• Title/Summary/Keyword: HUM

Search Result 529, Processing Time 0.027 seconds

Innovation Patterns of Advanced Materials Technology Considering the Demand Factors (수요 요인을 고려한 첨단재료기술의 혁신유형 분류에 관한 연구)

  • Chae Jae-Woo;Cho Kyu-Kab;Kim Jeong-Hum;Lee Yong-Tai
    • Journal of Korea Technology Innovation Society
    • /
    • v.9 no.1
    • /
    • pp.103-130
    • /
    • 2006
  • This paper is to categorize the innovation patterns of advanced materials technologies Many existing taxonomies of innovation pattern consider the whole of industries and the system sector rather than a specific sector. On the basis of the interactions between materials sector and user sectors, this paper suggests four innovation patterns, push-type material innovation, needs-type materials innovation, push-type process innovation and needs-type process innovation. This categorization of innovation pattern not only provides a new approach to the analysis of materials technology innovation processes but also has many useful implications for policymaking. Suggestions for policymakers of the materials technology are presented.

  • PDF

Environmental Impact on the KEPCO 765-kV Double Circuit Transmission Line (한전 765 kV 2회선 송전선로의 전기환경장애 특성)

  • Lee, D.I;Sin, K.Y;Kim, J.B
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.48 no.2
    • /
    • pp.117-126
    • /
    • 1999
  • The environmental impact of the KEPCO 765-kV transmission line was studied using a full scale test line in order to develop the design technology. Therefore this paper describes an environmental design summary of the audible noise, hum noise, wind noise, radio interference, TV interference and electric field measurement from the KEPRI 765-kV double circuit transmission test line with a bundle of $6-480mm^2$ conductors per phase. The analysis of the test results shows that 6-Rail and 6-Cardinal conductors bundle satisfy the audible noise criterion & TV interference under the stable rainy weather condition and the radio interference level under the fair weather. And the other items are also agreed with the design level criterion for KEPCO 765-kV transmission line.

  • PDF

The Analysis on the Determinations Factors of Container Port Competitiveness (컨테이너 항만경쟁력 결정요인 분석)

  • Lee, Ki-Tae;Baek, In-Hum
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.1
    • /
    • pp.262-272
    • /
    • 2015
  • The aim of this study is to analysis factors that determine the competitiveness of container ports using the KJ and AHP methods. For this, 54 detailed attributing factors were identified both by previous studies and port users. 24 attributing factors were identified by a group of port experts. also, These were grouped 18 detailed attributing factors into 6 attributing factors by a group of port experts using the KJ method. These were made into a model of hierarchical structure with 3 levels, taking 1 goal factor, 6 evaluation factors and 18 detailed evaluation factors. The collected date of questionnaires were analyzed by a group of port experts using the AHP method. The analysis result of the evaluation factors in container port shows that port cargo volume is the most important factor, followed by port location, port cost, port service, port facility and port management. The analysis results of detailed evaluation factors in container port shows that import and export cargo volume is the most important factor, followed by transshipment cargo volume, distance from main trunk, cargo handling cost, distance from the point of importing and exporting, speediness of cargo handling, stability of cargo handling, vessel/cargo cost in port entry and leaving, punctuality in port entry and leaving, number and length of berth, collateral service cost, terminal area, hinterland accessibility, ability of terminal operation company, front depth of berth, etc.

A Parallel Machine Scheduling Problem with Outsourcing Options (아웃소싱을 고려한 병렬기계 일정계획 연구)

  • Lee, Ik-Sun;Yoon, Sang-Hum
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • This paper considers an integrated decision for scheduling and outsourcing(or, subcontracting) of a finite number of jobs(or, orders) in a time-sensitive make-to-order manufacturing environment. The jobs can be either processed in a parallel in-house facilities or outsourced to subcontractors. We should determine which jobs should be processed in-house and which jobs should be outsourced. And, we should determine the schedule for the jobs to be processed in-house. If a job is determined to be processed in-house, then the scheduling cost(the completion time of the Job) is imposed. Otherwise(if the job should be outsourced), then an additional outsourcing cost is imposed. The objective is to minimize the linear combination of scheduling and outsourcing costs under a budget constraint for the total available outsourcing cost. In the problem analysis, we first characterize some solution properties and then derive dynamic programming and branch-and- bound algorithms. An efficient heuristic is also developed. The performances of the proposed algorithms are evaluated through various numerical experiments.

An Analysis of Problems and the Current Status of Renewable Energy System in Buildings (건축물 신재생에너지원의 이용 현황 및 문제점 분석)

  • Jang, Hyang-In;Seong, Yoon-Bok;Cho, Young-Hum;Kim, Yong-Shik;Jo, Jae-Hun
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.75-82
    • /
    • 2012
  • This study aims to investigate the usage of the renewable energy systems installed in buildings and make suggestions for the effective management. In this regard, a questionnaire survey was conducted on 1)design and construction, 2) operation and management, 3) user satisfaction and improvements about the renewable energy systems in buildings. Findings from this study can be summarized as follows; a lack of the basic information about systems, non-use of energy management systems, the differences in the features by energy source, and a lack of expertise of managers. The requirements to resolved these problems include the integrated management of various electric heat sources including a renewable energy source, an operation schedule based on the prediction of production and consumption, and so on. Furthermore the necessity of multiplex energy sources management system was confirmed and the basic data needed to establish the targets of this system were obtained.

