• Title/Summary/Keyword: Hand Line

Search Result 913, Processing Time 0.038 seconds

Model Postures at Fashion Shows According to Their Clothing Fashion Images: Focusing on Elegance Image and Neutral-gender Image (패션이미지에 따른 패션쇼 모델의 신체연출에 관한연구 - (제1보) 우아미와 중성미를 중심으로 -)

  • Heo, MIn-Jung;Chung, Sung-Jee
    • Journal of the Korea Fashion and Costume Design Association
    • /
    • v.16 no.2
    • /
    • pp.31-40
    • /
    • 2014
  • The purpose of the study was to examine model postures at fashion shows with respect to expressing fashion images including elegance and neutral-gender images. Data were gathered from the fashion shows held 2000 S/S through 2009 F/W, when elegance and neutral-gender fashion images were obvious in fashion collections. Three designer brands representing elegance and neutral-gender fashion images were selected by the researcher and fashion specialists including graduate students majoring in fashion. The fashion collection photos representing each image were selected from style.com, a website which contains four world's biggest fashion collections. The results showed different hand positions as a model posture according to fashion images. In the neutral-gender image, 16 photos (47%) showed a hand position at pockets, in the elegance image, 24 photos (82.3%) showed a hand position laying down by the sides. Also, walking pose was shown to be different between two fashion images. In the neutral-gender fashion image, 16 photos (52.9%) revealed a pose of 'natural walk', while 29 photos (100%) showed a pose of 'walk in a straight line' in the elegance imaged fashion. In conclusion, the neutral-gender image photos showed the pocket-positioned hand and the 'natural walk' poses more than elegance image photos, and elegance image photos revealed the hand position laying down by the sides and the 'walk in a straight line' poses than the photos of the neutral-gender image.

  • PDF

A Decentralized Self-Control Strategy for Assembly Cell Using Bucket Brigade (Bucket Brigade를 기반으로 한 분산자율형 조립셀 운영전략)

  • Koo, Pyung Hoi
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.4
    • /
    • pp.330-337
    • /
    • 2015
  • A bucket-brigade is a way of transporting items where items are passed from one person to the next. The operation of the bucket brigade imitates the cooperative behavior of ants when brood, food or other resources are moved. Koo (2009) presented a bucket brigade-based assembly cell where each worker follows a simple rule: perform assembly operations on a product until the next worker downstream takes it over; then go back to the previous worker upstream to take over a new assembly job. In this way, the flow line is self-balanced without any predetermined job assignment. However, there are some productivity losses related to hand-off and blocking. This paper examines the hand-off and blocking losses and presents a new bucket brigade-based assembly cell where working areas for each assembler is restricted with the help of buffer interfaces. Simulation experiments are used to validate the performance of the new assembly system.

On-line Condition Monitoring for Electric Equipments (전력 설비 시스템의 온라인 감시)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.103-105
    • /
    • 2008
  • In, this paper, we consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PO) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PO testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PO measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Ballooning Instability Induced by Coronal Flux Rope Merging

  • Choe, G.S.;Jun, Hong-Dal;Kim, Sun-Jung;Ahn, Ji-Eun
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.35 no.2
    • /
    • pp.48.1-48.1
    • /
    • 2010
  • A numerical simulation study of the solar coronal plasma reveals that a ballooning instability can develop in the course of flux rope merging. When magnetic field lines from different flux ropes reconnect, a new field line connecting farther footpoints is generated. Since the field line length abruptly increases, the field line expands outward. If the plasma beta is low, this expansion takes place more or less evenly over the whole field line. If, on the other hand, the plasma beta is high enough somewhere in this field line, the outward expansion is not even, but is localized as in a bulging balloon. This ballooning section of the magnetic field penetrates out of the overlying field, and eventually the originally underlying field and the overlying field come to interchange their apex positions. This process may explain how a field structure that has stably been confined by an overlying field can occasionally show a localized eruptive behavior.

  • PDF

Development of Ballooning Instabilities in the Solar Atmosphere

  • Jun, Hong-Dal;Choe, G.S.;Kim, Sun-Jung
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.36 no.2
    • /
    • pp.84.2-84.2
    • /
    • 2011
  • A numerical simulation study of the solar coronal plasma reveals that a ballooning instability can develop in the course of flux rope merging. When magnetic field lines from different flux ropes reconnect, a new field line connecting farther footpoints is generated. Since the field line length abruptly increases, the field line expands outward. If the plasma beta is low, this expansion takes place more or less evenly over the whole field line. If, on the other hand, the plasma beta is high enough somewhere in this field line, the outward expansion is not even, but is localized as in a bulging balloon. This ballooning section of the magnetic field penetrates out of the overlying field, and eventually the originally underlying field and the overlying field come to interchange their apex positions. This process may explain how a field structure that has stably been confined by an overlying field can occasionally show a localized eruptive behavior.

