Alluvial soil is one of the most difficult grounds for tunneling works due to the insufficient ground strength and excessive ground water inflow. Dduk island in Seoul has a wide alluvium developed by two rivers, Han and Jung-Ryang. Subway tunnel of $\bigcirc\bigcirc$ line planed across Dduk island has highly poor ground conditions due to small cover and deeply developed alluvium. Moreover, much part of this tunnel is located parallel to the bridge foundations of another railway with a small horizontal distance. Original design was done in 2002 and construction has been in progress. During the construction, tunnel design has been partly changed and adjusted for the complex ground condition and the demand from related organizations. This paper intend to introduce the urban tunnel design and construction in alluvial soils. This line could be divided three sections(A, B, C) according to ground and adjacent conditions. Section A is featured by mixed tunnel faces consisted with alluvial soils and weathered or weak rocks. The feature of section B is that tunnel underpasses near the bridge foundations of another subway. Lastly, section C with a very short length is the most difficult construction conditions due to the small cover, poor ground, obstacles on and underneath ground surface.
The objective of this study is to develope ground heat exchanger using PHC file used to building foundation, and it's element technology. So we construct PHC ground heat exchanger in the apartment house's PHC foundation and evaluate it's performance. First, we study PHC file type, heat exchanger pipe, grouting materials, and present apartment house's foundation condition for PHC ground heat exchanger and design it's proto type. Second according to grouting materials, we estimate construction convenience, and it's performance. Construction convenience side, PB 22 A pipe and sand grouting with moisture was good for PHC ground heat exchanger elements. Experiment result is very superior. Thermal conductivity B, C type(sand, gravel) was respectively 32.4 W/m$^{\circ}C$, 36.5 W/m$^{\circ}C$, D(concrete) Type 27.8 W/m$^{\circ}C$, E(bentonite) Type 19.6 W/m$^{\circ}C$. Thermal interference for 4 day experiment period in 3.8 m was very small. So PHC file is good for using ground heat exchanger.
The design response spectrum presented in the seismic design standard reflects the characteristics of the tectonic environment at a site. However, since the design response spectrum does not represent the ground motion with a specific earthquake magnitude or distance, input ground motions for response history analysis need to be selected reasonably. It is appropriate to use observed ground motions recorded in Korea for the seismic design. However, recently recorded ground motions in the Gyeongju (2016) or Pohang (2017) earthquakes are not compatible with the design response spectrum. Therefore, it is necessary to convert the recorded ground motion in Korea to a model similar to the design response spectrum. In this study, several approaches to adjust the spectral acceleration level at each period range were tested. These are the intrinsic and scattering attenuation considering the earthquake environment, magnitude, distance change by the green function method, and a rupture propagation direction's directivity effect. Using these variables, the amplification ratio for the representative natural period was regressed. Finally, the optimum condition compatible with the design response spectrum was suggested, and the validation was performed by converting the recorded ground motion.
최근 도심지 지상 구조물의 포화와 함께 극심한 교통난에 대한 해결책으로 터널과 같은 지하공간 개발의 중요성이 커지고 있다. 이러한 이유로 현재 국내의 많은 지역에서 터널 시공이 이루어지고 있으며, 다양한 터널 확충 정책이 건설계의 화두가 되고 있다. 하지만, 터널굴착에 의한 지반거동을 사전에 분석하는 것은 다양한 조건을 해석하고 고려해야 하므로 매우 어려운 일이다. 기존의 구조물 하부 터널굴착에 대한 연구는 많은 연구자에 의해 수행되었지만, 대부분의 연구에서는 지하수위의 영향을 거의 고려하지 못하였다. 지하수위에 따라 발생되는 간극수압은 지반의 전단강도에 지대한 영향을 미치므로, 지하수 고려 여부에 따라 지반의 거동은 크게 달라질 수 있다. 따라서 본 연구에서는 이러한 문제점을 고려하지 못한 기존 연구의 한계에서 나아가, 얕은 기초 아래 터널굴착 시 지하수위 위치가 지반거동에 미치는 영향을 효과적으로 분석하고자 한다. 이에 따라 지하수위를 고려할 수 있는 새로운 시험 장치를 개발하였으며, 실내모형시험과 함께 근거리 사진계측을 사용하여 분석을 실시하였다. 또한, 수치해석을 통해 소성해석과 연계해석을 수행하여 실내모형시험 결과와 비교하였다. 두 가지의 수치해석 방법과 실내모형시험 결과를 비교하여 실제 도심지 터널 굴착 모델에 적합한 모델을 제시하고자 한다.
