A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

Developing a Quality Risk Assessment Model for Product Liability Law (제조물 책임(PL)법 대응을 위한 품질 리스크 진단 모델 개발)

  • Oh, Hyung Sool
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.3
    • /
    • pp.27-37
    • /
    • 2017
  • As the global uncertainty of manufacturing has increased and the quality problem has become global, the recall has become a fatal risk that determines the durability of the company. In addition, as the convergence of PSS (product-service system) product becomes common due to the development of IT convergence technology, if the function of any part of hardware or software does not operate normally, there will be a problem in the entire function of PSS product. In order to manage the quality of such PSS products in a stable manner, a new approaches is needed to analyze and manage the hardware and software parts at the same time. However, the Fishbone diagram, FTA, and FMEA, which are widely used to interpret the current quality problem, are not suitable for analyzing the quality problem by considering the hardware and software at the same time. In this paper, a quality risk assessment model combining FTA and FMEA based on defect rate to be assessed daily on site to manage quality and fishbone diagram used in group activity to solve defective problem. The proposed FTA-FMEA based risk assessment model considers the system structure characteristics of the defect factors in terms of the relationship between hardware and software, and further recognizes and manages them as risk. In order to evaluate the proposed model, we applied the functions of ITS (intelligent transportation system). It is expected that the proposed model will be more effective in assessing quality risks of PSS products because it evaluates the structural characteristics of products and causes of defects considering hardware and software together.

불확실성 하에서의 신시장 개척을 위한 최적 마케팅 자원 배분

  • 이동주;안재현
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.157-160
    • /
    • 2001
  • Firms pursue new business opportunities for growth. Market development strategy is one of the growth strategies, which develops new market segments with current products. However, new market generally has high uncertainty, or high risk. Firms should consider the risk in making and implementing the market development strategy. In this paper, an optimal marketing resource allocation model is developed, taking into account the risk attitude of a firm in market development. Under the assumption of exponential utility function, the global optimal solution is derived, and the implications are provided.

  • PDF

The 3rd National Conference Of Professional engineers - On Geotechnical Structure Risk & Hazards (제3회 전국기술사대회 특집(토목시공) - 지반구조물 재해 및 위험분석 연구)

  • Yoon, Gil-Lim
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.4
    • /
    • pp.30-33
    • /
    • 2009
  • Great concerns on geotechnical risk & hazard assessment have increased due to human and economic damage by natural disasters with recent global climate changes. In this paper, geotechnical problems in particular, landslide which is interested in European countries and North America, were mainly discussed. For these, 18 key topics on geotechnical risk and hazards which had been discussed at the LARAM 2008 workshop in Italy were analyzed after grouping by subjects. Main topic contents consisted of applications such as field measurement, early warning systems, uncertainty analysis of parameters using radar, optical data and statistical theory and so on.

  • PDF

Operational Risk Measurement of Financial Institutions via AHP (AHP 분석을 이용한 금융기관 운영리스크 측정)

  • Choi, Seung-Il
    • Korean Management Science Review
    • /
    • v.28 no.3
    • /
    • pp.73-82
    • /
    • 2011
  • Basel II advanced measurement approaches for operational risk need to estimate the frequency and severity distribution of operational losses. Due to lack of internal loss data, the estimation is impossible in many cases and so external loss data might be used by scaling on asset or gross income. To get around lack of loss data, scenario analysis combined with loss distribution approach can be useful in calculating the capital charge of operational risk. However, scenario based loss distribution approach requires much time and effort. Instead we may apply the analytic hierarchy process to measure operational risk of financial institutions. The analytic hierarchy process combined with loss distribution approach is to estimate the capital charge of operational risk in other areas based on the operational VaR in an area with sufficient loss data. AHP provides a tool for timely measurement of operational risk in this rapidly changing global environment.

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

Evaluation of Overtopping Risks of Levee by using Reliability Analysis (신뢰성 해석에 의한 제방의 월류 위험도 산정)

  • Lee, Cheol-Eung;Park, Dong-Heon;Shim, Jae-Wook
    • Journal of Industrial Technology
    • /
    • v.29 no.A
    • /
    • pp.101-110
    • /
    • 2009
  • Due to frequent occurrence of a localized torrential downpour caused by global warming and change of outflow tendency caused by rapid urbanization and industrialization, risk analysis must be carried out in levee design with uncertainty. In this study, reliability analysis was introduced to quantitatively evaluate the overtopping risk of levee by the uncertainty. First of all, breaking function was established as a function of flood stage and height of levee. All variables of breaking function were considered as random variables following any distribution functions, and the risk was defined as the possibility that the flood stage is formed higher than height of levee. The risk evaluation model was developed with AFDA (Approximate Full Distribution Approach). The flood stage computed by 2-D numerical model FESWMS-2DH was used as input data for the model of levee risk evaluation. Risk for levee submergence were quantitatively presented for levee of Wol-Song-Cheon.

  • PDF

Research on Risk-Averse Newsboy under Supply Uncertainty (위험회피성향을 고려한 공급 불확실성하(下) 신문팔이소년 문제에 대한 고찰)

  • Kim, Hyoungtae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.43-50
    • /
    • 2013
  • In this paper, the single-period inventory problem, what is called newsboy problem, has been revisited with two different conditions, uncertain supply and risk-averseness. Eeckhoudt et al. [5] investigated the effect of risk-averseness of a newsboy on the optimal order quantity in a stochastic demand setting. In contrary to Eeckhoudt et al. [5] this paper investigates the effect of risk-averseness in a stochastic supply setting. The findings from this investigation say that if ${\alpha}^*$ represents the optimal order quantity without risk-averseness then the risk-averse optimal order quantity can be greater than ${\alpha}^*$ and can be less than ${\alpha}^*$ as well.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF