• Title/Summary/Keyword: High-Risk Facility

Search Result 150, Processing Time 0.028 seconds

Propose an Improvement of Checklist for Actual Condition Survey for Designation of Class-lll Facilitie (제3종시설물 지정을 위한 실태조사 체크리스트 개선방안)

  • Yoon, Ji-Ho;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.100-101
    • /
    • 2021
  • Facilities with high risk of a disaster or requiring continuous safety management are designated as class-III facility. In order to designate a class-III facility, it is evaluated based on the safety status of the facility, the risk to the building users, and the number of years elapsed of the facility, etc. and this shall be referred to the actual condition survey for the designation of a class-III facility. In the actual condition survey conducted to designate the safety status is calculated by the checklist based on the evaluation scores consisting of five stages each item, and is evaluated in three stages by 'good', 'careful observation', and 'designated review' through the average of the combined scores. Currently, the actual condition survey being conducted applies only structural stability, and the risk factors such as damage to the finish, the risk of cracking, and the type and weight of major structures are not included in the checklist for the actual condition survey, so even if experts think it is dangerous, scores cannot be reflected. Therefore, this study aims to analyze the problems of checklist of the actual condition survey for the designation of class-III facility and to propose an improvement plan for the checklist for the actual condition survey.

  • PDF

Occupational risk factors influencing subjective oral symptoms in hospital facility Temp·Contract Workers (병원 시설 파견·용역 근로자들의 주관적 구강 증상에 영향을 미치는 직무 위험 요인에 관한 연구)

  • Hong, Min-Hee;Lee, Jung-Min;Jang, Ki-Won
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.7
    • /
    • pp.298-306
    • /
    • 2021
  • The purpose of this study was to examine the occupational risk factors that affect oral symptoms in hospital facility workers. This study surveyed 627 hospital facility temp·contract workers in the metropolitan area from November 17, 2020 to May 20, 2021. The results of the study indicate that oral symptoms were higher among workers with high risk of musculoskeletal disorders and injuries. Also, symptoms of oral mucosa, temporomandibular joint disorder, and dry mouth were high in the areas of job insecurity and organizational injustice. As the occupational risk factors and occupational stress of workers increased, the risk of oral symptoms increased. In the future, this study can be used as basic data for improving oral health policies to better the oral health of hospital facility workers.

Biosafety and Biosecurity Programme: Its Implementation, Requirements and Continuous Development at the Nanyang Technological University in Singapore

  • Tun, Tin;Preiser, Peter Rainer
    • Korean Journal of Clinical Laboratory Science
    • /
    • v.50 no.2
    • /
    • pp.77-84
    • /
    • 2018
  • In Singapore, biosafety and biosecurity measures are controlled by the Biological Agents and Toxins Act (BATA) and other requirements by regulatory agencies. The law prohibits and otherwise regulates the possession, use, import, transhipment, transfer, and transportation of biological agents, inactivated biological agents, and toxins that are of public health concern. The law also defines the facility requirements for high risk biological agents and toxins. The containment facility (BSL 3) is a minimum requirement to handle biological agents that falls under Schedule 1 (Risk Group 3). The Nanyang Technological University School of Biological Sciences Biosafety Level 3 Facility (NTU-SBS BSL 3) was designed specifically for research involving potential hazardous biological materials. The facility requires yearly re-certification by an approved facility certifier to meet the local requirements and international biosafety standards for a containment facility in many instances. On the other hand, most NTU researchers conduct biological projects involving biological agents with low or moderate risk groups (Risk Groups 1 and 2 or biological agents described in schedule 3 and 4 of BATA) and GMOs, which need only a BSL 2 laboratory. BSL 2 laboratories are yet to be legally certified or registered in Singapore. Institutional Biosafety Committee (IBC) identifies the requirements; defines a minimum standard in the safe control of biological risks and registers all BSL 2 laboratories in the NTU. Therefore, under the guidance of the IBC, the University Biosafety and Biosecurity Programme includes the audit and certification program as a unique and an internal exercise to bring NTU biosafety to a higher level.

