• Title/Summary/Keyword: High speed railroad

Search Result 802, Processing Time 0.021 seconds

Influence of the Speeds on the Curve Squeal Noise of Railway Vehicles (철도차량의 곡선부 스킬 소음에 대한 속도의 영향)

  • Lee, Chan-Woo;Kim, Jae-Chul
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.5
    • /
    • pp.572-577
    • /
    • 2011
  • Curve squealing of inter-city railway vehicle is a noise with high acoustic pressure and rather narrow frequency spectra. This noise turns out to be very annoying for the people living in the neighborhood of locations and the passenger in railway vehicle where this phenomenon occurs. Squealing is caused by a self-exited stick-slip oscillation in the wheel-rail contact. Curve squeal noise of railway vehicles that passed by a factor of the speed limit, so to overcome in order to improve running performance is one of the largest technology. In the present paper, characteristic of squeal noise behavior at the Hanvit-200 tilting train test-site. Curve squealing of railway wheels/rail contact occurs in R400~ R800 curves with a frequency range of about 4~11 kHz. If the curve is less than the radius of wheel frail contact due to |left-right| noise level difference (dBA) shows a significant effect of squeal noise were more likely.

Evaluation of Railway Line Segment Deterioration Using AHP and DEA (AHP와 DEA를 활용한 철도선로구간 노후도 평가)

  • Kim, Seongho;Choi, Chan-Yong;Na, Hee-Seung
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.2
    • /
    • pp.117-121
    • /
    • 2013
  • Railway line segment deterioration can be affected by rail tracks, subgrades, bridges, tunnels, and line shapes. In this paper, an evaluation method is presented for the railway line segment deterioration using the analytic hierarchy process (AHP) and data envelopment analysis (DEA). The importance weights can be assessed systematically for component facilities from numerous experts using AHP. The importance weights provided by experts may differ according to each expert; however, the DEA enables the evaluation of railway line segment deterioration that reflects the variety of expert opinions using these importance weights.

Safety of Train Passengers in a Tunnel

  • Kim, Dong-Jin;Moon, Dae-Seop;Moon, Seong-Am;Hwang, Young-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.16-21
    • /
    • 2007
  • Along with the opening of the high speed railroad in 2004, the number of long tunnels constructed is increasing and will be continued. In this respect, the fro inside the tunnels is a main cause of drastic damages to both facilities and lives of passengers on board, especially more severe consequences are expected if the fire occurs on a train in urban area. Even though, the threat to human lives due to the increasing number of tong tunnels and increasing train operation times inside such tunnels is getting bigger, the studies to measure safety of the tunnel and to enhance the safety of passengers have not been carried out enough in Korea. Therefore, in this paper, we will use the probabilistic method to predict the average number of deaths of passengers in case of fire on a train iii tunnel, and show the potential risk to passengers which can be a guide for safer design of tunnels to be constructed.

Analysis of the Contact Wire Wear Pattern According to the Pre-sag (사전이도에 따른 전차선 마모 패턴 분석)

  • Lee, In-Hee;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1501-1507
    • /
    • 2015
  • The contact wire pre-sag in railway overhead catenary has been considered as a innovative idea which improves the current collection quality and is expected to evenly distribute wear along a span. However, long term studies on the effects of pre-sag, especially on the quantitative wear pattern of the contact wire, have not yet been reported. Therefore, in this study, the pre-sag and wear pattern of the contact wire along a span from long term operation of railway in Korea was surveyed. The examination was conducted on 3 lines, the Gyeongbu high-speed line with pre-sag of span/2000, the Gyeongbu existing line without pre-sag, and Gyeongchun line with pre-sag installation on 1/1000 of its span. The wear measurements of 58 sample spans were examined. The wear pattern analysis show no interrelationships between pre-sag and evenly distributed wear, but more wear occurred at the center of a span compared to the ends of the span, especially more noticeable as span length increases.

A Parallel Sphere Decoder Algorithm for High-order MIMO System (고차 MIMO 시스템을 위한 저 복잡도 병렬 구형 검출 알고리즘)

  • Koo, Jihun;Kim, Jaehoon;Kim, Yongsuk;Kim, Jaeseok
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.5
    • /
    • pp.11-19
    • /
    • 2014
  • In this paper, a low complexity parallel sphere decoder algorithm is proposed for high-order MIMO system. It reduces the computational complexity compared to the fixed-complexity sphere decoder (FSD) algorithm by static tree-pruning and dynamic tree-pruning using scalable node operators, and offers near-maximum likelihood decoding performance. Moreover, it also offers hardware-friendly node operation algorithm through fixing the variable computational complexity caused by the sequential nature of the conventional SD algorithm. A Monte Carlo simulation shows our proposed algorithm decreases the average number of expanded nodes by 55% with only 6.3% increase of the normalized decoding time compared to a full parallelized FSD algorithm for high-order MIMO communication system with 16 QAM modulation.

