• Title/Summary/Keyword: Heavy Equipment

Search Result 497, Processing Time 0.027 seconds

Analysis of frequency characteristics and evaluation methods of elevator noise (승강기 소음의 주파수 특성 분석 및 평가 방법 고찰)

  • Kang, Min-Woo;Oh, Yang-Ki
    • The Journal of the Acoustical Society of Korea
    • /
    • v.40 no.6
    • /
    • pp.607-614
    • /
    • 2021
  • Research on elevator noise has mainly focused on the cause of its occurrence and measures to reduce it. There is still insufficient research on how to accurately measure and evaluate elevator noise. There is a measurement method established as an international standard for the measurement method, but it is also difficult to apply to high-rise apartments, and there are many cases that do not closely reflect the characteristics of elevator noise. In order to solve this problem, a study was conducted to improve the elevator noise measurement method in the current standard. In this study, the characteristics of elevator noise were closely identified. Through frequency analysis of the elevator noise and other equipment, it was verified that the elevator noise is noise with different characteristics from other equipment. Elevator noise was compared with heavy floor impact noise, which is a representative structural transmission noise, as structural transmission noise. Elevator noise was compared with heavy floor impact noise, which is a representative structural transmission noise, as structural transmission noise. The correlation between bang machine and rubber ball was found to be very high at 0.9 level. As a result, it was verified that the mid-low frequency band of the elevator noise is the main structural transmission noise and cannot be evaluated together with other equipment.

The package loading equipment development cutting both ends in the process of packaging lumber for improving the working environments (노동강도 제거 및 양끝정렬 균일화를 위한 양끝절단포장적재시스템 개발)

  • Kang, Ji-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.2
    • /
    • pp.95-103
    • /
    • 2008
  • The package loading process of the lumbering industry is an operation that after a pair of workers bind three or six lumbers into one unit and cut both ends of the lumbers, transports the weight cargo of 30-50kg by one meter, pack and load at a height of 1.2 meters. This package loading process causes lots of noise and wood dust when workers carry out the heavy work as the above. Therefore we developed the monolithic both ends cutting package loading equipment in order to prevent from getting musculoskeletal disease. An loading bar working system of this equipment is improved from pneumatic pressure system to oil pressure system, furnished the newly designed flow dividers, and developed the new system that a both end array is loaded identically. Also we developed the safety equipment of loading bar in order to prevent workers mistake and overload from malfunction during the package loading process. The main cause of job evasion on working place could be solved by preventing the musculoskeletal disease and improving the working environments.

Comparison the Effect of In-situ Mixing Method and Mixed Laying Method for Construction of Stabilizing Layer on Heavy Metal Contaminated Soil (중금속 오염토양 안정화층 시공을 위한 원위치 교반방식과 혼합포설방식의 효과비교)

  • Lee, Sang-Moo;Kim, Jin-Hwan;Yun, Yeo-Joon;Kim, Yoon-Su;Park, Nam-Seo
    • Tunnel and Underground Space
    • /
    • v.25 no.6
    • /
    • pp.505-514
    • /
    • 2015
  • In this study, a stabilizing equipment was developed to resolve the problems of existing stabilization construction method for contaminated soil. The field application and workability of the stabilizing equipment were verified through field demonstration tests and laboratory tests. The field application of the stabilizing equipment was identified through field demonstration tests. As a result of laboratory tests for field mixed soil, the mixing capability of stabilizer of the developed construction method was better than that of existing construction method.