본 연구에서는 시공 중 TBM 터널에서 전기비저항과 유도분극(induced polarization, IP) 탐사를 활용하여 굴착면 전방의 복합지반(mixed-ground)을 예측하기 위한 방안을 제시하였다. TBM이 토사를 굴진하며, 굴착면 전방에서 상부 토사지반과 하부 암반으로 이루어진 복합지반을 조우하는 과정과 동시에 전기비저항과 유도분극에 의한 충전성(chargeability)을 측정하며 굴진하는 과정을 실내실험으로 모사하였다. 전기비저항과 충전성의 측정은 4전극을 이용하였으며, 복합지반을 효과적으로 예측하기 위하여 2개의 전극은 굴착면에, 나머지 2개의 전극은 조립된 세그먼트에 설치됨을 가정하였다. 실험 결과, TBM이 토사 굴진 중 토사-암반의 복합지반으로 진입할 경우 전기비저항과 충전성이 모두 증가하였다. 또한, TBM이 굴착면 전방에서 복합지반을 조우할 것임을 예측하기 위하여 굴착면의 전극 2개, 세그먼트의 전극 2개를 활용한 탐사와 동시에 굴착면 4전극 탐사를 수행하면 더욱 효과적인 예측이 가능함을 확인하였다.
본 논문은 터널굴착으로 인해 발생된 인접지반에서의 지반변위가 구조물에 미치는 영향을 시공조건(지반손실) 및 지반의 특성을 달리하면서 지반-구조물 상호작용이 고려된 상태에서 조사한 것이다. 터널굴착에 의해 발생된 지반변위에 노출된 4층 블록식구조물이 서로 다른 시공조건(지반손실) 및 지반조건에 노출될 때 발생되는 구조물 거동이 수치해석을 통해 조사되었다. 수치해석을 위한 구조물은 소요전단 및 인장강도 이상의 응력이 발생할 때 구조물에 실제크랙이 발생될 수 있도록 개별요소법(DEM)을 이용하여 모델링되었다. 터널굴착유발 지반변위에 노출된 4층 블록식구조물의 거동 및 손상정도가 지반변위의 크기에 따라 조사되었으며, 발생된 구조물의 거동 및 손상정도는 구조물에 발생한 변형, 크랙크기 및 분포를 고려하여 시공조건(지반손실) 및 지반조건별로 비교되었다. 뿐만아니라, 다양한 시공조건(지반손실) 및 지반조건의 변화에 의해 구조물에 유발될 수 있는 손상정도의 크기가 손상도 예측기준(Son and Cording, 2005)을 사용하여 제시되었다. 이러한 결과들은 향후 터널굴착으로 인해 유발되는 인접구조물의 손상을 제어하고 최소화하는데 필요한 정보를 제공할 것이다.
PURPOSES : Road subsidence occurs owing to road cavities, which cause many social and environmental problems, especially in cities. Recently, road cavities were detected by various ground radars and repair works were carried out against the detected cavities. The condition assessments related to the road cavities are necessary to understand the potential risk of the cavities. Therefore, in this study, a numerical study was performed to assess the various conditions of road cavities. METHODS : The numerical method adopted in this study is the discrete element approach, and it is suitable for analyzing the condition because it can consider the movement of the soil particles in the surrounded cavity areas. In addition, the triaxial test was modeled and performed under various cavity conditions inside the specimens. RESULTS : The conditions of different cavity locations and shapes were analyzed to identify the effect of cavity state. Three general cases of particle size distributions were formulated to identify the effect of surrounding ground conditions. As a result, the degree of decrement and volumetric strain were varied depending on the locations and shapes of the cavity. Only minor changes were observed when the particle size distributions were altered. CONCLUSIONS : The strength reduction was higher when the cavity formed was larger and located in the upper zone. Similar to the cavity shape, strength reduction and volume deformation are more influenced by the width than the length of the cavities. There is an influence from ground conditions such as the particle size distribution, especially on the wide cavity.
양호한 암반조건이나 균질한 점토지반 등 불투수성 지반의 경우에도 불연속면에 의하여 수압이 작용될 수 있으므로, 설계시 지반조건에 상관없이 수압조건을 고려하고 있다. 그러나, 세그먼트 라이닝의 형상이 원형임에 따라 수압을 고려하는 경우가 오히려 라이닝에 발생되는 부재력을 감소시킬 수가 있으므로, 고수압 조건에서는 이에 대한 설계개념정립이 중요하다. 따라서, 본 논문에서는 고수압의 불투수성 지반조건에서 하중조건 및 하중조합에 따른 부재력 크기 등을 비교함으로서, 세그먼트 라이닝 설계시 합리적이고 적절한 설계개념에 대하여 서술하였다.
본 연구에서는 지하수위, 폐기물의 전단강도 정수 그리고 지층 조건이 비위생 매립지 사면의 안정성에 미치는 영향을 검토하였다. 사면의 안정성 해석은 한계평형방법에 근거한 Janbu의 절편법을 사용하였다. 해석 결과 매립지가 완전건조 상태에 있는 경우가 완전포화 상태에 있는 경우에 비해 안전율이 약 2.4~2.8배 정도 증가되었다. 관측된 지하수위 상태 하에서 폐기물의 점착력과 내부마찰각이 증가할수록 사면의 안전율은 선형적으로 증가하였으며, 예상파괴면이 하부지층까지 도달할 경우 하부지층의 조건에 따라 안전율과 예상 파괴면의 형상이 변화한다는 것을 알 수 있었다. 따라서, 폐기물 매립지 건설 시에는 지반조건이 양호한 지반을 선택하고, 지하수위 감소를 위한 차수 및 배수 시스템을 설치하는 것이 사면의 안정성 향상에 도움을 줄 것으로 판단된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.