  • PDF

Series-Gap Characteristics of Polymeric Arrester for Transmission Line (송전선로용 폴리머 피뢰기의 직렬공극 특성)

  • Cho, Han-Goo;Yoo, Dae-Hoon;Lee, Young-Sun;Kim, Jong-Che
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.491-492
    • /
    • 2008
  • This paper describes the series-gap characteristics of transmission line arrester with switching and lightning impulse flashover test. The transmission line arrester exhibited external gap because it is must not flashover with switching impulse on the other hand it is must flashover with lightning impulse. In accordance, minimum and maximum length of series-gap was determinated with these tests. As gap length is increased flashover voltage was increased in the range of 315.4 kV~496.3 kV and negative polarity exhibited a high voltage. As a result, It was thought tat the series-gap length of transmission line arrester exhibited in the range of 580 mm~1100 mm.

  • PDF

Series-Gap Characteristics of Transmission Line Arrester with Switching and Lightning Impulse Flashover Test (개폐서지 및 뇌충격 섬락시험에 따른 송전 피뢰기의 직렬공극 특성)

  • Cho, Han-Goo;Yoo, Dae-Hoon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.484-485
    • /
    • 2007
  • This paper describes the series-gap characteristics of transmission line arrester with switching and lightning impulse flashover test. The transmission line arrester exhibited external gap because it is must not flashover with switching impulse on the other hand it is must flashover with lightning impulse. In accordance, minimum and maximum length of series-gap was determinated with these tests. As gap length is increased flashover voltage was increased in the range of 315.4 kV~496.3 kV and negative polarity exhibited a high voltage. As a result, It was thought tat the series-gap length of transmission line arrester exhibited in the range of 580 mm~1100 mm.

  • PDF

A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System (온라인 및 오프라인 PD 모니터링에 관한 연구 동향)

  • Choo, Jong-Hoon;Hong, Chang-Il;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF

The Construction of Ergonomic Electronic Goods Assemble Line by 6 Sigma Technique (6 시그마 기법에 의한 인체공학적 전자제품 제조라인 구축)

  • Kim, Hwa-Sik;Gong, Byeong-Chae;Choi, Seong-Dae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.13 no.2
    • /
    • pp.107-112
    • /
    • 2010
  • The automation and Cell-Line of manufacturing process are going to be new trend in the industry spot. But workers bodily burden by manual labour is still doing repeatedly at many processes. It is appearing to workers bodily burden (Shoulder, waist, hand, wrist, leg) with repeating works at assembly line which is from the static working space. The analysis with 6 Sigma Tool at specific standard assembly line improve the point at issue for unsuitable items and analyzed objects. Physical pain of worker is solved by the improvement action for the factor of 7 items with the result of analysis. It was known to be improved by solving of workers burden related to the change of 6 Sigma level from 2.16 to 4.1 at assembly line.

  • PDF

Scheduling Algorithm to Minimize Total Error for Imprecise On-Line Tasks

  • Song, Gi-Hyeon
    • Journal of Korea Multimedia Society
    • /
    • v.10 no.12
    • /
    • pp.1741-1751
    • /
    • 2007
  • The imprecise computation technique ensures that all time-critical tasks produce their results before their deadlines by trading off the quality of the results for the computation time requirements of the tasks. In the imprecise computation, most scheduling problems of satisfying both 0/1 constraints and timing constraints, while the total error is minimized, are NP-complete when the optional tasks have arbitrary processing times. In the previous studies, the reasonable strategies of scheduling tasks with the 0/1 constraints on uniprocessors and multiprocessors for minimizing the total error are proposed. But, these algorithms are all off-line algorithms. Then, in the on-line scheduling, NORA(No Off-line tasks and on-line tasks Ready upon Arrival) algorithm can find a schedule with the minimum total error. In NORA algorithm, EDF(Earliest Deadline First) strategy is adopted in the scheduling of optional tasks. On the other hand, for the task system with 0/1 constraints, NORA algorithm may not suitable any more for minimizing total error of the imprecise tasks. Therefore, in this paper, an on-line algorithm is proposed to minimize total error for the imprecise real-time task system with 0/1 constraints. This algorithm is suitable for the imprecise on-line system with 0/1 constraints. Next, to evaluate performance of this algorithm, a series of experiments are done. As a consequence of the performance comparison, it has been concluded that IOSMTE(Imprecise On-line Scheduling to Minimize Total Error) algorithm proposed in this paper outperforms LOF(Longest Optional First) strategy and SOF(Shortest Optional First) strategy for the most cases.

  • PDF