The analysis of the renewable energy supply ratio for the school building applied PV system (PV 시스템이 설치된 대학건물의 전력 생산에 따른 신재생에너지 공급비율 분석)

  • Kang, Su-Hyun;Lee, Yong-Ho;Hwang, Jung-Ha;Cho, Young-Hum
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.2
    • /
    • pp.50-57
    • /
    • 2012
  • Recently the renewable energy has been used widely and the importance of renewable sources is bigger than before. And the government enforced a law to the public buildings to install the renewable energy facilities. The capacity of facilities was 5% of total construction cost until April 13, 2011. Since then, the government changed the law from 5% of total construction cost to 10% of predicted energy usage for the resonable use of the renewable energy facilities. In this study, the comparative analysis is conducted according to the law to the building installed PV system through the Energy Plus simulation. And the method for improving renewable energy supply ratio was analyzed using existing PV array. Adjusting the PV array angle is the best way to generate more electric power without additional fee. When applying the month optimum angle, 3,600kWh of electric power are more generated compared to the existing angle.

Rod Migration into the Posterior Fossa after Harms Operation : Case Report and Review of Literatures

  • Chun, Hyoung-Joon;Bak, Koang-Hum;Kang, Tae-Hoon;Yi, Hyeong-Joong
    • Journal of Korean Neurosurgical Society
    • /
    • v.47 no.3
    • /
    • pp.221-223
    • /
    • 2010
  • C1 lateral mass and C2 pedicle (C1LM-C2P) fixation is a relatively new technique for atlantoaxial stabilization. Complications from C1LM-C2P fixation have been rarely reported. The authors report unilateral rod migration into the posterior fossa as a rare complication after this posterior C1-C2 stabilization technique. A 23-year-old man suffered severe head trauma and cervical spine injury after vehicle accident. He was unconscious for 2 months and regained consciousness. He underwent C1LM-C2P fixation for stabilization of type II odontoid process fracture described by Harms. The patient recovered without a major complication. Twenty months after operation, brain computed tomogram performed at psychology department for disability evaluation showed rod migration into the right cerebellar hemisphere. The patient had mild occipital headache and dizziness only regarding the misplaced rod. He refused further operation for rod removal. To our knowledge, this complication is the first report regarding rod migration after Harms method. We should be kept in mind the possibility of rod migration, and C1LM-C2P fixation should be performed with meticulous technique and long-term follow-up.

Structrral Analysis of Bridge Pier with 40MPa High Strength Concrete (설계강도 40MPa 고강도 콘크리트를 적용한 교량 교각 구조물의 구조해석)

  • Hur, Jae-Hun;Yi, Sang-Keun;Gwak, Seok-Hwan;Huh, Suk-Bum;Park, Chang-Min
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.157-158
    • /
    • 2009
  • In this study, We analyze structural behavior feature of column under reinforced-bar and concrete strength and load conditions and analyze optimal column diameter and construction cost through parameter study. In case we use the 40MPa high strength concrete instead of 27MPa concrete in pier, the results show positive effect in appearance of pier and cost because of small column diameter and low construction cost. Also, practical effect is proved by applying this results in pier of Shin Hou Bridge on Hum-Sung ${\sim}$ Chung-Ju highway construction work.

  • PDF

A Study on Deciding Port Development Priority (항만개발 우선순위 선정에 관한 연구)

  • Baek In-Hum;Moon Seong-Hyeok
    • Journal of Navigation and Port Research
    • /
    • v.29 no.8 s.104
    • /
    • pp.701-707
    • /
    • 2005
  • This study aims to suggest how the port specialists think the priority of port development in Korea To illustrate the ideas regarding a port development, 87 detailed attributes were identified both from the previous studies and from brainstorming on port professionals. And these were grouped into 6 criteria by 'KJ method' and made into 4 levels hierarchy structure. AHP technique identifies the relative weights of each levels, trends of the preference of port specialists and the composite relative weights of alternatives. As a result, a port development priority in Korea has been proposed.

Cost-Benefit Analysis of the Electronic Purchase and Supply System in Hospitals (병원 전자구매조달시스템의 경제성 분석)

  • Choi, Won-Ho;Yu, Seung-Hum;Chung, Woo-Jin;Kim, Young-Hoon;Lee, Sun-Mi
    • Korea Journal of Hospital Management
    • /
    • v.8 no.1
    • /
    • pp.42-63
    • /
    • 2003
  • There is a rapidly growing expansion of internet-based infrastructure throughout industries in Korea. The internet-based Electronic Purchase and Supply System(EPSS) is being considered a supportive tool to increase the economic efficiency of hospital management. In this study, we conducted an economic evaluation of the system, analyzing data on four hospitals in Korea. According to the results, four hospitals was estimated to make net benefit of about 611 million Won in one year and about 2,809 million Won in the next five years. Further, the adoption of all hospitals in Korea to the system may generate net benefit of about 31,575 million Won in one year and about 166,938 million Won in the next five years. Furthermore, we expect that as the system covered many kinds of inputs in hospitals like pharmaceuticals, the benefit of the system would go up by a considerable degree.

  • PDF