An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

Improvement of Construction Cost Index against the Change of National Basic Statistic (국가 기초 통계자료 환경변화에 따른 건설공사비지수 개선)

  • Kang, Taikyung;Baek, Seung-Ho;Kim, Chang-Won;Cho, Hunhee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.21-29
    • /
    • 2015
  • Construction cost index (CCI) has been published for last 10 years, it's contributed to update the historical cost data, analysis cost fluctuation and evaluate the market price for construction works with direct or indirect manner. CCI is a secondary or processed statistics using the basic statistics of input output table (IO table) and producer price index (PPI) from the Bank of Korea (BOK). So once the basic statistics change, it is required to modify the calculating model of CCI. Recently the BOK changed some fundamental principles and the base year (from 2005 to 2010), that can be used in IO table and PPI. This research analyzed the recent revision of basic statistics and their impacts on CCI, and improved the previous CCI model in response to it. Also the validity of new CCI was verified by analyzing the items and weights utilized in CCI and comparing the related index.

A Study on the Improvement of Historical Data For Knowledge Management in Construction Project (지식관리(KM)를 위한 건설공사 실적자료관리 개선방안 연구)

  • Lee Tai Sik;Song Jae Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.468-471
    • /
    • 2001
  • The importance of early project planning is broadly recognized for construction projects. From the planning step, If extensive historical data related with the project is applied effectively, It can be major resource for estimating cost and project scope. However, The accumulation, analysis, and application of historical data is not sufficient in Korea. So useful information of construction project has disappeared. In order to solve the problems, Project Historical Data Management Systems is need to be developed. The purpose of this study is to analyze current problems and to find the method to utilize historical data in similar project.

  • PDF

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.