Analysis on Heating Effects of the Vertical Type Geothermal Heat Pump System

  • Kang, Youn Ku;Ryou, Young Sun;Jang, Jae Kyung;Kim, Young Hwa
    • Journal of Biosystems Engineering
    • /
    • v.39 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Purpose: This paper is aimed at analyzing the heating performance of the vertical closed loop type Geothermal Heat Pump System (GHPS) distributing the farm site and providing basic data of the GHPS. Method: Seedling greenhouse heating was made from October 2012 to May 2013. The seedling greenhouse was divided into 4 sectors (A, B, C and D zone, total $3,300m^2$) with different temperatures. It was heated from 5PM to 8AM, and during the night the greenhouse was covered by non-woven fabric thermal curtains along the upper 2m of the greenhouse for temperature maintenance. In order to analyze the heating performance of the GHPS, power consumption and operating time of the GHPS, inlet and outlet water temperature of the condenser, temperatures of each zone of the greenhouse, and ambient temperature were measured. Results: When operating only one heat pump unit, heat generated in the condenser decreased as the experiment progressed and power consumption increased correspondingly. However, the heating coefficient of performance decreased from 3.3 to 2.0 rapidly. Also, when operating two heat pump units, heat generated in the condenser decreased and power consumption increased. Heating coefficient of performance decreased from 4.5 to 3.7 rapidly. When the set temperature of the greenhouse was $13.7{\sim}20.1^{\circ}C$ and minimum ambient temperature was $-20.8{\sim}4.8^{\circ}C$, the annually accumulated heat and power consumption were 520,623 kW, 142,304 kW, respectively. Conclusion: When the set temperature of the greenhouse was $13.7{\sim}20.1^{\circ}C$ and the minimum ambient temperature was $20.8{\sim}4.8^{\circ}C$, the annually accumulated heat and power consumption were 520,623 kW, 142,304 kW, respectively. When operating only one heat pump unit, the heating COP was 2.0~3.3, and when operating 2 heat pump units, it was 3.7~4.5. If several heat pumps are installed in one GHPS, it is suggested that all heat pumps be operated except in special cases. Because the scale of the water pumps are set to the scale of when all heat pump units are operating, if even one unit is not operating, the power consumption will increase. That becomes the cause of COP decrease.

A Study on the Characteristics of Heat Source Temperature for Two-Well Geothermal System Using Numerical Simulation (수치 시뮬레이션을 이용한 복수정(Two-Well) 개방형 지열 시스템의 열원수 온도 변화 검토)

  • Cho, JeongHeum;Nam, YuJin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.4
    • /
    • pp.207-212
    • /
    • 2015
  • The use of groundwater and ground_heat is one of the ways to use natural and renewable energy, and it has been considered as a technology to reduce greenhouse gas emissions and increase energy-saving. There are a few researches on the optimum design for the open-loop geothermal system. In this study, to develop the optimal design method numerical simulation of the open-loop geothermal system with two-wells was performed by a groundwater and heat transfer model. In this paper, a study was performed to analyze the system performance according to well distance and pumping flow rate. In the result, average heat exchange rate and heat source temperature were calculated and it was found that they were dependent on the pumping rate.

Performance Monitoring Study of Building Integrated Geothermal System in Winter (건물일체형 지열시스템의 동계 성능 모니터링 연구)

  • Yu, Hyung-Kyu;Bae, Sang-Hwan
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.1
    • /
    • pp.23-28
    • /
    • 2010
  • The objective of this study is to develope ground heat exchanger using PHC pile used to building foundation, and it's element technology. So we made PHC piles into ground heat exchanger and evaluate it's performance. First, we studied PHC pile type, heat exchanger pipe, grouting materials, and present apartment house's foundation condition for PHC ground heat exchanger. As a result we designed BIGS(Building Integrated Geothermal System) prototype. Second, we applied BIGS to apartment houses' utility building in Osan built by Daelim. Third, we monitored heating performance of winter season. 1be result of heating performance was so good to apply to heat & cooling system in building.

An Experimental Study on the Cooling and Heating Performance of a Residential Ground Source Heat Pump System (가정용 지열원 열펌프 시스템의 냉난방 성능 특성 연구)

  • Kong, Hyoung Jin;Kang, Sung Jae;Yun, Kyoung Sik;Lim, Hyo Jae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.3
    • /
    • pp.156-163
    • /
    • 2013
  • Ground Source Heat Pump (GSHP) systems utilize geothermal energy as a thermal source or sink, for heating, cooling and domestic hot water. It is well known that GSHP is environmentally friendly, and saves energy dramatically. For this reason, many investigative researches have been conducted on commercial and governmental buildings. However, studies on residential GSHP are few, because of the small capacity and cost. In this study, we experimented with the characteristic performance of heating, cooling and seasonal performance factor for a residential GSHP system, which consisted of two 180 m deep u-tube ground heat exchangers, a heat pump and measurement instruments. The installed capacity of the heat pump was 5RT, and the conditioning area was $62.23m^2$. From the experimental results, the cooling COP of the heat pump was 4.13, and the system COP was 3.51, while the CSPF was 3.32. On the other hand, the heating COP of the heat pump was 3.87, and the system COP was 3.39, while the HSPF was 3.39. Also, in-situ cooling COP and capacity were 93.7% and 96.4% compared with the EWT certification data, respectively, and that of heating were 98.3% and 95.7%, respectively.

