• Title/Summary/Keyword: House Construction Projects

Search Result 51, Processing Time 0.024 seconds

A Study on the Satisfaction Degree of Clients on the Supervision in the House Construction Work - Focusing in Taegu, Kyungbuk Province - (주택건설공사 감리의 고객만족도에 관한 연구 -대구·경북지역을 중심으로-)

  • Lee, Ho;Lee, Taick-Oun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.291-298
    • /
    • 2007
  • In 1994, the house construction work was separated from design part to prevent incomplete work and to improve quality. During that time, the supervision in the house construction work has made a great development in the quantity phase, but there is no study case about the satisfaction degree of clients on the supervision job. This study presents the improvement schemes of the supervision job rationality, the revision of supervision system and supervisor's improved construction management ability. also, This paper aims at advancing our construction field and enhancing competitive power by seeking for solutions to problems and improving current system to a reasonable supervision in the house construction work comparing and analyzing by questionnaire in Taegu, Kyungbuk area. The further study will be needed about the whole Korean construction market.

  • PDF

Development of Integrated Work Breakdown Structure for Project Management Information System in Multi-Family House Projects (공동주택 건축공사의 효율적인 PMIS 운용을 위한 통합WBS 개발)

  • Park, Ji-Hyun;Shin, Joo-Yong;Kim, Hae-Gon;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.801-804
    • /
    • 2007
  • Development of construction project management information system is accelerated because information management system has become more important by recent complicated and large-sized construction industry. There are many problems to operate PMIS efficiently because no standardized WBS exist in current. This study has identified the problems of WBS in building construction of multi-family house projects with 4 public and private organizations by interviews and compared each WBS. From those facts, this research presents the integrated WBS and the improved application form in PMIS.

  • PDF

A Study on the Spatial Characteristics in the Residential Designs by Vilhelm Wohlert - Focusing on Program Composition, Spatialization, Multidimensional Experience - (빌헬름 볼러트의 주택 작품에 나타난 공간적 특성에 관한 연구 - 프로그램 구성, 공간구축, 다차원적 경험을 중심으로 -)

  • Kim, Jong-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.3
    • /
    • pp.3-10
    • /
    • 2012
  • Vilhelm Wohlert is the Danish architect who designed Louisiana Museum of Modern Art near Copenhagen. Because of Louisiana Museum's popularity, Vilhelm Wohlert's name was started to be aware since 1990s. Although he is a well-known architect in Denmark, unfortunately his name is unknown in other countries. He designed various design projects from small scale furniture design to large scale museum and public projects. There are three programmatic categories in his architecture: exhibition programs including Louisiana Museum, residential program including private houses, and public programs including churches and schools. This thesis focuses on his residential design projects. Even though he designed a multi-family houses, Wohlert's house design consists of mainly one-off large private houses located in a nice natural environment. In chapter 3, the general history of his house projects was studied. Among them, the first exhibition house for Forum was explained more deeply to show Wohlert's early house design philosophy. In chapter 4, three built house projects were analyzed in detail. Analytical diagrams were used to show the key elements in the residential space. They are program composition, circulation, spatialization elements, final construction. His buildings have been compared with Alvar Aalto, Frank Lloyd Wright, and other Scandinavian architects. But there are some major differences that make Wohlert's design unique. In chapter 5, the case analysis results were summarized together to highlight the specific design characteristics found in Wohlert's residential design process. The universal spatial quality found in his residential projects can be applied in contemporary spatial designs.

  • PDF

Integrated CAD System for Ship and Offshore Projects

  • Suh, Heung-Won;Lee, Sung-Geun
    • International Journal of CAD/CAM
    • /
    • v.6 no.1
    • /
    • pp.41-48
    • /
    • 2006
  • Nowadays major shipbuilding companies are trying to expand their business not only to shipbuilding but to offshore projects as well. DSME is one of them. DSME is trying to set up a flexible design and construction environment for shipbuilding and offshore construction in a single shipyard. The shipbuilding and offshore projects, however, have their unique technology but they need to be designed and constructed in one site. To support this new requirement, DSME has developed an integrated CAD system for ship and offshore projects. In this integrated design environment, the designers can design commercial ships and offshore projects in a flexible manner. Concurrent design is very important for ship and offshore design. As compared to the complexity of the product, the design period is quite short. In effect, the design system for the ship and offshore project has to support concurrent design. One essential point of concurrent design environment is a product model based design system. DSME has developed and implemented the 3D product model concurrent design environment based on Tribon M3. Tribon is a widely used CAD system in shipbuilding area that is developed by Tribon Solutions. DSME has both customized the Tribon system and developed in-house application systems to support its own design and production procedures. All the design objects are modeled in one common database to support concurrent design and accurate production. The major in-house development focused on the modeling automation and automatic drawing generation. During the drawing generation process many of the additional production information are also extracted from the 3D product model. In addition, several applications and functionalities have been developed to apply the shipbuilding based Tribon M3 system to offshore projects. The development of shape nesting, tubular connection, isometric drawing, grating nesting systems are the typical.

