• Title/Summary/Keyword: Hazard Management

Search Result 1,125, Processing Time 0.033 seconds

A Study on mine drainage characteristcs as abandoned Coal mine in Gyeongsang province (경상도 일대의 폐탄광 갱내수의 수질 특성 연구)

  • Jung, Young-Kook;Hong, Ji-Hye;Lee, Dong-Jin;Kim, Jeong-Phill;Kim, Dae-Gi;Joo, Sang-Don
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1440-1445
    • /
    • 2008
  • There are 21 abondoned coal mines drained out mine water in gyeong sang do. We monitored the water quality of 31 mine drainage from 1995. The most of mine drainage was neutral as the average pH was 6.22 and Fe, Mn, Al concentration was below 10mg/L. The result showed the tendency of decreasing of flow and metal concentration. The highest Mn concentration was detected in bonghwa area and the hightest Fe concentration was detected in munkyung area. It means that the water quality is closly related to geological features.

  • PDF

A Study on the Rational Management of the Pre-Hazard Factors Analysis in the Laboratory (연구실 사전유해인자위험분석의 합리적 관리 개선 방안에 대한 연구)

  • Seo, Jae Shin;Oh, Tea Keun
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.4
    • /
    • pp.85-94
    • /
    • 2019
  • Through the survey on the current status of hazardous substances in laboratories, the research institute is designed to establish measures to improve the management of university laboratories and to create a safe laboratory. We intend to explore countermeasures by confirming and reviewing the recognition of the statutes in the "Guidelines for the Implementation of the Laboratory Pre-Hazard Factors Analysis" through the questionnaire. Although there are various parts to create a pleasant environment for a laboratory, the most important part is the role of a laboratory manager in the area where each and every one of the laboratory's directors is the "Act on the Establishment of a Safety Environment in a Laboratory", but if the laboratory is not to be accident-prone, the laboratory's responsibility is to be more secure. This research is intended to be funded by research to reasonably implement" Guidelines for the Implementation of the Laboratory Pre-Hazard Factors Analysis" before applying to universities and to protect field-based research activities and to reasonably reduce safety accident prevention and risk.

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF

Research on the Safety Improvement Method for the Company' s RAMS Management Business and Public Infrastructure

  • Lee, Jong-Beom;Cho, Jai-Rip
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2010.04a
    • /
    • pp.254-261
    • /
    • 2010
  • The increase in hazard level is attributed to the industrial hazard environment; complete national environmental hazards to human health include climate change. The damage level in Korea from 1993 to 2009 has exceeded the Increase In adverse environmental conditions. Priority areas of concern will include those risks that are most likely to occur and are expensive when they do take place such as accident or injury at a community pool. Therefore, in this paper, we suggest the System Engineering method for application to the railway RAMS. Recently, the requirement of high-integrity level of infrastructure has been deemed important. The systems level approach is defined through the assessment of the RAMS interactions between elements of complex system applications.

  • PDF

Estimation of Physical Climate Risk for Private Companies (민간기업을 위한 물리적 기후리스크 추정 연구)

  • Yong-Sang Choi;Changhyun Yoo;Minjeong Kong;Minjeong Cho;Haesoo Jung;Yoon-Kyoung Lee;Seon Ki Park;Myoung-Hwan Ahn;Jaehak Hwang;Sung Ju Kim
    • Atmosphere
    • /
    • v.34 no.1
    • /
    • pp.1-21
    • /
    • 2024
  • Private companies are increasingly required to take more substantial actions on climate change. This study introduces the principle and cases of climate (physical) risk estimation for 11 private companies in Korea. Climate risk is defined as the product of three major determinants: hazard, exposure, and vulnerability. Hazard is the intensity or frequency of weather phenomena that can cause disasters. Vulnerability can be reflected in the function that explains the relationship between past weather records and loss records. The final climate risk is calculated by multiplying the function by the exposure, which is defined as the area or value of the target area exposed to the climate. Future climate risk is estimated by applying future exposure to estimated future hazard using climate model scenarios or statistical trends based on weather data. The estimated climate risks are developed into three types according to the demand of private companies: i) climate risk for financial portfolio management, ii) climate risk for port logistics management, iii) climate risk for supply chain management. We hope that this study will contribute to the establishment of the climate risk management system in the Korean industrial sector as a whole.

A Study on the Spatiotemporal Characteristics of a Hazard-based Index using the Pollutant Release and Transfer Register Data (화학물질 배출·이동량 자료를 이용한 유해기반 지수의 시공간 특성 연구)

  • Kim, Shijin;Lim, Yu-ra;Bae, Hyun-Joo
    • Journal of Environmental Health Sciences
    • /
    • v.47 no.2
    • /
    • pp.144-154
    • /
    • 2021
  • Objectives: This study was intended to identify hazard contribution by region, media, and chemical by calculating a hazard-based index using pollutant release and transfer register (PRTR) data. Methods: PRTR data for the period 2011 to 2016 was analyzed to examine the regional trends in toxic releases in terms of quantity and to create a corresponding hazard-based index. For the hazard-based index, the Risk-Screening Environmental Indicators (RSEI) Model was used. Results: The results of the trend analysis show that total releases decreased slightly, but health hazard levels increased consistently. According to the outcome of regional contribution analysis of the hazard-based index, Chungcheongnam-do, Jeollabuk-do and Gyeonggi-do Provinces showed a high ratio in the index for air and water release pollutants, while Gyeongsangbuk-do and Gyeongsangnam-do Provinces showed a high ratio in the index of soil release and waste transfer pollutants. Also, as a result of the analysis of the top ranked substances in the hazard-based index, it was found that chromium, cobalt and its compounds, and ethylene oxide contributed greatly to air release substances, while chromium, benzene, and lead and its compounds contributed greatly to water release substances. Conclusion: These results showed considerable disparities between total release and health hazard levels, especially in the analysis of contribution by regions and by chemical substance. Therefore, the hazard-based index should be used both to support a more comprehensive and robust approach to screening of chemicals for environmental health policy and for management.

