• Title/Summary/Keyword: Generator protection

Search Result 271, Processing Time 0.02 seconds

A DVR Control for Compensating Unbalanced Voltage Dips of a DFIG System using Zero Sequence Components

  • Thinh, Quach Ngoc;Ko, Ji-Han;Kim, Dong-Wan;Kim, Eel-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.2
    • /
    • pp.62-68
    • /
    • 2013
  • The dynamic voltage restorer (DVR) is an effective protection device for wind turbine generators based on doubly-fed induction generator (DFIG) that is operated under unbalanced voltage dip conditions. The compensating voltages of the DVR depend on the voltage dips and on the influence of the zero sequence component. The zero sequence component results in high insulation costs and asymmetry in terminal voltages. This paper proposes the use of a proportional-resonant controller in stationary reference frames for controlling zero sequence components in the DVR to protect the DFIG during unbalanced voltage dips. To enhance the proposed control method, a comparison is carried out between two cases: with and without using the control of a zero sequence component. Simulation results are presented to verify the effectiveness of the proposed control method by using the Psim simulation program.

The Development of EPSM(Exciter Power Supply Module) Localization in Generator Exciter(EX2100) System (발전기 여자기시스템 주제어전원공급장치 국산화 개발)

  • Lee, Ki-Seon;Park, Jung-Cheul;Chu, Soon-Nam
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.2
    • /
    • pp.101-107
    • /
    • 2016
  • The main target in this paper is the localization of VME Type EPSM in Generator Exciter(EX2100) System. Developed EPSM has the compatibility with the existing product in the structure and shape and electrical feature and so on, but it has a much improved capacity and reliability in comparison with origin company product. this paper, to improve these functions, put emphasis on protection, monitoring, power capacity increase(over 120%), an enlarged scale of input voltage supply, AC/DC dual voltage use and so on. After manufacturing product localization, it was carried out several tests for the performance and reliability verification of developed product. These tests were performed in Authorized Inspection Agency(KTL) and field application test and maker self-test were additionally performed. Finally, the results of all tests were "success".

Centralized Adaptive Under Frequency Load Shedding Schemes for Smart Grid Using Synchronous Phase Measurement Unit

  • Yang, D.Y.;Cai, G.W.;Jiang, Y.T.;Liu, C.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.3
    • /
    • pp.446-452
    • /
    • 2013
  • Under frequency load shedding (UFLS) is an effective way to prevent system blackout after a serious disturbance occurs in a power system. A novel centralized adaptive under frequency load shedding (AUFLS) scheme using the synchronous phase measurement unit (PMU) is proposed in this paper. Two main stages are consisted of in the developed technique. In the first stage, the active power deficit is estimated by using the simplest expression of the generator swing equation and static load model since the frequency, voltages and their rate of change can be obtained by means of measurements in real-time from various devices such as phase measurement units. In the second stage, the UFLS schemes are adapted to the estimated magnitude based on the presented model. The effectiveness of the proposed AUFLS scheme is investigated simulating different disturbance in IEEE 10-generator 39-bus New England test system.

Fuzzy Logic Based Energy Management For Wind Turbine, Photo Voltaic And Diesel Hybrid System

  • Talha, Muhammad;Asghar, Furqan;Kim, Sung Ho
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.26 no.5
    • /
    • pp.351-360
    • /
    • 2016
  • Rapid population growth with high living standards and high electronics use for personal comfort has raised the electricity demand exponentially. To fulfill this elevated demand, conventional energy sources are shifting towards low production cost and long term usable alternative energy sources. Hybrid renewable energy systems (HRES) are becoming popular as stand-alone power systems for providing electricity in remote areas due to advancement in renewable energy technologies and subsequent rise in prices of petroleum products. Wind and solar power are considered feasible replacement to fossil fuels as the prediction of the fuel shortage in the near future, forced all operators involved in energy production to explore this new and clean source of power. Presented paper proposes fuzzy logic based Energy Management System (EMS) for Wind Turbine (WT), Photo Voltaic (PV) and Diesel Generator (DG) hybrid micro-grid configuration. Battery backup system is introduced for worst environmental conditions or high load demands. Dump load along with dump load controller is implemented for over voltage and over speed protection. Fuzzy logic based supervisory control system performs the power flow control between different scenarios such as battery charging, battery backup, dump load activation and DG backup in most intellectual way.

Parameters Optimization of Impulse Generator Circuit for Generating First Short Stroke Lightning Current Waveform

  • Eom, Ju-Hong;Cho, Sung-Chul;Lee, Tae-Hyung
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.286-292
    • /
    • 2014
  • This paper presents the parameters optimization technology for generating the first short stroke lightning current waveform($10/350{\mu}s$) which is necessary for the performance tests of components of lightning protection systems, as required under IEC 62305 and the newly amended IEC 62561. The circuit using the crowbar device specified in IEC 62305 was applied to generate the lightning current waveform. To find the proper parameters of the circuit is not easy because the circuit consists of two parts; circuit I, which relates to the front of current waveform, and circuit II, which relates to the tail. A simulation in PSpise was carried out to find main factors related to the front and tail of $10/350{\mu}s$. The lightning current generator was developed by utilizing the circuit parameters found in the simulation. In the result of experiments, new parameters of the circuits need to be changed because of the difference between the simulation and the experiment results. Using the iterative method, the optimized parameters of the circuits was determined. Also a multistage-type external coil and a damping resistor were proposed to make the efficiency of generation to enhance. According to the result in this paper, an optimized first short stroke lightning current waveform was obtained.

