• Title/Summary/Keyword: Ground Surface Area

Search Result 709, Processing Time 0.027 seconds

The Characteristics of Sediment and Organic Content in the Dalpo Wetland (달포늪의 퇴적물과 유기물함량 특성 연구)

  • Kang, Dong Hwan;Kim, Sung Soo;Jung, Hwee Je;Kwon, Byung Hyuk;Kim, Il Kyu
    • Journal of Wetlands Research
    • /
    • v.9 no.3
    • /
    • pp.1-12
    • /
    • 2007
  • In this study, the correlation of organic content with particle size and type of sediment was found out.Particle size, stratigraphic section and organic content of sediments sampled from Dalpo wetland was analyzed. Dalpo wetland consists of three wetlands, and the area of Dalpo wetland is about $31,295m^2$. The particle size analyses for sampled sediments of 7 points (3 points in wetland A, 3 points in wetland B and 1 point in wetland C) were tested. As results of the particle size analyses, the sediment particle size becomes larger as to the edge of the wetland. It is revealed in order of wetland A > wetland C > wetland B. Borehole surveys with horizontal distance in the major and minor axes of wetland A, the major and minor axes of wetland B and the major axis of wetland C were accomplished. Clayey peat deposit is distributed at 10~90 cm depth below ground surface in the major axis of wetland A. The clayey peat deposit was the most thick at the center of wetland A that horizontal distance is 100 m. As the depth below ground surface of clayey peat deposit is less than 27 cm in the wetland B, we can infer that the life for the wetland B is being finished. Sediment composition of wetland C is simple because wetland C is small scale, and clayey peat deposit is distributed at 10~34 cm depth below ground surface. Sediment sampled by borehole survey in the Dalpo wetland was cut at interval of 10 cm, then organic content was analyzed. Organic content of wetland A sediment showed more than 40% until 70 cm depth below ground surface, also sediment of wetland B is similar to wetland A until 10 cm depth below ground surface, but is showed within 20 % above 30 cm depth below ground surface. Organic content of wetland B is showed the lowest as organic content near the ground surface is about 40%. All of the three wetlands, organic content is showed higher at clayey peat deposit near to ground surface. This is caused by finer particles of the clayey peat deposit, also organic materials were supplied from dead vegetation. Organic content of the Dalpo wetland showed in order of wetland A > wetland C > wetland B. This result is caused by thickness of clayey peat deposit in sediment. Through this study, it was verified that organic content of the Dalpo wetland sediment was dominated by particle size of sediment and vegetation of the upper part.

  • PDF

Study on Management System of Ground Sinking Based on Underground Cavity Grade (공동관리 등급에 따른 지반함몰 관리등급제에 대한 연구)

  • Lee, Kicheol;Kim, Dongwook;Park, Jeong-Jun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.2
    • /
    • pp.23-33
    • /
    • 2017
  • Due to the rapid development of cities, densities and heights of urban structures are increased, and much larger and more underground spaces are being developed accordingly. Increasing development of underground spaces has induced more ground sinks and underground cavities. Therefore, safety of people is threatened by potential ground collapses and possible accidents, which may result from underground cavity. To actively respond against potential danger of ground sink, evaluation of existing cavity grade and development of recovery procedure are important. There exists the ground sinking management grade system of expressway developed as local standards in Japan. Recently, ground sinking management grade system of Seoul was developed with consideration of road and asphalt conditions. In this study, 209 underground cavities of ${\bigcirc}{\bigcirc}$ area were explored and their cavity shapes and grades were evaluated based on both ground sinking management grade systems of Japan and Seoul. Comparison is made between cavity grades evaluated based on both grading systems from Japan and Seoul. As a result of comparative analysis, the conservatively-estimated cavity grades requiring emergency restoration based on the Japanese management grade system of expressway result from neglection of layer thickness of surface pavement, considering only width and cover depth of a cavity.

The Analysis of Sea Surface Temperature Distribution Using Atmospheric Corrected Landsat Imagery (대기보정된 Landsat 위성영상을 이용한 해수온도 분석)

  • Kim, Gi-Hong;Hong, Sung-Chang;Youn, Jun-Hee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.3
    • /
    • pp.219-225
    • /
    • 2008
  • There are many problems in monitering environmental change around of nuclear power station, because interesting area is coastal and relatively large. The ground resolution of Landsat ETM+ imagery is high (30 m), but this imagery does not have enough informations for conducting atmospheric correction in evaluating sea surface temperatures. On the other hand, while it is possible to conduct atmospheric correction using MODIS imagery with it's two infrared bands, it's resolution is relatively low (1 km). Therefore, atmospheric corrected high resolution temperature information can be obtained from these two satellite images. In this study, digital numbers of Landsat ETM+ data in interesting area are georeferenced, converted to effective temperatures based on radiance value, and then the atmospheric correction is conducted using MODIS data. As a result, about $3.5^{\circ}C$ temperature differences were detected in comparing sea surface temperature of the surrounding area of Uljin nuclear power station with it of the same area located 5km far east.