A Study of Sound Source to predict Environment Noise in High Speed Train : Scaled model (고속철도 축소모형의 환경소음 예측을 위한 소음원 연구)

  • Kim, Tae-Min;Han, Jea-Hyun;Kim, Jeung-Tae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1342-1351
    • /
    • 2011
  • Nowadays rolling stock has become a fast and convenient transportation and increased in its demands. But the improvement of speed has result in increase of aerodynamic noise and therefore residential districts near by the railroad are now constantly suffering from the racket. Thus the study regarding rolling stock's environmental noise measurement and appraisal has become important. The case of environmental noise, there are no changes of tone so prediction can be made by reducing areas around the railway. This is part of the study which estimates the noise around the railway using scaled model, and the source of the noise has been researched on. The scaled model of rolling stock will have to be able to make high frequency and it needs to be spread out in a short amount of time. When popping a balloon or firing a gun fits its condition and this study analyzed the characteristics of these two different noises. Measurement was held on a wide vacant lot and the reflection effect of the ground is additionally examined. It is judged to be used in the future when predicting the environmental noise of railway vehicles.

  • PDF

Parametric Study of the Effects of Train Wind on Turnover Safety (차량 전복 안전성에 끼치는 열차 풍압의 파라메타 연구)

  • Nam, Seong-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.961-966
    • /
    • 2009
  • When constructing a high-speed railroad, the reduction of the distance between track centers and the width of track bed will save the construction cost. However the shortening the distance between track centers may cause the stability problems due to higher wind pressure. Therefore the extensive technical review and aerodynamical study should be performed to determine the adequate distance between track centers. In this study, the impact that the increase in wind pressure due to the change of aerodynamic phenomena with the change of the distance between track centers may have on two trains passing by each other was predicted, and the stability of train operation was analyzed in order to review the distance between track centers suitable to Honam HSR trains. We conducted the parametric study of the effects of train wind on the running stability.

Determination on the Reinforced Roadbed Thickness of Concrete Track at Embankment Section (흙쌓기 구간에서 콘크리트궤도 강화노반의 두께 결정에 관한 연구)

  • Lee, Il-Wha;Lee, Sung-Jin;Sin, Min-Ho;Hwang, Sun-Kun;Lee, Chang-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.835-843
    • /
    • 2009
  • Recently the more stable roadbed is required due to the high speed and design load. Therefore the reinforced roadbed was introduced as the solution. But the thickness and stiffness of reinforced roadbed in design code is being conservatively assessed by the foreign code without considering the domestic construction condition. In this paper, adequate Young's modulus, drain capacity, freezing depth, economical efficiency, bearing capacity, construction condition and 3-D finite element method were employed to determine the proper thickness of reinforced roadbed at the embankment section.

SHANGHAI URBAN GENERAL LAYOUT AND TRAFFIC SYSTEM (론상해기유철로추뉴재성시쾌속유궤교통 로망중적지위화작용)

  • CHANG SHAO LIANG
    • Proceedings of the KOR-KST Conference
    • /
    • 1995.05a
    • /
    • pp.51-59
    • /
    • 1995
  • It is an objective of Shanghai urban development to quickly build Shanghai into one of the international centres of economy, finance and trade. To fulfil the objective, a rational urban general layout and a satisfactory traffic network are needed. As a metropolis with complete urban functions and specified geographical position, Shanghai must develop a perfect citytown system that best suits its composite urban distribution. In planning the central city, the principle of "open and multi-centred" and "optimization of land use" should be taken into consideration. To build a satisfactory urban traffic network, emphasis should be laid upon the construction of deefwater wharf, air-field and inforation centre. In addition, determination should be made to build a high-speed traffic means including high speed railroad and express highway so that a public traffic network is realised on and above ground, and underground. A solution of traffic preblem in Shanghai lies in good understanding of traffic policy and strenthening of strategic management combined with a rational layout of traffic circulation.

  • PDF

Development of a Piecewise Bendable Switch System for the Urban Transit MagLev(I) (도시형 자기부상열차용 굴절형 분기장치의 개발(I))

  • Lee, Jong-Min;Jo, Heung-Je;Kim, In-Geun
    • 연구논문집
    • /
    • s.29
    • /
    • pp.57-67
    • /
    • 1999
  • This paper presents the status quo of the development of a piecewise bendable switch system for the urban transit MagLev. MagLev system as well as railroad requires switch systems to reach its destination. Requirements of the switch system for commercial lines are high speed operation satisfying about 2-3 minute headway and system reliability, etc. Parallel moving type switch system was installed on the test track of urban transit MagLev in KIMM. In this system, switch operation from one position to another can be done in about 90 seconds. Therefore, we concluded that this system can not satisfy the headway for the commercial lines. We decided to develop a high speed piecewise bendable switch system in which switching can be done in 20 seconds. Designed switch system is very complicated in view of operating mechanism. It consists of 11 segmented girder beams driven by hydraulic cylinders. To gain the idea of a piecewise bendable switch system, we manufactured and tested a 1/5 scale switch model. We are going to construct a full scale piecewise bendable switch system next year.

  • PDF