• 제목/요약/키워드: Guarantee Liability

검색결과 28건 처리시간 0.02초

유럽매매법원칙과 한국법상 결함상품에 대한 매도인의 책임의 법적성격과 책임제도 (The Liability System and the Legal Nature of the Seller's Liability for Defective Goods under Korean Law and the PELS)

  • 이병문
    • 무역상무연구
    • /
    • 제44권
    • /
    • pp.31-55
    • /
    • 2009
  • This study attempts to provide a comparative overview of the liability systems Korean law and the PELS adopt, that is, the approaches taken by Korean law and the PELS to deal with various irregularities of contractual performance. In addition, it examines in a comparative way the questions of what is the position of the seller's liability for his delivery of defective goods under the chosen liability system and what is the legal nature of the seller's liability. The study finds that the dual liability system taken by Korean law has caused some complexities as to the matter of which liability is applicable in some borderline cases. The problem in such complexities is originated in that the remedies available and the limitation period applicable are differentiated in accordance with one's different categorization among three types of default under the general liability and defective performance under the seller's guarantee liability. In this light, the study argues that the unified liability system under the PELS is superior because its concept of non-performance embraces in a unitary manner all the aspects of default including defects in quality, quantity and title. In addition, it finds that Korean law has suffered endless debates on the question of what are the true contents of the same remedies of rescission and damages provided under the seller's guarantee liability as under the general liability. The debates have been come along on the basis of the traditional presumption among some of civil law jurisdictions that two liabilities be different in terms of not only their legal nature but also their contents of remedies. The study argues that the problem may be circumvented, first, by another way of thinking that the unified liability in Korean law is inferred from the specification of the identical remedies for both the general liability and the seller's guarantee liability under the KCC, second, by the preposition that the requirement of fault be depended upon what remedy the buyer seeks to claim rather than what liability he does to rely on.

  • PDF

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구 (A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building)

  • 구해식
    • KIEAE Journal
    • /
    • 제12권3호
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

중국의 독립보증에 관한 법률문제연구 (A Study on the Legal Issues on Chinese Security Law)

  • 송수련
    • 무역상무연구
    • /
    • 제71권
    • /
    • pp.85-105
    • /
    • 2016
  • Independent guarantee is new financial product developed in international commercial transaction. The nature of independent guarantee is an independent undertaking, which takes the form of documentary transaction. As long as the documents presented by the beneficiary are on their face complying with the terms and conditions of the guarantee, the guarantor is obliged to pay upon the complying presentation. Where parties choose to apply for issue of independent guarantee in international commercial transactions in China, Chinese court shall respect the autonomy of parties. If either the guarantor or the beneficiary is located outside of China, or the facts which cause the establishment, change or cancellation of independent guarantee relationship occurred outside of China, it shall be deemed as foreign related independent guarantee. If the interested parties requests for confirmation of the independence of foreign related independent guarantee, it shall be supported by Chinese court. However, parties dealing with Chinese domestic commercial transaction have not fully realized the severity of independent guarantee liability. The market credit is being cultivated and the financial innovation is being explored at present in China. In order to guard against the systematic and the regional financial risk, before relevant rules are promulgated, Chinese court shall not recognize the independence guarantees issued for the domestic commercial transaction, but treat it as joint liability surety.

  • PDF

Guaranteed GNSS-based Road Charging Applications through User-Level Integrity

  • Mark, Audrey;Schortmann, Joaquin Cosmen;Olague, Miguel Angel Martinez;Merino, Miguel Romay
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2006년도 International Symposium on GPS/GNSS Vol.2
    • /
    • pp.77-82
    • /
    • 2006
  • Integrity plays a fundamental role in the feasibility of 'liability critical' applications. Road charging, e.g. road tolling in urban zones or on highways, represents a series of liability critical applications where a guarantee in integrity could be a true enabler: being the mechanism that prevents the incorrect charging of users and enabling the advancement of these applications using GNSS such as Galileo and EGNOS that provide integrity mechanisms. However, the integrity of the end user position is not guaranteed by the EGNOS and Galileo integrity services alone as provided. Algorithms have been developed to supply a guarantee on the performance attainable at the user level through the provision of a horizontal protection level that responds to local user conditions such as multipath or interference. In addition, an application has been developed that implements road charging mechanisms based on the availability of user-level integrity. Results obtained show that the user-level integrity algorithms provided the required level of integrity guarantee and granularity of the horizontal protection levels necessary for executing urban and rural (highway) road charging. In addition, the road charging application developed shows that the current application domain requirements can be met through the provision of guaranteed integrity and that further reductions in the horizontal protection levels along with increased signal availability will enable future road charging modalities.