A Study on the Transition & Expectation through Survey for Existing Building and Engineer's Opinion (기존 사무소 건물 및 설비전문가 조사를 통한 설비시스템의 변화와 전망에 대한 연구)

  • Lee, Gwan-Ho;Kim, Nam-Gyu;Park, Jin-Chul;Rhee, Eon-Ku
    • Journal of the Korean Solar Energy Society
    • /
    • v.25 no.2
    • /
    • pp.63-69
    • /
    • 2005
  • This study is the survey of a transition procedure of building services systems(heat source, HVAC, water supply) through the survey of existing office buildings, building design documents. The preference & major consideration of system selection is the engineer's opinions. The results of this survey can be used in selection of building services system design. In this survey, "Hot & cold water generator system" and "single duct CAV+FCU system", "Elevated water tank system" are selected. The most important consideration in system selection is the energy saving in heat source system, and comfort in HVAC system, and water pressure in water supply system. They prefer "steam boiler+absorption chiller system" for heat source system, "steam boiler+ice thermal storage system", "hot & cold water generator system", "district heating+absorption chiller system" : "single duct CAV+FCU system" and "single duct VAV+convector system" for HVAC system: and "booster pump system" for water supply system.

A Study on Energy Storage System(ESS) Application for Dynamic Stability Improvement and Generation Constraint Reduction (대규모 발전단지 상시제약 감소를 위한 에너지 저장장치(ESS) 적용에 관한 연구)

  • Lee, Jae-Gul;Jung, Solyung;Choi, Jang-Hum;Kim, Yong-Hak;Yoon, Yong-Beum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.11
    • /
    • pp.1554-1560
    • /
    • 2017
  • Prepare a lose of 765kV transmission route in power system operation condition, there are some Special Protection Scheme(SPS)s in Korean power system. These SPS can make some preselected generators are tripped to avoid generator overspeed. Because of many of the new large power plants are installed to existing power generation sites due to the siting problem, the number of generator tripped by SPS should be increased. But that can be a cause of system frequency change under the Under Frequency Relay(UFR) 1st pickup level 59.0Hz. Therefore generation constraint should be considered until new transmission lines are installed. In this paper, we propose the ESS application for generation constraint mitigation by frequency damping control of ESS. To analysis an effect of ESS application, we use PSS/E dynamic simulation tool, CBEST model and controller model. The proposed ESS application is applied to the empirical Korean power system.

Analysis of Effect on Personnel Computer in case of turning off Power supply of Circuit Breaker for Low Voltage (저압용차단기 전원 개폐시 개인용 PC에 미치는 영향 분석)

  • Gil, Hyoung-Jun;Shong, Kil-Mok;Kim, Young-Seok;Kim, Chong-Min
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.12
    • /
    • pp.124-129
    • /
    • 2014
  • This paper describes the analysis of the effect on personnel computer in case of turning off power supply of main breaker in general electrical installation. In order to analyze the effect on personnel computer in case of turning off the power supply of main breaker, the switching impulse generator has been designed and fabricated which makes it possible to evaluate the effect on electrical product by switching impulse. The switching impulse tests were carried out for personnel computer according to applied voltage and number of switching impulse. As a consequence, switching impulse had not a significant influence on personnel computer in this study. The varistor of power input section functions as a protection of switching impulse as well as lightning impulse. The results will be used to related organization, and electrical product manufacturer, and residents.

A Study on the Integrated Simulation and Condition Monitoring Scheme for a PMSG-Based Variable Speed Grid-Connected Wind Turbine System under Fault Conditions (PMSG 적용 가변속 계통연계형 풍력발전 시스템의 통합 시뮬레이션 및 스위치 개방고장 진단기법 연구)

  • Kim, Kyeong-Hwa;Song, Hwa-Chang;Choi, Byoung-Wook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.3
    • /
    • pp.65-78
    • /
    • 2013
  • To analyze influences under open fault conditions in switching devices, an integrated simulation and condition monitoring scheme for a permanent magnet synchronous generator (PMSG) based variable speed grid-connected wind turbine system are presented. Among various faults in power electronics components, the open fault in switching devices may arise when the switches are destructed by an accidental over current, or a fuse for short protection is blown out. Under such a faulty condition, the grid-side inverter as well as the generator-side converter does not operate normally, producing an increase of current harmonics, and a reduction in output and efficiency. As an effective way for a condition monitoring of generation system by online basis without requiring any diagnostic apparatus, the estimation schemes for generated voltage, flux linkage, and stator resistance are proposed and the validity of the proposed scheme is proved through comparative simulations.

Design of a Robust Half-bridge Driver IC to a Variation of Process and Power Supply (공정 및 공급전압 변화에 강인한 하프브리지 구동 IC의 설계)

  • Song, Ki-Nam;Kim, Hyoung-Woo;Kim, Ki-Hyun;Seo, Kil-Soo;Jang, Kyung-Oun;Han, Seok-Bung
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.22 no.10
    • /
    • pp.801-807
    • /
    • 2009
  • In this paper, we propose a novel shoot-through protection circuit and pulse generator for half-bridge driver IC. We designed a robust half-bridge driver IC over a variation of processes and power supplies. The proposed circuit is composed a delay circuit using a beta-multiplier reference. The proposed circuit has a lower variation rate of dead time and pulse-width over variation of processes and supply voltages than the conventional circuit. Especially, the proposed circuit has more excellent pulse-width matching of set and reset signals than the conventional circuit. Also, the proposed pulse generator is prevented from fault operations using a logic gate. Dead time and pulse-width of the proposed circuit are typical 250 ns, respectively. The variation ratio is 68%(170 ns) of maximum over variation of processes and supply voltages. The proposed circuit is designed using $1\;{\mu}m$ 650 V BCD (Bipolar, CMOS, DMOS) process parameter, and the simulations are carried out using Spectre simulator of Cadence corporation.