• Title/Summary/Keyword: Ground System Infrastructure

Search Result 146, Processing Time 0.027 seconds

A Case Study on Damage of The Tunnel Lining by Mine Waste Water (긴급제언 - 광산폐수에 의한 터널라이닝 손상사례 연구)

  • Lee, Yu-Seok;Oh, Young-Seok
    • Journal of the Korean Professional Engineers Association
    • /
    • v.45 no.4
    • /
    • pp.47-56
    • /
    • 2012
  • According to the policy of coal industry promotion, a lot of mines were abandoned. As the abandoned mines were neglected, environmental pollution such as settlement of ground, ground-water run-off, landscape damage etc were accompanied around abandoned mines. The government was promoting countermeasures of environmental contamination but most of the Countermeasures were aimed at protecting the ecological system not infrastructure. For this reason, abandoned mines impact on infrastructure has been relatively neglected. Most mines are located in mountainous so there is a tunnel among typical infrastructure around abandoned mines. In this paper, the effect of Mine drainage, Typical pollution source of abandoned mine, was introduced into the using tunnel focusing on the types and examples.

  • PDF

Seismic responses of transmission tower-line system under coupled horizontal and tilt ground motion

  • Wei, Wenhui;Hu, Ying;Wang, Hao;Pi, YongLin
    • Earthquakes and Structures
    • /
    • v.17 no.6
    • /
    • pp.635-647
    • /
    • 2019
  • Tests and theoretical studies for seismic responses of a transmission tower-line system under coupled horizontal and tilt (CHT) ground motion were conducted. The method of obtaining the tilt component from seismic motion was based on comparisons from the Fourier spectrum of uncorrected seismic waves. The collected data were then applied in testing and theoretical analysis. Taking an actual transmission tower-line system as the prototype, shaking table tests of the scale model of a single transmission tower and towers-line systems under horizontal, tilt, and CHT ground motions were carried out. Dynamic equations under CHT ground motion were also derived. The additional P-∆ effect caused by tilt motion was considered as an equivalent horizontal lateral force, and it was added into the equations as the excitation. Test results were compared with the theoretical analysis and indicated some useful conclusions. First, the shaking table test results are consistent with the theoretical analysis from improved dynamic equations and proved its correctness. Second, the tilt component of ground motion has great influence on the seismic response of the transmission tower-line system, and the additional P-∆effect caused by the foundation tilt, not only increases the seismic response of the transmission tower-line system, but also leads to a remarkable asymmetric displacement effect. Third, for the tower-line system, transmission lines under ground motion weaken the horizontal displacement and acceleration responses of transmission towers. This weakening effect of transmission lines to the main structure, however, will be decreased with consideration of tilt component.

Development Status of Crowdsourced Ground Vibration Data Collection System Based on Micro-Electro-Mechanical Systems (MEMS) Sensor (MEMS 센서 기반 지반진동 정보 크라우드소싱 수집시스템 개발 현황)

  • Lee, Sangho;Kwon, Jihoe;Ryu, Dong-Woo
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.547-554
    • /
    • 2018
  • Using crowdsourced sensor data collection technique, it is possible to collect high-density ground vibration data which is difficult to obtain by conventional methods. In this study, we have developed a crowdsourced ground vibration data collection system using MEMS sensors mounted on small electronic devices including smartphones, and implemented client and server based on the proposed infrastructure system design. The system is designed to gather vibration data quickly through Android-based smartphones or fixed devices based on Android Things, minimizing the usage of resource like power usage and data transmission traffic of the hardware.

A Study on Vertiport Location and Corridor Selections using GIS Analysis in Busan Area (GIS 분석을 활용한 부산권 버티포트 위치 및 회랑 선정에 관한 연구)

  • ChanHee Moon;HaYoung Shi;TaeWan Ku;BeomSoo Kang
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.6
    • /
    • pp.46-53
    • /
    • 2023
  • As urban traffic congestion and environmental pollution are becoming significant issues in major cities, Urban Air Mobility (UAM) is gaining attention as an efficient solution. In this study, we conducted a geographic information system (GIS)-based spatial analysis and clustering algorithm considering the actual data of the terrain and infrastructure in the Busan area, through which we were able to select the location of vertiports and corridors (flight routes) for the UAM operation. Based on the Gimhae International Airport, which is expected to be the center of the UAM infrastructure system in the Busan region, we judged that three vertiport locations in the target area were suitable. Subsequently, we used the A* (A-star) algorithm considering Ground Risk to select a flight path that minimized both risk and distance. Through this, we confirmed a risk reduction effect of 80.168% compared to the minimum distance route.

