• 제목/요약/키워드: Historical Cost

검색결과 249건 처리시간 0.033초

농어촌정비사업 공종별 실적공사비 적산시스템개발 (Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects)

  • 김현영;이정재;김영기;오상원;전효묵
    • 한국농공학회지
    • /
    • 제40권3호
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

실적공사비 적산 시스템 운영을 위한 실적 자료 관리 시스템 개발(구조 및 재료 \circled1) (Development of the Historical Data Management System for using the Cost Estimate System)

  • 정연철;배연정;윤성수;이정재
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2000년도 학술발표회 발표논문집
    • /
    • pp.239-245
    • /
    • 2000
  • This study is aimed to develop the historical data management system named "ACON"(Actual COst Network system) which can be used for collecting, analysis and modification of the historical data. ACON_Local is used for collecting the historical data at each spot place. It redueces the work potential of managers, spending time and cost. ACON_Analysis is to analyze the collection , modifies the data′s error and updates the historical database. ACON_Network is developed to transfer data from ACON to Web server or opposites. The proposed model, ACON, provide the easy way for the cost estimate system, "HiCOMS" to collect, analyze and modify the historical cost evaluated data, which is used to compose the historical data base.

  • PDF

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

대·소규모 토목공사의 실적공사비 비교 분석 (Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works)

  • 홍성호;신주열;김창학;이동욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • 실적공사비 제도는 2004년부터 도입된 제도로서, 과거의 유사 공사의 계약단가를 토대로 공종별 단가를 파악하여 예정가격을 결정하는 방식이다. 이러한 실적공사비 단가는 매년 2회 한국건설기술연구원에서 발표하고 있다. 소규모 공사의 공사비 단가는 작업단위당 생산비용 증가, 장비 및 노무비 등 상승으로 인해 대규모 공사보다 높을 수밖에 없는 것이 건설공사의 특성이다. 그러나 실적공사비 단가가 공사의 규모와 무관하게 일률적으로 적용되고 있어 문제점으로 대두되고 있다. 본 연구에서는 이러한 실적공사비 제도의 문제점을 파악하기 위해서 대 소규모 토목공사의 실적공사비를 비교 분석하였으며, 소규모 토목공사의 실적공사비가 대규모 토목공사에 비해 21.8% 높은 결과가 도출되었다.

물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안 (Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation)

  • 정기창;김영애;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.540-545
    • /
    • 2008
  • 본 연구의 목적은 물가변동에 따른 실적공사비 등락률 산출 과정의 문제점과 개선방안을 제시하고자 수행되었다. 이 연구를 수행하기 위해서, 실적공사비 내역이 포함된 현장을 표본으로 실적공사비적용 방식 및 품셈적용 방식으로 물 가변동률을 산출하여 문제점을 분석하고 물가변동금액 산출에 대한 개선방안을 제안하였다. 이에 따른 연구의 결과는 다음과 같다. 1) 전체공사 내역 중 실적공사비 단가로 작성된 내역에 대해선 품셈 방식을 준용하여 물가변동 부분을 산출하는 것이 더 적정한 것으로 나타났다. 2) 산출방식에 혼선이 없도록 관련 법령 및 규정에서의 실적공사비 등락률 산출부분을 품셈으로 풀어 산정하도록 일부개정이 이루어져야 하는 것으로 나타났다.

  • PDF

유도무기 획득단가 추정 모델 개발에 관한 연구 (A Study on Developing the Acquisition Unit Cost Estimating Model of the Guided Weapon System)

  • 김용현;이용복;정원일;김동규;강성진
    • 한국군사과학기술학회지
    • /
    • 제15권5호
    • /
    • pp.565-576
    • /
    • 2012
  • Cost estimates are necessary for government acquisition program to support decisions about funding, to develop annual budget requests and to validate resource requirements at key decision points. Many researches have been done about cost estimating technique recently. Parametric cost estimating models based on CERs(Cost Estimating Relationships) have been mainly used using regression method with historical data. However, there are many restrictions in developing Korean version CERs because the number of data points are too small. Specially, data collection and data management system are unstable in Korean defense environment, when developing CERs. In this research, we analyzed the historical data, and found some cost drivers in guided weapon system area. We developed the Acquisition Unit Cost CER using the regression to remove multicollinearity in the historical data. So we could overcome the restriction of the insufficient sample number. This research as a first attempt is meaningful in terms of obtaining our own Acquisition Unit Cost CER using historical cost and physical characteristic in Korean development environment.

실적공사비에서 전기공사의 적정이윤율 분석에 관한 연구 (A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works)

  • 서순석;장영길;김광곤;현소영;왕용필;안준호;박민영;손홍관
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.2129_2131
    • /
    • 2009
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower, if current rate of profit (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

전기분야 실적공사비 적산제도에서 이윤산정 분석 및 제안 (A Profit Calculating Analysis and a Proposal of Estimation System of Historical Cost Data in the Electrical Construction Works)

  • 서순석;임승학;권용만;김광곤;김재현;손홍관;박인표
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.155-159
    • /
    • 2007
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. It is expected that the purpose of the introduction would be evaluated considering the long-term development of domestic construction industry. In article 3, paragraph 4 of the planning criteria of estimated cost of financial regulation related to government contract rule, the profit estimated by historical cost data indicates sales profit and it is calculated by multiplying the sum of direct cost, indirect cost and general overhead by rate of profit. Finally, it is said that rate of profit cannot exceeds 10%. However, there are a lot of constructions for electronic equipment in the electronic construction and the proportion of government furnished material is very high, not like engineering works or constructions. Therefore, as the proportion of material cost over direct cost is relatively lower if current rate of exceeds (10%) is applied, there would be a wide difference of cost in the items of profit under the estimation system of historical cost data. This paper was conducted to examine estimation methods of the items of profit under the estimation system of historical cost data and suggest reasonable applications.

  • PDF

공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구 (A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects)

  • 유용환;이규현;김종원;최인성
    • 한국건축시공학회지
    • /
    • 제4권4호
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

한국 무기체계 개발 실적을 고려한 연구개발 비용추정관계식 개발 (Developing an R&D CER Using Historical Defense Weapon System Data in Korea)

  • 어원재;이용복;강성진
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.55-62
    • /
    • 2010
  • Currently, cost estimation is very important to the government acquisition programs to support decisions about funding and to evaluate resource requirement as key decision points. Parametric cost estimating models have been used extensively to obtain appropriate cost estimates in early acquisition phase. However, they have many restrictions to ensure the cost estimating result in Korean defense environment because they are developed in the U.S.A. environment. In order to obtain a good R&D cost estimate, developing our own CERs (Cost Estimation Relationships) using historical R&D data is essential. Nevertheless, there has been little research to develop our own CERs. In this research, we established a CER development process and found some cost drivers in the historical movement weapon system R&D data. The R&D CER is developed using the PCR(Principle Component Regression) method to remove multicollinearity among data and to overcome the restriction of the insufficient number of sample. At least, this research is meaningful as a first attempt in terms of defining the CER development process and obtaining our own R&D CER based on the historical data in Korean weapon system R&D environment.