• Title/Summary/Keyword: Hospital Construction Project

Search Result 27, Processing Time 0.025 seconds

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

A Case Study of the Construction Project Management Applied to New Catholic Medical Center Construction Project ('가톨릭중앙의료원 새병원 및 성의회관 건립공사'CM수행사례 소개)

  • Kim, Hyo-Seong;Park, Young-Soon;Kim, Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.37-44
    • /
    • 2006
  • The construction management has been applied for the first time in South Korea on the New Catholic Medical Center. The construction of the project has been controlled and managed by the CMr, as Client's agent from the very beginning stage of construction when the block plan is being established by the Contractor's design consultant. As CMr generally gets involved in the project throughout the entire construction phases on behalf of the Client, Parsons Brinckerhoff has been delivering high quality solutions that satisfy the Client's requirements in Pre-construction stage and also brought practical and innovative engineering solutions in a time and cost effective method. The objective of this case study is to describe works executed by CMr in Pre-construction stage ; and, analyze the positive effects by applying CM to the project. Therefore, it is anticipated that CM procedure might be introduced and adapted to the up-coming hospital construction projects.

  • PDF

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF

A Study of Risk Management in Major Hospital Construction Projects (효율적인 리스크 관리방안에 관한 연구)

  • Kim Sang-Il;Lee Jae-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.242-245
    • /
    • 2003
  • Most engineering tasks require collaboration between many users in major hospital Construction Projects that have many risks. Loss of cost and change orders occurred in factors such as information exchange, misunderstandings, advanced Technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. Each part of the major hospital construction projects have been rapidly changed technology of equipments. Therefore it is a major challenge to make a high level of communication and to have mutual understanding. The objective of this paper is to reduce risks for the design process and construction process of hospital projects.

  • PDF

Improvement of Environmental-friendly Hospital Design on Underdeveloped Countries - Focused on Bangladesh -

  • Jang, Duk Chan
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.43-52
    • /
    • 2014
  • Hospital design technology of Korea has recently been exported to underdeveloped countries through the EDCF business. This business reflects our high technology of the hospital design and the regional features that reflect the natural environments, the architectural features and the architectural technology of underdeveloped countries. In accordance with the trend of the global environmental-friendly design market, introduction of environmental-friendly design is needed in the project of hospital for underdeveloped countries. A result of examining the Bangladesh case, the hospital design for the underdeveloped countries already contains a lots of environmental-friendly design elements which have lots of effect. In addition, these environmental elements already contains the advantage and efficiency of operation. Thus, for the success of the hospital design project of the international assistance business, it is necessary actively to discover the environmental-friendly design elements of the region, and to survey the environmental-friendly construction of the region and to make the guidelines of environmental-friendly hospital design during the feasibility study phase.

Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA (ODA 지원 베트남 중부 꽝남성 종합병원의 거주후 평가)

  • Kwon, Soon Jung;Yu, Yeo Kyoung;Kim, Jihyun;Bang, Seol Ah
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.1
    • /
    • pp.39-49
    • /
    • 2016
  • Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.

Digital-hospital Research on the Factors that Lead to the Success of the Overseas-hospital Export Business through an Analysis of the Bidding Documents (해외병원 입찰분석을 통한 디지털병원 수출사업 성공요인)

  • Cha, Maengkyu;Kim, Jung Ok;Yu, Kiyun
    • KIISE Transactions on Computing Practices
    • /
    • v.23 no.6
    • /
    • pp.359-370
    • /
    • 2017
  • In overseas-hospital construction, the digital hospital is a trend that is based on the developments of the information and communication technologies, state-of-the-art medical equipment, smart health, and telemedicine. Along with the increasing proportion of IT, this has resulted in the spreading of the concept throughout city-like hospitals and their transformation into digital hospitals. In the hospital-construction business, IT is a key element that will link the modernization of the mechanical, electrical, and equipment systems, construction, and medical equipment for efficiency maximization through integration. The purpose of this study is the analysis of the market-expansion success factors through the construction of a success-story-based, IT-driven overseas-hospital business. The digital-hospital concept and the development process are analyzed through a literature review, and the success factors are analyzed in terms of the cost, time, and quality that are proposed in the project-management body of knowledge. The main contributions of this study regarding the success factors are as follows: First, a cost-side need exists regarding the establishment of strategic-value engineering in terms of increasing the value from the perspectives of the IT and operational infrastructures; second, in terms of the construction time, all of the hospital systems must comply with the established deadlines for the integrated test and commissioning; and lastly, in terms of quality, it is important to ensure that the System Integration digital-hospital services are delivered according to the user requirements.

An Evaluation of the Importance of Risk Factors for the General Hospital Remodeling Approached by Analytic Hierarchy Process (AHP) (AHP 분석을 통한 종합병원 리모델링 공사의 리스크 요인 우선순위 평가)

  • Moon, Seong Joo ;Go, Seong Seok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.30 no.3
    • /
    • pp.45-56
    • /
    • 2024
  • Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.