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction (공동주택 철근콘크리트 공사 작업지연요인에 관한 연구)

  • Lee, Hyun-Chul;Lim, So-Yean;Yeo, Sang-Ku;Go, Seong-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.55-61
    • /
    • 2009
  • In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.

The Effect on the Granodiorite Suspension Coated Indoor Finishing Materials for Reduction of TVOC Emissions (실내 마감재료의 TVOC 방출 저감을 위한 화강섬록암 현탁액 도포효과)

  • Lee, Jong-Gyu;Kim, Ji-Hyun;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.93-99
    • /
    • 2008
  • The environment draws attention in the global community and a growing number of Koreans have interest in improving the quality of life, the importance of house environment has attracted the attention of the public. Against this backdrop, constructors have unveiled environmentally -friendly projects. However, they failed to establish people-oriented environment by being occupied with maximizing profitability through the improvement of brand image and caused sick house syndrome that has recently made controversy. In this regard, the study analyzed the mechanism of discharge of TVOC, one of the sick house syndrome-causing materials, that affects IAQ and its characteristics and examined the effect that granodiorite has on reduction of the discharge of TVOC in order to minimize damage. Experimental sample consisted of interior finishing materials frequently used in ceiling, wall and floor and adhesives used at a time of construction, and the TVOC of building materials was measured through the use of septum bottle unlike In the existing chamber method. Measures to counter the sick house syndrome were suggested by reducing the possible damage from the stage of selection of building material and by figuring out the effect that the granodiorite has on reduction of the discharge of TVOC.

Analysis of significant factors for successful BIM technology application to Korean traditional house projects (한옥 건설 프로젝트에서의 BIM 도입 활성화를 위한 주요 요인 분석)

  • Jang, Ha-Ra;Lee, Joo-Sung;Seo, Hee-Chang;Oh, Jung-Keun;Kim, Jae-June
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.71-81
    • /
    • 2013
  • Recently, Korean Traditional House is being reconsidered as a alternative and eco-friendly residential housing. With these flows, government and industry actively studies the modernization and industrialization of Korean Traditional House. Apply for BIM as a way of modernization and industrialization of Korean Traditional House, research has been actively conducted. Korean Traditional House is building that is assembled by individual Component Therefore it is very useful for modernization of the Korean Traditional House to design Korean Traditional House With BIM. Which is the management technology that produces and distributes information of the architecture. But compared with the effect, the use of BIM is sluggish in the construction. Therefore, In this study after surveying about lowly using BIM on point of AEC(Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using BIM.

North Korean Housing Planning Trend through Analysis on North Korean Architectural Media (북한 건축 전문매체 분석을 통한 살림집 계획 동향)

  • Choi, Sang-Hee
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.223-232
    • /
    • 2017
  • The purpose of this study is to identify the supply status and planning trend of North Korean housing through analysis on the North Korean architecture specialized media data. The flat composition is changing and the living room is becoming the center of the houses. Also, in the urban areas, the standard apartment type is four apartments in a row and the plan form is getting diversified into circle type, Y type, and irregular type. On the other hand, in the rural areas, two houses in a row and single house are typical and the change in planning scale and space structure are not substantial. Since the 2000s, design changes have been made to emphasize the third dimensional structure of buildings such as the elliptical houses and L-shaped houses. Furthermore, 8~10 households are located on one floor which leads to the tendency of the building enlargement. In terms of house size, a square concept was introduced to replace the initial 2~3 room concept and the basic module of the room planning the 3 room house based on $3m{\times}3m$. However, there seems to be no standard house size, and the house size may differ depending on the social classandregion. In the early 1980s, when there was focus on the apartment complex construction, the high-rise apartment buildings of 30~40 floors was planned. However, during the Pyongyang redevelopment project, apartments of more or less than 10 floors were built and row-houses of more or less than 4 floors were built. In terms of the complex scale, a lot of small complexes of around 300 households are emerging after 2010. The construction projects are mainly limited to specific regions such as Pyongyang and Samjiyeon, and also limited to specific classes such as the workers and soldiers initially and the scientists lately. In addition, living boundary composition and ancillary facilities for sufficient green area ratio securement and the people of North Korea are maintained consistently. In recent years, the specialized floor planning such as solar house and the house for the disabled people, framework houses for redevelopment business, and multi-storied house construction technology are also emerging.