• 제목/요약/키워드: High efficiency removal

검색결과 1,359건 처리시간 0.028초

우수저류조의 형상과 도류벽 및 자갈채움에 따른 SS 제거효율 (SS Removal-rate Efficiency of Storm-water Detention Storage Tank Depending upon Length, Inside Training Wall and Gravel Filling)

  • 이종태;서홍준;서경아
    • 상하수도학회지
    • /
    • 제23권5호
    • /
    • pp.655-667
    • /
    • 2009
  • An experimental study is performed on reducing the pollutants supplied by storm water through enhancing efficiency of SS from the detention storage tank where CSOs are kept temporarily before discharge to the receiving water system. SS removal efficiency is investigated in accordance with various conditions of the detention pond-such as its length, the existence of training wall, and the use of gravel filling. The removal efficiency is strongly affected by the detention pond's length until the critical falling distance of the suspended solids is reached. For cases where the tank has a length longer than this critical condition, the removal rate shows less sensitivity. To enhance the SS removal efficiency of tanks of shorter than the critical length, we studied alternative types of tank in which inside training walls are installed. The results showed improvement of 14 to 37% in removal efficiency in 2hours detention(2 training walls). The important factor in achieving a high SS removal rate is ensuring the critical length of the detention pond, but for the cases where the basin length cannot be guaranteed, baffles or a gravel filling scheme may be introduced to attain considerable efficiency. The results of studying and comparing different storage tank conditions show that, in terms of elimination efficiency, a storage tank with gravel filling and training walls > a storage tank with gravel filling > a storage tank with training walls > an empty tank. The experimental results should contribute to development of related further research, by empirically verifying the already assumed importance of critical falling distance, training walls, and gravel filling schemes.

ASBR(Anaerobic Sequencing Batch Reactor) 공정의 F/R비가 암모니아가 탈기된 축산폐수의 유기물 제거에 미치는 영향 (Effect of F/R ratio of ASBR (Anaerobic Sequencing Batch Reactor) Process on Removal of the Organic Matters in Ammonia Stripped Swine Wastewater)

  • 황규대;조영무
    • 한국물환경학회지
    • /
    • 제21권6호
    • /
    • pp.687-694
    • /
    • 2005
  • Lab-scale experiments have been carried out to investigate the effect of F/R ratio of ASBR (Anaerobic Sequencing Batch Reactor) process on the removal of the organic matters in ammonia stripped swine wastewater. Three ASBR inoculated with sludge mixed with granular sludge of UASB (Upflow Anaerobic Sludge Blanket) and anaerobic digested sludge of municipal wastewater treatment plant were operated. Ammonia stripped swine wastewater was used as influent. Prior to conducting the experiments with varied conditions, the effect of increasing organic loading rate from 2.34 to $5.79gTCOD_{Cr}/L$-day at a fixed F/R ratio of 0.1 on the organic removal efficiency has been studied during start-up period. As the result of the experiment, under the condition of varied organic loadings, less than $4.14gTCOD_{Cr}/L$-day, the removed efficiency $TCOD_{Cr}$ of the ASBR process is 83% resulted from the mean value of effluent $TCOD_{Cr}$, 9,125 mg/L during the start-up period. Then ASBRs were operated with F/R ratio of 0.024, 0.303 and 0.91 respectively. Organic loading rate was increased from 4.56 to $15.43gTCOD_{Cr}/L$-day to investigate the effects of F/R ratio and organic loading rate on the organic removal efficiency. As the result of the experiment, less than $6.23gTCOD_{Cr}/L$/L-day, F/R ratio haven't an effect on the organic removal efficiency and the mean removal efficiency of TSS, $TCOD_{Cr}$ and $SCOD_{Cr}$ was about 80%, 86% and 78% at the all of F/R ratio. But as organic loading rate was increased from 8.54 to $12.04gTCOD_{Cr}/L$-day at the F/R ratio of 0.024, the removal efficiency of $SCOD_{Cr}$ decreased from 71% to 63%. The range of decreased removal efficiency of $SCOD_{Cr}$ at the F/R ratio of 0.024 was much more higher than at the F/R ratio of 0.303, 0.91. Thus, as organic loading rate was increased, ASBRs were operated with high F/R ratio to obtain high removal efficiency.

