The Transactions of the Korean Institute of Power Electronics
/
v.10
no.6
/
pp.610-617
/
2005
A variable speed wind turbine simulation model for grid connection is developed based on PSCAD/EMTDC. The model consists of wind model, rotor dynamics, synchronous generator, power converter, transformer, distribution line and infinite bus. Implementation of blade characteristics and power converter control strategies are included. Several transient case studies are performed including wind speed change, local load change and grid-side voltage unbalance using developed simulation model. The results of this work can be utilized for study of actual interaction between wind turbine and grid for reliable operation and protection of power system.
In this study, we have carried out development and performance evaluation of optimized MEMS(Multi-Effect-Multi-Stage) fresh water generator with $7m^2/day$ for solar thermal desalination system. The developed MEMS was composed of high temperature part and low temperature part. This arrangement has the advantage of increasing the availability of solar thermal energy. The MEMS consists of 2 steam generators, 5 evaporators, and 1 condenser. Tubes of heat exchanger used for steam generators, evaporators and condenser were manufactured by corrugated tubes. The performance of the MEMS was tested through in-door experiments, using an electric heater as heat source. The experimental conditions for each parameters were $20^{\circ}C$ for sea water inlet temperature to condenser, $8.16m^2$ /hour sea water inlet volume flow rate, $70^{\circ}C$ for hot water inlet temperature to generator of high temperature part, 3.6 4.8, 6.0 $m^2/hour$ for hot water inlet volume flow rate. As a result, The developed MEMS was required about 85 kW heating source to produce $7m^2/day$ of fresh water. It was analyzed that the performance ratio of MEMS was about 2.6.
Journal of the Korea Institute of Information Security & Cryptology
/
v.32
no.5
/
pp.891-898
/
2022
Along with global interest, drones are expanding the base of utilization such as transportation of goods, forest protection, and safety management, and cluster flights are being applied in various fields such as military operations and environmental monitoring. Currently, specialized networks such as e-UM 5G for services in specific industries are being established in Korea. In this regard, drone systems are also moving to establish specialized networks to provide services that are fused with AI and autonomous flight. As drones converge with various services, various security threats in various environments are also subordinated, and in response, requirements and guidelines for drone security are being prepared in Korea. In this paper, we propose a technology method for peer identification and safe information provision between cluster flight drones by utilizing a cryptographic module equipped with wireless LAN and quantum entropy-based random number generator in a cluster flight system and a mobile communication network such as e-UM 5G.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.12
/
pp.36-46
/
2008
This paper is to study on the Construction of Test circuit and Unification of Experiment Method for high voltage gas-insulated load switch using high power testing system The high power testing system is a equipment to verify electrical and mechanical performance on electrical product. The system consist of short-circuit generator, back-up breaker, making switch, impedance, high voltage transformer, low voltage transformer, measuring and protection system, etc. Using this system, we can test related to high power, for example, short-time current test, active load Current test, magnetizing Current test, capacitive current test, closed loop current test, etc. Standards of high voltage gas-insulated load switch that is in use domestic distribution line are ES 5925-0002, IEC 60265-1, IEC 62271-1 and IEEE C 37.74, etc. In this paper, we standardized on the test procedure, organization of test circuit and analysis of measured data prescribed many difference standards, and applied this test method to 600[MVA] high power testing system. So that we can test the load switch satisfied standards.
Journal of the Korea Institute of Information and Communication Engineering
/
v.5
no.1
/
pp.133-143
/
2001
This paper describes the correlation of the transient impedance and its parameters with the stationary resistance of a grounding system to a square pulse current and a lightning impulse current. In the experiment, the grounding system consists of a single grounding rod$(\Psi10[mm], 1[m])$and/or a triple-grounding rods of equilateral triangles with 5[m] spacing for operation. To analyze the transient impedance characteristics of the grounding system, a pulse generator which can produce square wave of a 30[ns] rise-time and a $20[\mus] $pulse duration is designed and fabricated. The injected content in the grounding system and the developed potential were recorded, and the time variation of the transient impedance were calculated as the ratio of the potential rising to the injected current at each time. The transient impedance and the effective surge impedance Z3 which defines economic protection level in power system were quite higher than the stationary resistance. The grounding impedance is decreased by the application of the triple-rods grounding system, and its effect is decreased as the frequency of the current is increased due to the inductance of the grounding leads.