  • PDF

공동주택 하자담보책임 기산일 변화에 따른 하자보증제도의 문제점 및 개선방안 (Problem of Guarantee System against Defect by Change Starting point of Defects Liability on the Management of Apartment Houses and Improvement)

  • 정용기;이태형;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.278-279
    • /
    • 2017
  • Result from Amendment of Apartment Houses Decree Customer Service, Recently, the starting point of Defects Liability changed "Criteria of Completion date" to "Delivery date to Divided property". Through the Law amended, There are some inconsistency between "Claim for repairing defects" and "Period of security deposit for repairing defects claim". If someone bought a house after Completion date, Purchasing period of "Claim to security deposit for repairing defects" lapsed without renewal. This research is to identify problems and solutions for improving the system.

  • PDF

매도인의 하자물품책임 면책약관의 규제에 관한 비교연구 (Regulating Exclusion Clauses of the Seller's Liability for Non-Conforming Goods: Comparative Accounts)

  • 이병문
    • 무역상무연구
    • /
    • 제32권
    • /
    • pp.29-56
    • /
    • 2006
  • This article primarily concerns the various aspects of the rules to control express terms particularly in standard form which seek to absolve either wholly or in part from the seller's liability for non-conforming goods. It describes and analyzes in detail how English law regulates such terms. In this analysis, it places the following questions; first, whether each jurisdiction treats the seller's liability for non-conformity in quality and quantity as mandatory rules, second, if it does, to what extent it is treated so and third, if not, in what way it controls the seller's attempt to exclude or restrict his liability for non-conformity in quality and quantity. In addition, it attempts to compare the rules under English law with those under Korean law and to evaluate them in light of the discipline of comparative law. In an attempt to evaluate them, it asks the question of whether a solution from one jurisdiction may facilitate the systematic development and reform of another jurisdiction. The evaluation is based upon the idea that the problems of fairness associated with the use of standard terms occur where the customer is unfairly taken by surprise due to his ignorance of the terms, or where even if he knows of the substance of the terms and objects to it, he is met with a take-it-or-leave-it situation.

  • PDF

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

독립보증상의 수익자에 의한 부당청구(unfair calling)에 관한 연구 (A Study on the Unfair Calling under the Independent Guarantee)

  • 오원석;손명옥
    • 무역상무연구
    • /
    • 제42권
    • /
    • pp.133-160
    • /
    • 2009
  • In International trade the buyer and seller are normally separated from on another not only by distance but also by differences in language and culture. It is rarely possible for the performance of obligations to be simultaneous and the performance of contracts therefore calls for trust in a situation in which the parties are unlikely to feel able to trust each other unless they have a longstanding and successful relationship. Thus the seller under an international contract of sale will not wish to surrender documents of title to goods to the buyer until he has at least an assurance of payment, and no buyer will wish to pay for goods until he has received them. A gap of distrust thus exists which is often bridged by the undertaking of an intermediary known and trusted by both parties who will undertake on his own liability to pay the seller the contract price in return for the documents of title and then pass the documents to the buyer in return for the reimbursement. This is a common explanation of the theory behind the documentary letter of credit in which the undertaking of a bank of international repute serves as a "guarantee" to each party that the other will perform his obligations. The independence principle, also referred to as the "autonomy principle", is at the core of letter of credit or bank guarantee law. This principle provides that the letter of credit or bank guarantee is independent of the underlying contractual commitment - that is, the transaction that the credit is intented to secure - between the applicant and the beneficiary ; the credit is also independent of the relationship between the bank and its customer, the applicant. The most important exception to the independence principle is the doctrine of fraud in the transaction. A strict interpretation of the rule that the guarantee is independent of the underlying transaction would lead to the conclusion that neither fraud nor manifest abuse of rights by the beneficiary would constitute an objection to payment. There is one major problem related to "Independent guarantees", namely abusive or unfair callings. The beneficiary may make an unfair calling under the guarantee. The countermeasure of beneficiary's unfair calling divided three cases. First, advance countermeasure namely by contract. In other words, when the formation of the contract, the parties must insert the Force Majeure Clause, Arbitration Clause to Contract, and clear statement to the condition for demand calling. Second, post countermeasure namely by court. Many countries, including the United States, authorize the courts to grant an order enjoining the issuer from paying or enjoining the beneficiary from receiving payment under the guaranty letter. Third, Export Insurance. For example, the Export Credit Guarantees Department is prepared, subject to certain conditions, to cover the risk of unfair calling. Of course, KEIC in Korea is cover the risk of the all things for guarantees. On international projects, contractor performance is usually guaranteed by either a standby letters of credit or Independent guarantee. These instruments will be care the parties.

  • PDF

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • 한국건축시공학회지
    • /
    • 제13권6호
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.