Empirical Application for the Urban Disaster Risk Assessment : Fire, Facility and Escape Cases in Cheongju City (도시 재해위험도 평가 모형 연구 - 화재, 시설, 피난위험도 중심의 청주시 사례 -)

  • Hwang, Hee-Yun;Baek, Ki-Young;Park, Byung-Ho;Lee, Man-Hyung;Hwang, Jae-Hoon;Ryu, Eul-Leal;Kim, Tae-Hwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.1 no.2 s.2
    • /
    • pp.123-137
    • /
    • 2001
  • Based on basic characteristics of urban disasters and their data availabilities in Korea, this study provides risk assessment models which are derived from Cheongju examples. In specific, the application models are confined to fire, facility and escape risk survey results in the paper. For the assessment criteria, major independent variables for the categories of fire include both the frequency levels and the amount of damage. And the degree of facility risk assessment is heavily hinged on both the weighted values of key facilities and their weighted rank-sizes. In the same context, the degree of escape risk assessment is hinged on both the weighted values and the amount of the classification of land. From the empirical configuration, this paper presents that the potential figure of fire risk is relatively higher in the built-up areas within the existing Central Business District where accommodates a number of dilapidated housing units and community-supportive facilities. In contrast, the potential figure of facility and escape risk is higher in both old residential areas and the newly-built apartment complex. In short, the CBD and its neighboring residential areas record a high potential figure in terms of total risk, juxtaposing fire, facility and escape risk all together.

  • PDF

Effects of Occupational Risk Factors on Mental Health of Hospital Facility Temporary and Contract Workers (병원 시설 파견·용역 근로자들의 업무상 위험요인이 정신건강에 미치는 효과)

  • Jang, Ki-Won;Lee, Jung Min
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.4
    • /
    • pp.451-460
    • /
    • 2021
  • Objectives: The purpose of this study is to examine occupational risk factors that affect the mental health (depression, anxiety, anger, insomnia, self-esteem, trauma) of hospital facility workers. Methods: A survey was conducted from November 17, 2020 to December 1, 2020 for 700 non-medical workers (Temporary and contract workers: cleaning, security, information, office workers, etc.) working at a general hospital in Seoul. Results: As a result of the study, the risk of musculoskeletal disorders was found to have a significant effect on depression, anxiety, insomnia, and trauma. Noise had a significant effect on depression and anger, dust hazard had an effect on depression and self-esteem, and high temperature had a significant effect on anxiety and insomnia. Conclusions: Based on these results, it is necessary to examine the influence of occupational risk factors to improve the mental health of non-medical hospital facility workers.

Cases Study of Accidents in High Risk Organizations by System Dynamics (시스템 다이내믹스 기법을 활용한 고위험 조직 사고 사례 분석)

  • Oh, Youngmin;Ryu, Jin
    • Korean System Dynamics Review
    • /
    • v.16 no.3
    • /
    • pp.5-29
    • /
    • 2015
  • The importance of the concept of safety culture has increased in the security of high-risk facility after Chernobyl accident in 1986. This paper elaborated the concept of safety culture and its main factors by Causal Loop Diagram. Due to the decline of safety culture, the occurrence of incidents and accidents require more and more corrective actions to the members of high-risk facilities and thereby increasing their workloads. Employees who must complete the task within the given time have to have time pressures and don't comply with the rules and procedures. Also, a schedule pressure is a big stress for employees, causing mistakes in precision work. In order to improve these problems, CLD of the safety culture in this paper suggests hiring more workers, re-allocation of given workloads and strengthen the learning, communication capabilities and safety leadership. In addition, the two real accident cases were analyzed to test the feasibility of the System Dynamic simulation model through the process of structuring the fault trees on the stationary black out accident in Kori unit 1 in South Korea and Kleen Energy power station explosion in US. The simulation results show that the various safety factors cause the serious accident combined with mechanical failure and safety culture will reduce the possibility of the accidents in these high-risk organizations. This simulation model can contribute to analyzing the impact of the organizational and human factors of safety culture and can provide the alternatives in high-risk facilities.

Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis (AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구)

  • Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.5
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.

