile fatty acids (VFA) instead of production of methane. The performance of ABR on the VFA production and total solids reduction was observed with different operating conditions with 2, 4, 6, and 8 days of HRT. Corresponding organic loading rates were 6.7, 3.4, 2.2, and $1.6kgCOD_{cr}/m^3{\cdot}day$. As HRT increased the removal rate of TCOD was also increased (82.5, 84.2, 96.9, and 95.9 % in average for HRT of 2, 4, 6, and 8 days, respectively) because the settlement of solids was enhanced in the baffle by the decrease of upflow velocity. At HRT of 2 days the average concentration of VFA in the effluent was measured at $1,306{\pm}552$ mgCOD/L corresponding to 107 % increment as compared to the VFA concentration in the influent. However, as HRT increased VFA concentraiotn was decreased to $143{\pm}552$ mgCOD/L at HRT of 8 days. The reduction rates of total solids were 12.2, 26.5, 24.8, and 43.0 % for HRT of 2, 4, 6, and 8 days. As HRT increased the hydrolysis of organic particulate matters in the reactor was enhanced due to the increasing of solids retention time in the baffle zone with low upflow velocity in long HRT condition. Consequently, we found that a primary sludge became a good source of VFA production by the application of ABR process with HRT less than 4 days and the 12-26 % of total solids reduction was expected at these conditions.

Effects of Rotational Speed and Hydraulic Residence Time on the Ammonia Removal of a Rotating Biological Contactor (RBC) (회전속도와 수리학적 체류시간이 회전원판식(Rotating Biological Contactor;RBC) 여과조의 암모니아 제거에 미치는 영향)

  • 오승용;조재윤;김종만
    • Journal of Aquaculture
    • /
    • v.16 no.3
    • /
    • pp.142-150
    • /
    • 2003
  • Performance of a biological filter, the rotating biological contactor (RBC), is affected by rotational speed and hydraulic residence time (HRT). A RBC with a disc diameter of 62 cm, total surface area of 48.28 $m^2$, volume of 0.34 ㎥, and submergence ratio of 35.4% was tested for the combinations of five rotational speeds (1, 2, 3, 4 & 5 rpm) and three HRT (0.5, 1.0 & 2.0 hr) to find out the maximum removal efficiencies of total ammonia nitrogen (TAN) and nitrite nitrogen of a simulated recirculating aquaculture system. Ammonia loading rate in the system was 25 g of TAN/ ㎥. day. Removal efficiencies were checked when TAN concentrations in the system stabilized for 3 days in each treatment. The concentration of TAN in the system decreased with increasing rotational speed of the RBC up to 4 rpm in all HRT (P<0.05). At the rotational speed of 5 rpm, the efficiencies decreased in all HRT (P<0.05). When the rotational speeds were 1, 2, 3, 4, and 5 rpm, TAN concentrations in the system were 1.35, 0.94, 0.69, 0.66, and 0.76 mg/L at the 0.5 hr HRT, 2.86, 1.18, 0.96, 0.87, and 1.11 mg/L at the 1.0 hr HRT, and 5.30, 2.44, 1.99, 1.77, and 2.01 mg/L at the 2.0 hr HRT, respectively. The TAN removal efficiencies of the RBC at the rotational speeds of 1, 2, 3, 4, and 5 rpm were 32.9, 49.5, 65.1, 72.9, and 62.9% in 0.5 hr HRT,33.1, 74.1, 87.1, 95.8, and 78.5% in 1.0 hr HRT, and 35.5, 76.7, 89.6, 97.0, and 85.5% in 2.0 hr HRT, respectively. TAN removal efficiency of RBC per pass increased with increasing HRT. However, TAN concentration in the system also increased. The best operating condition among the treatments was obtained at the treatment of 0.5 hr HRT and 4 rpm (P<0.05). The TAN concentration was 0.66 mg/L. Concentrations of nitrite nitrogen (NO$_2$$^{[-10]}$ -N) in the system decreased with increasing rotational speed in all HRT while that in the system increased with increasing HRT in all rotational speeds. The ranges of NO$_2$$^{[-10]}$ -N concentrations at HRT of 0.5, 1.0, and 2.0 hr in the system were 0.26~0.32, 0.31~0.56, and 0.43~l.45 mg/L, respectively. The ranges of daily removal rates of TAN in this system were 20.03~23.0 g TAN/㎥ㆍday and those of nitrite nitrogen were 19.65~30.25 g NO$_2$$^{[-10]}$ -N/㎥ㆍday.