Removal of iron scale from feed-water in thermal power plant by magnetic separation - Introduction to chemical cleaning line -

  • Yamamoto, Junya;Mori, Tatsuya;Hiramatsu, Mami;Akiyama, Yoko;Okada, Hidehiko;Hirota, Noriyuki;Matsuura, Hideki;Namba, Seitoku;Sekine, Tomokazu;Mishima, Fumihito;Nishijim, Sigehiro
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제20권2호
    • /
    • pp.6-10
    • /
    • 2018
  • Removal of iron oxide scale from feed-water in thermal power plant can improve power generation efficiency. We have proposed a novel scale removal system utilizing High Gradient Magnetic Separation (HGMS). This system can be applied to high temperature and pressure area. We have conducted the lab-scale model experiments using ${\varphi}50mm$ filters and it demonstrated high removal efficiency in HGMS, but scale-up of the system is required toward practical use. In this study, we conducted a large scale mock-up HGMS experiment. We used the superconducting solenoidal magnet with ${\varphi}400mm$ bore and demonstrated that our HGMS system can achieve sufficient scale removal capacity that is required to introduce into both off-line and on-line system.

호기성 고율 안정조에서 빛의 조사 기간과 pH가 조류의 영양물질 제거에 미치는 영향 (Effect on Nutrients Removal of Algae in Aerobic High Rate Pond by Irradiance Period and pH)

  • 공석기;안승구
    • 한국환경과학회지
    • /
    • 제6권2호
    • /
    • pp.141-152
    • /
    • 1997
  • The pilot plant had been made so as to be an association system from the various items managed to have degrees of efficiency and It have been done to consider the experimental result with irradiance period and pH influence of all major things to treatment function of Waste Stabilization Pond. The results are as following. The attained results for continuous & cyclic irradiance 1. 24L.-reactor was prior to 12L.-12D.-reactor on oxygen generation & algal production ability. 2. 24L.-reactor was prior to 12L.-12D.-reactor on nutrients removal efficiency. 3. In 24L.-reactor it maintained 5mg/L∼6mg/L, DO concent enough to a fish's survival. The attained results for pH condition 1. Oxygen generation ^ algal production in pH 4-reactor were higher than those in pH 10-reactor. 2. The acidic condition at pH 4 and alkalic condition at pH 10 did not so much affect an algal growth and nutrients removal. The attained results for whole 1. In view of the results appeared as [(NH3-N)+(NO3-N)] removal efficiency, 89.1%∼93.9% and PO4-P removal efficiency, 34.3%∼83.7% & COD removal efficiency, 88.5%∼93.9%. It is possible to treat the wastewater with starch and pH which have been known as thedifficult problem. 2. At the point of non using methanol to nitrificate NO3-N, the nutrients removal method by using an algal growth is the most economical method in the whole nutrients removal methods. 3. The nutrients removal method by using an algal growth contributes to natural ecosystem. 4. The nutrients removal method by using an algal growth is excellant in the prevention against the eutrophication.

  • PDF

Membrane contactor and Carbon Dioxide Separation

  • 이규호
    • 한국막학회:학술대회논문집
    • /
    • 한국막학회 2002년도 제10회 하계 Workshop
    • /
    • pp.59-101
    • /
    • 2002
  • PVDF is good material for a hollow fiber membrane with high porosity and excellent hydrophobicity. Asymmetric PVDF hollow fiber membranes were prepared by the Loeb-Sourirajan phase inversion method. Asymmetric PVDF hollow fiber membranes could be controlled in pore size and porosity using various additives(LiCl, ZnCl$_2$) and internal coagulants (water, EtOH/water, and DMAc/water mixture). $CO_2$removal efficiency of asymmetric PVDF hollow fiber membranes was 1.2 times high than that of commercialized PP hollow fiber membranes at MEA 5wt% solution. $CO_2$flux of asymmetric PVDF hollow fiber membranes was 2.5 times higher than that of commercialized PP hollow fiber membranes. $CO_2$removal efficiency and absorption rate of asymmetric PVDF hollow fiber membranes were 30 times higher than those of packed column at absorbent $H_2O$. $CO_2$flux of asymmetric PVDF hollow fiber membranes at MEA 5wt% solution was 48 times higher than that of pure water. In the case of MEA 5wt% solution used as an absorbent, the $CO_2$absorption rate and removal efficiency of PVDF hollow fiber membrane were 2.3 times higher than that of a packed column.

  • PDF

응집제와 정전기 수처리장치에 의한 산업폐수의 비교처리법에 관한 연구 (Study for the comparative treatment method of industrial wastewater using coagulant and H.V.G)

  • 김재용;정상섭;정성권
    • 환경위생공학
    • /
    • 제18권4호
    • /
    • pp.1-5
    • /
    • 2003
  • For studying out the method of the effective purification of waste waters such as dying, paper pulp and plating wastewater, we measured the COD removal efficiency, color and turbidity of those pollutants by the physical and chemical method using the Inorganic Coagulating Agent (CM, RM) and a High Voltage Generator. The COD removal efficiency measured when applying the Inorganic Coagulating Agent (CM, RM) was mush higher than that using the Existing Coagulating Agent In addition to, when using those two methods above mentioned at the same time, both the COD removal efficiency and the reduction-effect of the inserting quantities of Coagulating Agent were higher than those were used singly. The system using both an Inorganic Coagulating Agent and a High Voltage Generator will be useful in various fields of wastewater treatment.