Cooling Performance Evaluation study of Dual-Source Heat Pump System (2중열원 히트펌프시스템의 냉방성능예측에 관한 연구)

  • Noh, Kwan-Jong;Kim, Ji-Young;Kang, Eun-Chul;Park, Hye-Moon;Lee, Euy-Joon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.3 no.1
    • /
    • pp.1-9
    • /
    • 2007
  • A steady-state simulation model for Dual-Source Heat Pump(DSHP) of 8RT was presented. A Dual-Source Heat Pump(DSHP) has been designed to make up for the conventional air source heat pumps. The performance evaluation has been conducted under internal standard test conditions such as ISO-13256-1 and KS C 9306. However, as test conditions such as entering water, indoor and outdoor air conditions could not be controlled to satisfy the standard test conditions in outdoor tests, a series of experiments have been conducted with the actual test conditions. Then, computer models for DSHP could be used for the standard condition have developed using EES program. The model was developed from basic thermodynamic principles and heat transfer relations. Most of the parameters were obtained with EES from the actual catalog data. The simulation results were in good agreement with the experiments.

  • PDF

Thermal Conductivity Measurement of Grouting Materials for Geothermal Heat Exchanger (그라우트 재료에 따른 지중 열교환기의 열전도도에 관한 실험적 연구)

  • Lim Hyo Jae;Kong Hyoung Jin;Song Yoon Seok;Park Seong Koo
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.4
    • /
    • pp.364-369
    • /
    • 2005
  • An experimental study was conducted on the thermal conductivity of various grouting materials for geothermal heat exchanger which is used as a heat sink or source in the heat pump system. The grouting of the vertical heat exchanger is important for environmental and heat transfer reasons and is generally accomplished by the placement of a low permeability material into the annular space between the borehole wall and the pipes suspended in the borehole. In this study, a lab scale test apparatus was made and measured the thermal conductivity of four grouting materials. As a result, the temperature rising tendency was similar among them, but the increasing rate was different. Thus the thermal conductivity showed a maximum difference of $27\%$ among grouting materials.

An Evaluation and Prediction of Performance of Road Snow-melting System Utilized by Ground Source Heat Pump (지열원히트펌프를 활용한 도로융설시스템의 성능 평가 및 예측)

  • Choi, Deok-In;Hwang, Kwang-Il
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.138-145
    • /
    • 2012
  • Because of the climate changes and the development of building technologies, the cooling loads have been increased. Among the various renewable energies, geothermal energy is known as very useful and stable energy for heating and cooling of building. This study proposes a road snow-melting system of which heat is supplied from GSHP(Ground source heat pump) in viewpoint of the initial investment and annual running performance, which is also operating as a main facility of heating and cooling for common spaces. The results of this study is as followings. From the site measurement, it is found out that the road surface temperature above the geothermal heating pipe rose up to $5^{\circ}C$, which is the design temperature of road snow-melting, after 2 hours' operation and average COP(Coefficient of performance) was estimated as 3.5. The reliability of CFD has confirmed, because the temperature difference between results of CFD analysis and site measurement is only ${\pm}0.4^{\circ}C$ and the trend of temperature variation is quite similar. CFD analysis on the effect of pavement materials clearly show that more than 2 hours is needed for snow-melting, if the road is paved by ascon or concrete. But the road paved by brick is not reached to $5^{\circ}C$ at all. To evaluate the feasibility of snow-melting system operated by a geothermal circulation which has not GSHP, the surface temperature of concrete-paved road rise up to $0^{\circ}C$ after 2 hour and 40 minutes, and it does never increase to $5^{\circ}C$. And the roads paved by ascon and brick is maintained as below $0^{\circ}C$ after 12 hours geothermal circulation.

The Performance Analysis for Low-Depth Unit-type Ground Heat Exchanger According to Grouting Materials (저심도 지중열교환기 개발을 위한 그라우트 재료에 따른 채열성능 검토 연구)

  • Oh, Jin-Hwan;Nam, Yujin
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.11 no.2
    • /
    • pp.7-11
    • /
    • 2015
  • Recently, as the demand for sustainable energy sources is increasing, ground-source heat pump (GSHP) systems are receiving growing attention. However, the initial cost of GSHP system is higher than it of the conventional systems, especially, in small-size buildings. Therefore, for the application to the small-size building, it is necessary to develop small-size ground heat exchanger with small-size buildings. In this study, analysis of unit-type heat exchanger due to grouting materials. As a result, 1492.14 W of heat exchange rate was acquired in the condition of cement-silica sand-graphite materials.

Analysis of Earth Design Parameter and Geothermal Heat Exchanger Length in Geothermal System (지열시스템의 지중 설계요소와 지중열교환기 길이 분석)

  • Park, Jong-II;Park, Kyung Soon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.11 no.3
    • /
    • pp.1-6
    • /
    • 2015
  • In this study, we analyzed t he design condition for appropriate design factor at geothermal system design documents. It is intended to provide the proper information of geothermal system design condition when construct new building, designer can use design conditions more efficiently. Therefore, it is possible to plan for domestic geothermal system, through utilization at design element, to provide as a good information that can predict the approximate underground condition. Thus, provided the basic design conditions that can predict the capacity of the geothermal system. It will be the first step to solve the problem.

Performance for Geothermal Heating & Cooling System by Heatpump in Office Building (사무용건물에서 지열히트펌프냉난방시스템의 운전성능 평가)

  • An, Hyung-Jun;Baek, Sung-Kwon;Cho, Chung-Sik;Sohn, Byung-Hu
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.3 no.1
    • /
    • pp.23-29
    • /
    • 2007
  • For the perfomance test of geothermal system, a large pilot of capacity of 50RT is built and operated in office building. This system is planed hybrid system with cooling tower as asisstance heat sink. From October, 2004 to September, 2005, this system is operated andmonitored. As the result, COP of heating periods is about 3.46 and COP of cooling periods is about 4.1. Therefore, geothermal system is useful and suitable in Korea.