Risk Assessment of Volatile Organic Compounds (VOCs) and Formaldehyde in Korean Public Facilities: Derivation of Health Protection Criteria Levels

  • Kim, Ho-Hyun;Lim, Young-Wook;Shin, Dong-Chun;Sohn, Jong-Ryeul;Yang, Ji-Yeon
    • Asian Journal of Atmospheric Environment
    • /
    • v.5 no.2
    • /
    • pp.121-133
    • /
    • 2011
  • This study suggests criteria to conduct a risk assessment of VOCs and formaldehyde in uncontrolled public facilities. Pollutants and facilities were selected based on two years of monitoring data and exposure scenarios in 573 uncontrolled public facilities, composed of 10 types of public institutions. With the exception of social welfare facilities, lifetime ECRs of formaldehyde and benzene in each facility were higher in employees than in users, except in social welfare facilities. In social welfare facilities, the risk of benzene for users ($1{\times}10^{-5}$) was higher than that of workers ($1{\times}10^{-6}$) because facility users live in the facility 24 hours per day, compared to workers who spend an average of 8 hours per day in the facility. The risk of benzene to workers in restaurants, academies, performance halls, internet cafe and pubs were estimated as high as $1{\times}10^{-4}$ and the risk to workers in the theaters and karaoke bars were recorded as $1{\times}10^{-5}$. Because lifetime ECRs of carcinogens exceeded $1{\times}10^{-4}$ for workers and users in most facilities, risk management of formaldehyde and benzene in these facilities is necessary. Although HQs of toluene and xylenes did not exceed 1.0, their HQs did exceed 0.1 in some facilities, so they were evaluated as potentially harmful materials. Additionally, criteria for health protection in IAQ by facility are suggested at $60-100\;{\mu}g/m^3$ for formaldehyde, $400-500\;{\mu}g/m^3$ for TVOCs, $10-20\;{\mu}g/m^3$ for benzene, $150-170\;{\mu}g/m^3$ for toluene and $100\;{\mu}g/m^3$ for xylenes, based on the survey on IAQ and HRA methodology. The excess rates of IAQ to health protection criteria in all facilities were 16% for formaldehyde, 8% for TVOCs and benzene, 9% for toulene, and 5% for xylenes.

A Study on the Hazard and Risk Analysis of Hospital in Korea - Focused on Local Medical Centers (의료기관의 위험도 분석 조사 - 지역공공의료원을 중심으로)

  • Kim, Youngaee;Song, Sanghoon;Lee, Hyunjin;Kim, Taeyun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.28 no.4
    • /
    • pp.31-39
    • /
    • 2022
  • The purpose of this study is to analyse the hazard risk by examining the magnitude and severity of each type of hazard in order to mitigate and prepare for disasters in medical facilities. Methods: The hazard risk analysis for hazard types was surveyed for team leaders of medical facilities. The questionnaire analyzed data from 27 facilities, which were returned from 41 Local Medical Centers. Results: When looking at the 'Risk' by category type of hazard, the influence of health safety and fire/energy safety comes first, followed by natural disaster, facility safety, and crime safety. On the other hand, as for 'Magnitude', facility safety and crime safety come first, followed by health safety, fire/energy safety, and natural disasters. Most of the top types of disaster judged to have high hazard in medical facilities are health types. The top five priorities of hazard in medical facilities, they are affected by the geographical and industrial conditions of the treatment area. In the case of cities, the hazard was found to be high in the order of infectious disease, patient surge, and wind and flood damage. On the other hand, in rural areas, livestock diseases and infectious diseases showed the highest hazard. In the case of forest areas, the hazard was high in the order of wildfire, fire accident, lightning, tide, earthquake, and landslide, whereas in coastal areas of industrial complexes, the hazard was high due to fire, landslide, water pollution, marine pollution, and chemical spill accident. Implications: Through the research, standards will be established for the design of hospitals with disaster preparedness, and will contribute to the preparation of preemptive measures in terms of maintenance.

Development of Risk-Based Inspection(RBI) Technology for LNG Plant Based on API RP581 Code (API RP 581 Code를 기반으로한 LNG 플랜트의 Risk-Based Inspection(RBI) 기술 개발)

  • Choi, Song-Chun;Choi, Jae-Boong;Hawang, In-Ju
    • Corrosion Science and Technology
    • /
    • v.11 no.5
    • /
    • pp.179-183
    • /
    • 2012
  • As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.