An, Hyo-Jin;Kim, Chung-Hyun;Kwon, Young-Jin;Kim, Don-Hwan;Wee, Sung-Hwan;Moon, Jin-San
Korean Journal of Veterinary Research
/
v.54
no.3
/
pp.151-157
/
2014
A nationwide survey on radiation safety management in Korean animal hospitals was conducted. By 2013, 53 radiation generators were registered as veterinary medical devices (41 X-ray generators and 12 computed tomography scanners). Additionally there were six approved laboratories for radiation equipment and protection facility, and five approved laboratories for radiation exposure of employees, respectively. By March 2013, 2,030 out of 3,829 animal hospitals operated radiation-generating devices. Among these devices, 389 (19.2%) out of 2,030 were not labeled with the model name and 746 (36.7%) were not labeled with production dates. Thus, most veterinary X-ray generators were outdated (42.6%) and needed replacements. When periodic inspections of 2,018 animal hospitals were performed after revision of the Veterinarians Act in 2011, the hospitals were found to be equipped with appropriate radiation generators and protection facilities. Among 2,545 employees exposed to radiation at the hospitals, 93.9% were veterinarians, 4.3% were animal nurse technicians, and 18% held other positions. Among 169 employees supervised by administrators, none of those had a weekly maximum operating load that exceeded $10mA{\cdot}min$. This study suggests that the radiation safety management system of animal hospitals was general good.
Connection hijacking attack using the vulnerability of the TCP protocol to redirect TCP stream goes through your machine actively (Active Attack). The SKEY such as one-time password protection mechanisms that are provided by a ticket-based authentication system such as Kerberos or redirection, the attacker can bypass.Someone TCP connection if you have access on TCP packet sniffer or packet generator is very vulnerable. Sniffer to defend against attacks such as one-time passwords and token-based authentication and user identification scheme has been used. Active protection, but these methods does not sign or encrypt the data stream from sniffing passwords over insecure networks, they are still vulnerable from attacks. For many people, an active attack is very difficult and so I think the threat is low, but here to help break the illusion successful intrusion on the UNIX host, a very aggressive attack is presented. The tools available on the Internet that attempt to exploit this vulnerability, known as the recent theoretical measures is required. In this paper, we propose analysis techniques on a wireless network intruder detection.
The Transactions of the Korean Institute of Electrical Engineers C
/
v.54
no.1
/
pp.23-29
/
2005
This paper presents the characteristics of leakage currents flowing through ZinC Oxide(ZnO) surge arrester blocks under mixed direct and 60 Hz alternating voltages. A mixed voltage, in which an alternating voltage is superimposed upon a direct voltage, appears on the HVDC system network. The mixed direct and alternating voltage generator with a peak open-circuit of 10 kV was designed and fabricated. The leakage currents and V-I curves for the fine and used ZnO surge arrester blocks were measured as a function of the voltage ratio k, where the voltage ratio k is defined as the ratio of the peak of alternating voltage to the peak of the mixed voltages. The resistive component in the leakage current in the low conduction region is significantly increased with increasing the voltage ratio k. The V-I characteristic curves for the mixed voltages lies between the direct and alternating characteristics, and the cross-over phenomenon in the high conduction region was appeared.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.6
/
pp.1128-1133
/
2011
In a wind farm, a large number of small wind turbine generators (WTGs) operate whilst a small number of a large generator do in a conventional power plant. To maintain high quality and reliability of electrical energy, a wind farm should have equal performance to a thermal power plant in the transient state as well as in the steady state. The wind farm shows similar performance to the conventional power plant in the steady state due to the advanced control technologies. However, it shows quite different characteristics during fault conditions in a grid, which gives significant effects on the operation of a wind farm and the power system stability. This paper presents an analysis of response of a wind farm during grid fault conditions. During fault conditions, each WTG might produce different frequency components in the voltage. The different frequency components result in the non-fundamental frequencies in the voltage and the current of a wind farm, which is called by "beats". This phenomenon requires considerable changes of control technologies of a WTG to improve the characteristics in the transient state such as a fault ride-through requirement of a wind farm. Moreover, it may cause difficulties in protection relays of a wind farm. This paper analyzes the response of a wind farm for various fault conditions using a PSCAD/EMTDC simulator.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.7
no.8
/
pp.1989-2009
/
2013
How to discover router vulnerabilities effectively and automatically is a critical problem to ensure network and information security. Previous research on router security is mostly about the technology of exploiting known flaws of routers. Fuzzing is a famous automated vulnerability finding technology; however, traditional Fuzzing tools are designed for testing network applications or other software. These tools are not or partly not suitable for testing routers. This paper designs a framework of discovering router protocol vulnerabilities, and proposes a mathematical model Two-stage Fuzzing Test Cases Generator(TFTCG) that improves previous methods to generate test cases. We have developed a tool called RPFuzzer based on TFTCG. RPFuzzer monitors routers by sending normal packets, keeping watch on CPU utilization and checking system logs, which can detect DoS, router reboot and so on. RPFuzzer' debugger based on modified Dynamips, which can record register values when an exception occurs. Finally, we experiment on the SNMP protocol, find 8 vulnerabilities, of which there are five unreleased vulnerabilities. The experiment has proved the effectiveness of RPFuzzer.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.