중금속으로 오염된 카올린의 Electrokinetic 처리와 효율증강에 관한 연구 (A Experimental Study of Electrokinetics and Enhanced Process with Kaolin Specimen Contaminated with Heavy metals)

  • 정방미;한상재;김수삼
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.241-246
    • /
    • 1999
  • In this research, electrokinetic remediation test was experimented with contaminated kaoline specimen at below, above the cation-exchange capacity of the mineral. The changes of the flow in electro-osmosis with open electrodes and current were presented, and lead removal results were evaluated through the extraction test. As a result, it was showed that removal efficiency was 20-30%, 67-87% In the anode As lead transport continues, the lead precipitation within a narrow zone very close to the cathode can go significantly high. This high lead precipitation near the cathode could block the flow path, decrease the conductivity, and thus the electroosmotic flow. The net effect will cause a decrease in the efficiency of electrokinetic processing. Therefore, in this study, citric acid and surfactant solution was used at the cathode as enhancement techniques.

  • PDF

SPCP를 이용한 오염물질 ($SO_2$, NOx) 처리 특성 (The Characteristics of the Treatment of Pollutants ($SO_2$, NOx) Using Surface Discharge Induced Plasma Chemical Process)

  • 봉춘근;부문자
    • 한국대기환경학회지
    • /
    • 제14권4호
    • /
    • pp.333-342
    • /
    • 1998
  • Plasma process has great possibilities to remove SOx, NOx simultaneously with high treatment efficiency and is expected to be suitable for small or middle plants. It was accomplished to evaluate SO2, NOx control possibility and achieve basic data to control pollutants by use of Surface Discharge Induced Plasma Chemical Process (SPCP) in this study. O3 generation characteristics by discharge of a plate was proportional to O2 concentration and power consumption and inversely proportional to temperature and humidity, In case of dry air, NOx was highly generated by N2 and O2 in air during the plasma discharge process but it was decreased considerably as H2O was added. SO2 removal efficiency was very high, and removal rate was 170,350 mEA at 30,50 watt respectively in flue gas which is usually contain HIO. NOx removal efficiency was about 57% at 40 watt power consumption with 7.5% humidity. It is estimated that H2O has an important role in reaction mechanism with pollutants according to plasma discharge.

  • PDF

동전기-패턴 공정에서 토양내 과산화수소의 거동 이해

  • 박지연;김상준;이유진;양지원
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2004년도 임시총회 및 추계학술발표회
    • /
    • pp.191-194
    • /
    • 2004
  • The concentration of hydrogen peroxide in soil and effluent was measured to understand the relationship between the profile of hydrogen peroxide and the removal efficiency of phenanthrene in an Electrokinetic-Fenton process. Electrokinetic phenomena were observed in two different conditions for 1, 2, 4, and 7 days; 3.5% and 10% hydrogen peroxide. The concentration of hydrogen peroxide in soil was high near the anode and decreased towards the cathode due to the direction of electroosmosis. The hydrogen peroxide concentration in effluent increased with time, but the value was lower than the initial. The removal efficiency of phenanthrene at 10% hydrogen peroxide was higher than the case at 3.5%. The removal efficiency after 7 days was high(> 97%) in both cases.

  • PDF

가축분뇨 고온 세정산발효액 처리를 위한 고부하 조건에서의 UASB 운전특성 (Operation Characteristics of an UASB at High Organic Loading Condition for Thermal Elutriated Acids of Piggery Wastewater Treatment)

  • 권구호;정용준;민경석
    • 한국물환경학회지
    • /
    • 제28권6호
    • /
    • pp.781-785
    • /
    • 2012
  • This study was carried out to treat the thermal elutriated acids of piggery wastewater using UASB process. The UASB reactor was operated at an organic loading rate (OLR) of $7.4\;kgCOD/m^3-day$ (6.5 ~ 9.0). During the start-up period, the low COD removal efficiency (20%) was caused by shock loading and instability in the reactor. It was mainly due to the high concentration amounts of ammonia nitrogen, which caused inhibitory and toxic effects to toward the anaerobic bacteria. In steady state, the UASB reactor showed a SCOD removal efficiency of 71% and a VS removal efficiency of 39%. The gas production and methane content were 1.3 L/day $(0.21\;m^3\;CH^4/kg$ COD removed) and 77%, respectively.