비재하 내화시험에 의한 섬유혼입 고강도 콘크리트 Mock-up 기둥의 내화성능 평가 (Evaluation of Fire Performance for High Strength Concrete Mock-up Column with Fiber by Unloaded Fire Test)

  • 송영찬;김용로;김욱종;이도범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.97-100
    • /
    • 2009
  • Fire resistance properties and mechanical properties of high strength concrete mock-up column using organic fiber by KS F 2257 Methods of fire resistance test for elements of building construction and compression test was investigated for application of precast concrete column method of high rise building in this study. As a test result, it was appeared that ECC permanent form is available as fire resistance method of high strength concrete and new precast concrete construction method for facilitating construction of high rise building.

  • PDF

초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구 (A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings)

  • 김광희;김재엽;서덕석;안성훈;최희복;정병원
    • KIEAE Journal
    • /
    • 제7권2호
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.

초고층고층 건축물의 개구부에 대한 화재안전 설계방법 조사 (A Study on the Fire Safety Design Methods of Opening in High-rise Building)

  • 권영진;진승현;이병흔
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.8-9
    • /
    • 2018
  • In recent years, the fire risk in the aged housing facilities in high-rise building has been closing up due to the fire in the Grenfell Tower. In the case of these high-rise residential facilities, fire cases of residential facilities such as Uijeongbu Apartment Fire The fire hazard has been reexamined mainly. Especially, the fire of these residential facilities is very closely related to the window, so measures are needed. On the other hand, in Korea, there is almost no fire safety measures against these openings. Therefore, this study suggests improvement measures by comparison with advanced countries based on fire safety measures for domestic windows.

  • PDF

중국 Top-Down 공법의 특징과 시공사례 분석 (Characteristics and Case Analysis of Top-Down Construction in China)

  • 방광수;임홍철;이해출;송지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.41-44
    • /
    • 2009
  • Top-Down construction is becoming a popular construction method in China as there is a growing need for building high-rise structures in crowded urban areas. This paper deals with the explanation and analysis of characteristics of Top-Down construction in China. In China, usually construction site is relatively large or sometimes huge compared to that in Korea. Thus, as the high-rise portion of the building needs to be constructed first and fast, island method is used at the center p망t of the building. In the meanwhile, the remaining area of the building is constructed using Top-Down method to provide working area for equipments and workers. Also, the case studies of construction examples are provided in this paper. The purpose of this paper is to promote international understanding and interaction between neighborhood countries for the utilization of Top-Down construction.

  • PDF

ECC 영구거푸집의 내화성능 및 역학적 특성에 관한 실험적 연구 (An Experimental Study on the Fire Resistance and Mechanical Properties of ECC Permanent Form)

  • 김용로;송영찬;오재근;김재환;김욱종;이도범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 산업계
    • /
    • pp.75-78
    • /
    • 2009
  • It was investigated fire resistance properties and mechanical properties of high strength concrete column using ECC(Engineered Cementitious Composites) permanent form by KS F 2257 Methods of fire resistance test for elements of building construction and compression test for application of precast concrete column method of high rise building in this study. As a test result, it was appeared that ECC permanent form is available as fire resistance method of high strength concrete and new precast concrete construction method for facilitating construction of high rise building.

  • PDF

Design Considerations for Concrete High-Rise Buildings

  • Chung, Kwangryang;Park, Chulho;Kim, Dohun
    • 국제초고층학회논문집
    • /
    • 제5권3호
    • /
    • pp.187-193
    • /
    • 2016
  • Busan's Haeundae Resort project, which is currently being constructed by POSCO E&C, comprises the 101-story Landmark Tower and two 85-story residential towers. Presently, foundation and basement construction is complete, with a final completion date set for 2019. Considerations about the construction and design of the three reinforced concrete high-rise buildings will be discussed in this paper.

국내 고층 주상복합 건물의 구조적 특성에 관한 조사 연구 (An Investigative Study on the Structural Characteristics of High-Rise Complexes in Korea)

  • 강석원;이성호
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.137-144
    • /
    • 2003
  • Recently, the interest in a complex building increases rapidly in Korea. High-rise complex is not simply the combination of a residential apartment and a business office as previous but a building with the object of the convenience of the residents familiar with city-life style through adapting the high class life style and new residential culture to the business space, and the efficiency in using the limited building site in the town. This study presents an exploratory analysis focusing the structural system with the help of the extensive survey of the construction site in Korea, and aims a guideline for the structural design and construction of high rise complex. Through the survey, change and development in the design and the construction can be seen as the height and size of the complex grow. It is almost indispensable to design a structural system against lateral forces like earthquake or wind, which is usually measured by story drift ratio or story displacement. Improvement of the structural materials and their usages is also included for the efficiency of the structural system. Useful slab-beam system contributing to the decrease of the story height is still a concern.

Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • 국제초고층학회논문집
    • /
    • 제4권3호
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

Prediction of Time-dependent Lateral Movement Induced by Differential Shortening in Tall Buildings Using Construction Stage Analysis

  • Ha, Taehun;Kim, Sangdae;Lee, Sungho
    • 국제초고층학회논문집
    • /
    • 제6권1호
    • /
    • pp.11-19
    • /
    • 2017
  • High-rise buildings move during construction due to time-dependent material properties of concrete (creep and shrinkage), construction sequences, and structural shapes. The building movements, including vertical and horizontal displacements, result from the sum of axial and lateral deformation of vertical members at each level. In addition to the vertical shortenings, the lateral movement induced by differential shortening can have adverse effects on the construction tolerance and serviceability of non-structural elements such as elevators and curtain walls. In this study a construction stage analysis method is developed to predict lateral movement induced by shortening, including the effect of creep and shrinkage. The algorithm of construction stage analysis is combined with the FE analysis program. It is then applied to predict lateral movement of a 58-story reinforced concrete building that was constructed in Kuala Lumpur, Malaysia. Gravity induced lateral movement of this building is predicted by the construction stage analysis. A field three-dimensional laser scanning survey is carried out to verify the prediction results, and satisfactory agreement is obtained.

초고층 건물의 제연영향요소에 따른 수직피난공간 압력분포 시뮬레이션 (A Study on the Pressure Difference of Smoke Control Influence Factor in the Super High-rise Building)

  • 최승혁;이동윤;전현도;박진철
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.130-135
    • /
    • 2009
  • These days, the super high-rise buildings construction plans are increased in Korea. But the stack effect in the super high-rise building interrupts the smoke control system's operation because of pressure difference, so it is more dangerous than the general building when firing. Therefore it needs to study about the pressure difference in the super high-rise buildings. We research the smoke control influence factor in the super high-rise building. Reflecting the influence factor, the simulation is practiced the case by case.

  • PDF