Study on Theoretical Models of Regional Humanity Lung Cancer Hazards Assessment

  • Zhang, Chuan;Gao, Xing
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.5
    • /
    • pp.1759-1764
    • /
    • 2015
  • Purpose: To establish the concept of lung cancer hazard assessment theoretical models, evaluating the degree of lung cancer risk of Beijing for regional population lung cancer hazard assessment to provide a basis for technical support. Materials and Methods: ISO standards were used to classify stratified analysis for the entire population, life cycle, processes and socioeconomic management. Associated risk factors were evaluated as lung cancer hazard risk assessment first class indicators. Study design: Using the above materials, indicators were given the weight coefficients, building lung cancer risk assessment theoretical models. Regional data for Beijing were entered into the theoretical model to calculate the parameters of each indicator and evaluate the degree of local lung cancer risk. Results: Adopting the concept of lung cancer hazard assessment and theoretical models for regional populations, we established a lung cancer hazard risk assessment system, including 2 first indicators, 8 secondary indicators and 18 third indicators. All indicators were given weight coefficients and used as information sources. Score of hazard for lung cancer was 84.4 in Beijing. Conclusions: Comprehensively and systematically building a lung cancer risk assessment theoretical model for regional populations in conceivable, evaluating the degree of lung cancer risk of Beijing, providing technical support and scientific basis for interventions for prevention.

The Prediction of Hazard Area Using Raster Model (Raster 모델을 이용한 재해위험지 예측기법)

  • Kang, In-Joon;Choi, Chul-Ung;Cheong, Chang-Sik
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.2 no.2 s.4
    • /
    • pp.43-53
    • /
    • 1994
  • GSIS(geo-spatial information system), particularly when utilized in hazard management decision, is one of hazard analysis tool. Data of GSIS input from digitizing or scanning of map or aerial photos. This paper focuses upon the hazard prediction in GSIS and RS analysis to assess map, aerialphotos, satellite imagery and soil map. This study found computation of hazard area analysis. the results is formed as raster data model of quadtree. Authors knew more accurate results of overlay. This paper shows building up integrated data base as well as search of hazard area in aerial photographs.

  • PDF

A Study on the Safety Measures of Camping Ground Fire (야영장 화재 안전대책에 관한 연구)

  • Choi, Ji-Hun;Choi, Don-Mook
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.57-64
    • /
    • 2016
  • The leisure life pattern of people is changing to a familial and enthusiastic way that eventually develops the camping culture. Thus, the number of campers and the size of camping market have been dramatically increased due to significant expansion of camping people. However, many camp grounds and facilities are operating without a proper registration by government rules and regulations. In addition, many of electronic and gas equipment and tools are not used in a safe way and in a safety regulatory boundary. Therefore, campers at the camping ground is situated in a fire and safety hazard. In addition, there is limitation in rules and regulations associated with camping ground safety and fire. This study analyzed the fire and hazard guidelines and rules regulations of developed countries of campground and compared them to the current situation in South Korea. Therefore, this study is to develop a safety and fire hazard guidelines and rules and regulations related to camp ground operation, gas and electronic equipment operation and management. The study will eventually reduce the future fire and safety incidents in a campground in South Korea.

Markov-based time-varying risk assessment of the subway station considering mainshock and aftershock hazards

  • Wei Che;Pengfei Chang;Mingyi Sun
    • Earthquakes and Structures
    • /
    • v.24 no.4
    • /
    • pp.303-316
    • /
    • 2023
  • Rapid post-earthquake damage estimation of subway stations is particularly necessary to improve short-term crisis management and safety measures of urban subway systems after a destructive earthquake. The conventional Performance-Based Earthquake Engineering (PBEE) framework with constant earthquake occurrence rate is invalid to estimate the aftershock risk because of the time-varying rate of aftershocks and the uncertainty of mainshock-damaged state before the occurrence of aftershocks. This study presents a time-varying probabilistic seismic risk assessment framework for underground structures considering mainshock and aftershock hazards. A discrete non-omogeneous Markov process is adopted to quantify the time-varying nature of aftershock hazard and the uncertainties of structural damage states following mainshock. The time-varying seismic risk of a typical rectangular frame subway station is assessed under mainshock-only (MS) hazard and mainshock-aftershock (MSAS) hazard. The results show that the probabilities of exceeding same limit states over the service life under MSAS hazard are larger than the values under MS hazard. For the same probability of exceedance, the higher response demands are found when aftershocks are considered. As the severity of damage state for the station structure increases, the difference of the probability of exceedance increases when aftershocks are considered. PSDR=1.0% is used as the collapse prevention performance criteria for the subway station is reasonable for both the MS hazard and MSAS hazard. However, if the effect of aftershock hazard is neglected, it can significantly underestimate the response demands and the uncertainties of potential damage states for the subway station over the service life.