Automatic Building Modeling Method Using Planar Analysis of Point Clouds from Unmanned Aerial Vehicles (무인항공기에서 생성된 포인트 클라우드의 평면성 분석을 통한 자동 건물 모델 생성 기법)

  • Kim, Han-gyeol;Hwang, YunHyuk;Rhee, Sooahm
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.6_1
    • /
    • pp.973-985
    • /
    • 2019
  • In this paper, we propose a method to separate the ground and building areas and generate building models automatically through planarity analysis using UAV (Unmanned Aerial Vehicle) based point cloud. In this study, proposed method includes five steps. In the first step, the planes of the point cloud were extracted by analyzing the planarity of the input point cloud. In the second step, the extracted planes were analyzed to find a plane corresponding to the ground surface. Then, the points corresponding to the plane were removed from the point cloud. In the third step, we generate ortho-projected image from the point cloud ground surface removed. In the fourth step, the outline of each object was extracted from the ortho-projected image. Then, the non-building area was removed using the area, area / length ratio. Finally, the building's outer points were constructed using the building's ground height and the building's height. Then, 3D building models were created. In order to verify the proposed method, we used point clouds made using the UAV images. Through experiments, we confirmed that the 3D models of the building were generated automatically.

암반지하수 저류지 개발 전망

  • 이기철;한정상;부성안;장준영;박종철
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.04a
    • /
    • pp.85-92
    • /
    • 2002
  • When the United Nation classified as Korea is the one of the water deficit country. The consensus was made that the water is the one of the precious national resources. Government increases their R/D budget trying to get more clean water bodies. For instances, 'Sustainable Water Resources Development' project is the one of major title in '21 Century Frontier Research project and there are several small research projects are undergoing by the Ministry of Agriculture and KARICO. However, when the environmental preservation issue has been get more emphasis, construction of the Surface Dam met the blockage from the environmentalists due to the problem of the their water buried area. Since the most fitting site for surface dam had been used in the past, some engineer move their focus on modification of the existing Dam's height to enlarge its capacity or dredging the bottom of the reservoir recently However dredging evoke water quality problem in return by accumulated materials at the bottom. Last year the Dong Gang Dam plan has been canceled by environmental problem in water buried area of the reservoir. With the point of this view, ground water gets more focus for the one of the useful alternative for clean water bodies. Underground dam technique which had widely applied once in the early nineteen eighties by the KARICO and attenuated due to engineering insufficiency. The technique is newly studied with the advanced engineering technique. Still groundwater usage rate in Korea is much lower comparing with the advanced countries and has many rooms to develop. Wells, under ground dam and radial collector wells are typical facilities up to now. There is little application in Korea for the Recharge Dam, which had been widely used in the advanced countries. The Recharge Dam is technique to conjunct surface water and groundwater body together, This technique had developed to increase groundwater recharge at the beginning This research is the result of the study on the possibility of the development of the new technology, Groundwater Reservoir' which was modified from Recharge Dam. Groundwater Reservoir is like a deep artificial lakes trenched in hard rock aquifer to get groundwater. The advantage of the Groundwater Reservoir is followings 1) It can be developed at the plains area, not in the deep valley 2) Huge water body can be developed without dam 3) Small buried area comparing surface water dam makes the least environmental effect. 4) Trenching cost can be substitute by the income of the selling rock debris 5) Outfit of the reservoir can be modified to match with the site prospect 6) Rock debris can be used as constructing materials 7) It can be used as groundwater recharge system when the heavy rains comes 8) The reservoir looks like scenery lake with huge clean water bodies.

  • PDF

Evaluation on Bearing Capacity of Dredging Ground by Field Loading Test (현장재하시험에 의한 준설토지반의 지지력 평가방법 연구)

  • Park, Jong-Beom;Ju, Jae-Woo;Kim, Jang-Heung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.1
    • /
    • pp.53-61
    • /
    • 2014
  • Sea gives us a lot of benefits and one of them is a role of transporting goods easily by ship. Accordingly the industrial area or the container yard is constructed either on the low sea or near the sea. Sea dredging ground is made by pumping them using dredge pump to the inside of embankment after dredging undersea soils. The dredging ground after pumping is in the slurry state but as time goes, consolidation by the own weight happens and evaporation happens at the surface of dredging ground. The evaporation causes the crest layer in the upper side of dredging ground. Under the crest layer there is still a soil of slurry state which has just little bearing resistance. This kind of characteristics makes it difficult to get a exact bearing capacity using the equations proposed until now. In this study we have performed simultaneously both the field loading tests and the cone penetration tests on the sea dredging ground. From the result of field tests, new experimental equation for the ultimate bearing capacity has been proposed. If we use the new equation, it is believed that some design of sea dredging ground could be more accurate.