Implementing a network infrastructure in an advanced EMU test line (차세대전동차 시험선로 통신망 구축)

  • Won, Jong-Un;Joung, Eou-Jin;Lee, Han-Min;Kim, Gil-Dong;Hong, Jai-Sung;Lee, Jang-Mu;Sung, Chang-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1695-1700
    • /
    • 2011
  • In this paper, we introduce the network infrastructure in an advanced emu test line in Deabul. New technology has been applied to advanced EMU(DMU, integrated broadcasting system, black box and etc). In order to efficient and safely test of new developed train, failure, operation, status of test line and weather information should be monitored in real time. We has implemented a wireless and optical network infrastructure for reliability and scalability. The wireless communication capability between a car and ground is 20Mbps and back-hole network has 50Mbps of the communication performance. The network between test tracks and control office was established in the optical network. That can improve communication reliability.

  • PDF

Behaviour of Multi-Storey Prefabricated Modular Buildings under seismic loads

  • Gunawardena, Tharaka;Ngo, Tuan;Mendis, Priyan
    • Earthquakes and Structures
    • /
    • v.11 no.6
    • /
    • pp.1061-1076
    • /
    • 2016
  • Prefabricated Modular Buildings are increasingly becoming popular in the construction industry as a method to achieve financially economical buildings in a very short construction time. This increasing demand for modular construction has expanded into multi-storey applications where the effect of lateral loads such as seismic loads becomes critical. However, there is a lack of detailed scientific research that has explored the behaviour of modular buildings and their connection systems against seismic loads. This paper will therefore present the nonlinear time history analysis of a multi-storey modular building against several ground motion records. The critical elements that need special attention in designing a modular building in similar seismic conditions is discussed with a deeper explanation of the behaviour of the overall system.

Overturning of precast RC columns in conditions of moderate ground shaking

  • Kafle, Bidur;Lam, Nelson T.K.;Lumantarna, Elisa;Gad, Emad F.;Wilson, John L.
    • Earthquakes and Structures
    • /
    • v.8 no.1
    • /
    • pp.1-18
    • /
    • 2015
  • A simple method of assessing the risk of overturning of precast reinforced concrete columns is presented in this paper. The displacement-based methodology introduced herein is distinguished from conventional force-based codified methods of aseismic design of structures. As evidenced by results from field tests precast reinforced concrete columns can be displaced to a generous limit without sustaining damage and then fully recover from most of the displacement afterwards. Realistic predictions of the displacement demand of such (rocking) system in conjunction with the displacement capacity estimates enable fragility curves for overturning to be constructed. The interesting observation from the developed fragility curves is that the probability of failure of the precast soft-storey column decreases with increasing size of the column importantly illustrating the "size effect" phenomenon.

Common Earth Network constitution for minimize surge damage (낙뢰 피해 최소화를 위한 공동 접지망 구성)

  • Kim, Yong-Kyu;Baek, Jong-Hyun;Choi, Kyoung-Il;Yoo, Keun-Su
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.190-195
    • /
    • 2008
  • Surge proof equipment is an installation to make surge flow on the ground promptly so as to reduce surge-related damage on infrastructure, not to prevent surge from falling down on infrastructure directly. Compared with classical line individual earth, High speed line common earth has higher surge characteristic and plays a significant role to prevent infrastructure damage and injuries from surge, or short circuit accident between 25kV catenary and rail. In this paper, we analyzed the case of accident that caused communication/signaling system impaired while a tractor crossing level crossing at Honam line; in addition, we examined the accident reduction measures to minimize injury and property damage from cutting accidents with respect to common earth network.

  • PDF

The Analysis of Damage Characteristic and Cause on Infrastructures by Typhoon (시설물별 태풍에 따른 피해특성 및 원인분석)

  • Shin, Chang-Gun;Lee, Jong-Young;Kim, Seok-Jo;Ji, Young-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1602-1610
    • /
    • 2005
  • In this study was investigated and analyzed of damage characteristics for infrastructures by typhoon that have been many occur. The objective Structures were the road and hydraulic structure. The road structure was included the cut-slopes, retaining walls and bridges. The hydraulic structure is divided with the dike, small-scale dam, reservoir and floodgate. The analysis result of the bridge damage cause is river bottom height increase and passage ability decrease. The principal damage reasons of the cut-slope structure are weakening the ground due to the localized torrential downpour and drainage defective. Also, the principal damage reasons of the small-scale dam, reservoir, dike and the floodgate are continuous collapse of dike beside the floodgate.And we divided a typhoon damage occurrence cause with artificial and natural. As the result of analysis, the many damage occurrence cause will be removed by system improvement and technical development.

  • PDF

Present Condition and Direction of Improvement for Future Technology on the Prevention and Reclamation of Mining Induced Subsidences (지반침하 방지기술의 현황 및 발전방향)

  • Bang, Ki Mun
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.377-386
    • /
    • 2017
  • This study was carried out to predict the future technology on the prevention and reclamation of mining induced subsidences in Korea. We summarized the technical improvement of ground surveys and investigation, ground stability assessment, ground reinforcement, ground monitoring system and so on. It is essential to improve the technology that we try to collect and review all the data that is implemented on the site of mined area in Korea and collaborate all the members of public and private business sectors. We, also, try to expand our business area to related industry such as tunnelling, civil infrastructure, underground environmental assessment etc, and continue to develop oversea's market.