The package loading equipment development cutting both ends in the process of packaging lumber for improving the working environments (노동강도 제거 및 양끝정렬 균일화를 위한 양끝절단포장적재시스템 개발)

  • Kang, Ji-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.04a
    • /
    • pp.135-147
    • /
    • 2008
  • The package loading process of the lumbering industry is an operation that after a pair of workers bind three or six lumbers into one unit and cut both ends of the lumbers, transports the weight cargo of 30-50kg by one meter, pack and load at a height of 1.2 meters. This package loading process causes lots of noise and wood dust when workers carry out the heavy work as the above. Therefore we developed the monolithic both ends cutting package loading equipment in order to prevent from getting musculoskeletal disease. An loading bar working system of this equipment is improved from pneumatic pressure system to oil pressure system, furnished the newly designed flow dividers, and developed the new system that a both end array is loaded identically. Also we developed the safety equipment of loading bar in order to prevent workers mistake and overload from malfunction during the package loading process. The main cause of job evasion on working place could be solved by preventing the musculoskeletal disease and improving the working environments.

  • PDF

A Civilian Reporting Service to Guide Converging Resources for Search and Rescue in Disaster Response

  • Chen, Albert Y.;Han, Sang-Uk;Lee, Sang-Hyun;Pena-Mora, Feniosky
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.45-51
    • /
    • 2011
  • During disaster response, prioritization of limited resources is one of the most important but challenging tasks. At the same time, it is imperative to timely provide to the rescuers with the adequate heavy equipment to facilitate lifesaving operations. However, supply of high demand equipment is usually insufficient during the initial phase of disaster response, challenging lifesaving operations. At the same time, resources outside of the disaster affected zone converge into the area to assist the response efforts, which is the effect of convergence that often made resource coordination challenging in large scale disasters. Meanwhile, the initial condition of the disaster is usually best known by civilians already at the area before and during impact of the disaster. The knowledge of the civilians is not always received and considered by the responding organizations. With the help of these civilians, critical information such as victim location, infrastructure damage, and risk condition could be better know before any response actions are taken. To efficiently collect information and utilize the converging resources, this paper proposes a geospatial information repository for initial condition reporting and update to guide search and rescue operations and deployment of equipment with safety considerations for the rescuers in large scale disaster response scenarios.

Communication Consecutive Test of Train Oriented Control System for Wayside Equipment Control (선로변 시설물 차상제어를 위한 차상중심 열차제어시스템의 통신 연속성 시험)

  • Baek, Jong-Hyen
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.5
    • /
    • pp.703-712
    • /
    • 2014
  • To improve the efficiency and safety of railway systems, the train control system has been considerably evolved from the ground-equipment-based control system (e.g. track circuit, interlocking system, etc.) into the on-board-equipment-based control system. In addition, this train control system enables the rolling stock to intelligently control the trackside facilities by introducing the information and communication technologies (ICT). Accordingly, since the ICT-based train control system makes the railway system be simplified (i.e. the heavy ground-equipment can be removed), the efficient and cost-effective railway system can be realized. In this paper, we perform the feasibility test of the ICT-based train control system via a simulation. To this end, we have developed the prototypes of the on-board controller and wayside object control units which control the point and crossing gate and performed the integrated operation simulation in a testbed. In this paper, before the field test of the on-board-controller-based train control system, we perform the Consecutive operation test for prototypes of the on-board controller, wayside object control units and local control computer.

A Study on Tunnel Cleaning Automation Equipment & Introducing Advanced Tunnel Cleaning Automation Equipment (터널 청소장비의 고찰 및 개선된 모델에 관한 연구)

  • Lee, Tai-Sik;Jang, Kyung-Soo;Koo, Ja-Kyung;Park, Kyung-Soon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.669-673
    • /
    • 2006
  • Field works are decreasing gradually since advancement of industrial robots. Tunnel cleaning is a dangerous field work which can be solved only by introducingadvanced tunnel cleaning automation equipment. Industrial robots work tirelessly night and day without a loss in performance. Consequently, greatly reduce the costs of manufactured goods.So far only 200 construction robots are invented. Robots used for tunnel cleaning are not of high standard they always need additional workers for job to be done. Robots offer specific benefits to workers, industries and countries. If introduced correctly for tunnel cleaning, industrial robots can improve the quality of life by freeing workers from dirty, boring, dangerous and heavy labor. Development of advanced tunnel cleaning automation equipment is a must to overcome above issues. The benefits of robots to industry include improved management control, productivity and consistently high quality products. This research is a study on tunnel cleaning automation equipment and introducing advanced tunnel cleaning automation equipment.