Interpretation of Soft Ground Deformation under Embankment using the Electrical Resistivity Survey (전기비저항탐사를 이용한 성토하부 연약지반의 변형 해석)

  • Kim, Jae-Hong;Hong, Won-Pyo;Kim, Gyoo-Bum
    • The Journal of Engineering Geology
    • /
    • v.21 no.2
    • /
    • pp.117-124
    • /
    • 2011
  • Soil deformations such as settlement, heaving and lateral flow have frequently happened on marine reclaimed soft grounds due to embankment filling or banking. The electrical resistivity survey was applied to investigate on ground surface such soil deformation without disturbance of ground. A test embankment was performed to assess soil deformation in marine reclaimed soft grounds, where was located at Sihwa area in western coast of Korean peninsula. The soft ground was composed of clayey sediments. After embankment filling, the boundary of soil deformation affected by the filling could be investigated with application of the electrical resistivity survey. The result of electric resistivity survey shows that the extent of deformation is about 5 m laterally to the southern direction of embankment and about 5~6 m vertically in depth, which is about 1-1.2 times of embankment height. This shows that the electric resistivity survey can be applied to interpret the ground deformation in a soft ground region.

The Study on The Numerical Analysis Method for Ground Improved by Cement Mixing Method (시멘트혼합처리공법이 적용된 지반의 수치해석 방법에 관한 연구)

  • Kim, Byung-Il;Hong, Kang-Han;Kim, Young-Seon;Han, Sang-Jae
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.41-52
    • /
    • 2018
  • Since the composite ground design method is easy to apply for calculation or numerical analysis, it is applied to the design of cement mixing methods. However, the comparison studies between analysis and actual results such as a trial test and construction for the cement mixing method are few because the composite ground design method was developed for the compaction pile (SCP, GCP) methods. In this study, the results of various analysis methods, such as the composite ground analysis method (1 case) and the individual pile method (3 cases), were compared with actual measurements through a two-dimensional finite element numerical analysis. In case of the surface settlements, the results of study show that the individual plate method was larger than the actual measurements, while other methods are similar. The settlements at the under ground of the improved area is overestimated in all analysis methods. When comparing numerical analysis results for the horizontal displacement, and ground reaction forces, the individual pile method in equivalent wall concept was found to be the most similar to the measurements. The composite ground method was not able to predict the behavior of stress transfer (Arching effect) and it turned out that the prediction of horizontal displacement was too large.

Rock Surface Protection According to Decrease of Blasting Vibration (진동저감 대책을 통한 절취면 보호)

  • Hong, Seong-Min;Song, Ha-Lim;Kang, Choo-Won;Chang, Ho-Min
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.21-28
    • /
    • 2012
  • Blasting methods are frequently used in case of forming slope artificially like slope cutting and open-cut method in the downtown area because of many economical and effective advantages. It is important that blasting work is carried out maintaining original strength of rock and not to damage rock face. And it is also considered that blasting method to decrease ground vibration is essential to the point of blast damages due to the ground vibration. In this study, to form a smooth plane of rock slope face, many trial blasts were carried out in this way that explosives were installed in detonating cord by equal interval in different charging method and stemming method. Using 4 blasting patterns in total 60 blast holes and 20 times of blasts were carried out. At the same time ground vibration measurements were carried out 15~102m away from the blast source, and total number of 310 data were obtained. Measured data for ground vibration velocity were analyzed so as to study blasting method to protect slope plane while decreasing blast vibration in an effective way.

Influence of Weak Ground Ahead of the Tunnel Face on 3D-displacement and Face Extrusion (막장전방의 연약층이 터널 3차원변위 및 막장 수평변위에 미치는 영향)

  • Jeon, Je-Sung
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.189-206
    • /
    • 2003
  • During tunnel excavation in urban area a systematic monitoring is important for the purpose of determination of support type and quantity, as well as for the control of stability of both surface structures and the tunnel itself due to the frequently, and in many cases, abruptly changing ground condition. In Austria absolute displacement monitoring methods have replaced relative displacement measurements by geodetic methods to a large extent. Prompt detection of weak ground ahead of the tunnel face as well as better adjustment of excavation and support to the geotechnical conditions is possible with the help of the improved methods of data evaluation on sites. Deformation response of the ground to excavation starts ahead of the tunnel face, therefore, the deformation and state of the tunnel advance core is the key factor of the whole deformation process after excavation. In other words, the rigidity and state of the advance core play a determining role in the stability of both surface structures and the tunnel itself. This paper presents the results from detailed three-dimensional numerical studies, exploring vertical displacements, vector orientations and extrusions on tunnel face during the progressive advancement for the shallow tunnel in various geotechnical conditions.