• Title/Summary/Keyword: Highway construction

Search Result 861, Processing Time 0.034 seconds

TEST OF A LOW COST VEHICLE-BORNE 360 DEGREE PANORAMA IMAGE SYSTEM

  • Kim, Moon-Gie;Sung, Jung-Gon
    • Proceedings of the KSRS Conference
    • /
    • 2008.10a
    • /
    • pp.137-140
    • /
    • 2008
  • Recently many areas require wide field of view images. Such as surveillance, virtual reality, navigation and 3D scene reconstruction. Conventional camera systems have a limited filed of view and provide partial information about the scene. however, omni directional vision system can overcome these disadvantages. Acquiring 360 degree panorama images requires expensive omni camera lens. In this study, 360 degree panorama image was tested using a low cost optical reflector which captures 360 degree panoramic views with single shot. This 360 degree panorama image system can be used with detailed positional information from GPS/INS. Through this study result, we show 360 degree panorama image is very effective tool for mobile monitoring system.

  • PDF

Lifetime Prediction of Existing Highway Bridges Using System Reliability Approach (실제 교량의 시스템 신뢰성해석에 기초한 수명예측)

  • Yang, Seung Ie
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.2
    • /
    • pp.365-373
    • /
    • 2002
  • In this paper, the system reliability concept was presented to predict the lifespan of bridges. Lifetime distribution functions (survivor functions) were used to model real bridges to predict their remaining life. Using the system reliability concept and lifetime distribution functions (survivor functions), a program called LIFETIME was developed. The survivor functions give the reliability of component at time t. The program was applied to an existing Colorado state highway bridge to predict the failure probability of the time-dependent system. The bridge was modeled as a system, with failure probability computed using time-dependent deteriorating models.

A Study of Improvement Method and Analysis of Type of Revegetation Measures of Rock Slopes (비탈면 녹화공법의 유형분석과 개선방안 연구)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.5
    • /
    • pp.22-29
    • /
    • 2002
  • This study was conducted to suggest develop revegetation methods and to classification of cutting-rock slopes revegetation type. The data was collected from pre-experienced data, reports and journal. Also research result was reflected from field research for the conditions of construction, vegetation types and field conditions. As the result of analyze, the factors affecting the plant coverage rates of cutting-rock slopes were period of construction, revegetation methods, slope gradient and slope length. Classification of cutting-rock slopes revegetation type was fourth from material of revegetation measures and spray type. It is recommended to adjust the proposed factor as environment, field condition and characteristic related with revegetation measures on slopes for the presentation of revegetation standard.

Study on Application of Criteria of Lateral Flow in Soft Soils (측방유동 판정기준의 적용성 연구)

  • Chae, Young-Soo;Moon, Han-Joong;Kim, Dae-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.2
    • /
    • pp.219-223
    • /
    • 2006
  • In this paper, the criteria of the lateral displacement in soft soil due to embankment were evaluated. The lateral displacement was measured at a pier structure in a new harbor construction site, and the measurement was compared with the criteria. The results by the measurement such as the critical pressure causing lateral movement in terms of undrained strength, the lateral movement index by Japan Highway Co., the lateral displacement index by Japan Construction Ministry, the modified index by Korean Highway Co. were estimated to be lower than the respective index values.

  • PDF

WEB FRONT-END COMPUTING RELATIONAL DATABASE SYSTEM FOR ITEM-LEVEL PRELIMINARY HIGHWAY COST ESTIMATES

  • Jui-Sheng Chou ;James T. O'Connor ;Khali R. Persad ;Wai Kiong Chong
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.509-514
    • /
    • 2005
  • In recent years, use of the web technologies and on-line process has immensely swapped single-user platform practice. This study attempted to develop preliminary cost estimating program by means of Web technologies based on statistical modeling results. A prototype Web-based Preliminary Item-Level Cost Estimating System (WBPILCES) using open source software was developed as an on-line estimating tool in this research. The primary objective is to study the possible flexibility of implementing a centralized information system that will be maintained by the Texas Department of Transportation (TxDOT) IT division. The full-scale deployment of proposed information architecture is expected to seamlessly integrate with legacy database system currently used by TxDOT so as to streamline data storage, cost growth tracking and estimates documentation.

  • PDF

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.