  • PDF

Case Study of Smart Phone GPS Sensor-based Earthwork Monitoring and Simulation (스마트폰 GPS 센서 기반의 토공 공정 모니터링 및 시뮬레이션 활용 사례연구)

  • Jo, Hyeon-Seok;Yun, Chung-Bae;Park, Ji-Hyeon;Han, Sang Uk
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.61-69
    • /
    • 2022
  • Earthmoving operations account for approximately 25% of construction cost, generally executed prior to the construction of buildings and structures with heavy equipment. For the successful completion of earthwork projects, it is crucial to constantly monitor earthwork equipment (e.g., trucks), estimate productivity, and optimize the construction process and equipment on a construction site. Traditional methods however require time-consuming and painstaking tasks for the manual observations of the ongoing field operations. This study proposed the use of a GPS sensor embedded in a smartphone for the tracking and visualization of equipment locations, which are in turn used for the estimation and simulation of cycle times and production rates of ongoing earthwork. This approach is implemented into a digital platform enabling real-time data collection and simulation, particularly in a 2D (e.g., maps) or 3D (e.g., point clouds) virtual environment where the spatial and temporal flows of trucks are visualized. In the case study, the digital platform is applied for an earthmoving operation at the site development work of commercial factories. The results demonstrate that the production rates of various equipment usage scenarios (e.g., the different numbers of trucks) can be estimated through simulation, and then, the optimal number of tucks for the equipment fleet can be determined, thus supporting the practical potential of real-time sensing and simulation for onsite equipment management.

Estimation of Dose Distribution on Carbon Ion Therapy Facility using Monte Carlo Simulation (몬테카를로 시뮬레이션을 이용한 중입자 치료실의 선량분포 추정)

  • Song, Yongkeun;Heo, Seunguk;Cho, Gyuseok;Choi, Sanghyun;Han, Moojae;Park, Jikoon
    • Journal of the Korean Society of Radiology
    • /
    • v.11 no.6
    • /
    • pp.437-442
    • /
    • 2017
  • Heavy ion therapy has a high cure rate for cancer cell. So many countries are introducing heavy ion therapy facility. When treating a cancer using heavy ion therapy, neutrons and gamma rays are generated and affect electronic equipment. A budget of about KRW 200 billion is needed to build a heavy ion therapy facility, and it takes more than five years to build it. Therefore it is important to observe the dose distribution in the treatment room using the monte carlo simulation before construction. In this study, we used the FLUKA of monte carlo simulation to investigate the dose distribution in the heavy ion treatment room.

The development for flooding prevention apparatus of electrical equipment using air pressure (공기압을 이용한 전기설비 침수 방지 장치 개발에 관한 연구)

  • Kim, Gi-Hyun;Jean, Hyun-Jae;Lee, Sang-Ick;Bae, Suk-Myong;Lee, Jae-Yong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.281-284
    • /
    • 2008
  • Inundation of substation and ground power equipment breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation excluding the exchanging cost of equipment, it occurs a great economic and social loss owing to recovery time and events of electric shock occur by inundation electrical equipment(Pad-mounted Transformer and Switch). In case of installing the power equipment at flood danger territory, we are necessary to the product development, the product is that water does not come in the inside the power equipment. Product of pressure maintaining are established on the basic frame and sensor operates at the flooding occurrence and is maintained a shutting tightly structure and it is a method. The product which is produced the reliability of the product it confirmed a flooding yes or no from the condition which puts in the water tank and it verified. We estimate that loss cost which is caused by with flooding and the power failure will be diminished if it is addition to advances the reliability evaluation and a security of the flood protection product.

  • PDF